Item96
Resolved
(a) That Application No DOV/20/00851 be APPROVED subject to the following conditions: (i) 3-year timescale for implementation; (ii) Development to accord with the submitted drawings; (iii) Details/specifications of materials and finishes to be submitted; (iv) Joinery details (which shall be of timber construction) for windows and doors to be submitted for approval; (v) All design components shown on the approved drawings to be provided in the finished scheme; (vi) Details of foul and surface water drainage to be submitted for approval; (vii) Details of hardsurfacing materials, which shall be permeable, to be submitted for approval; (viii) Details of landscaping (including replacement trees) and boundary enclosures to be submitted for approval; (ix) Parking spaces to be provided on site; (x) Cycle spaces and refuse storage facilities to be submitted for approval; (xi) The removal of Permitted Development Rights for extensions, porches, changes to the roof and outbuildings; (xii) Details of all external lighting to be submitted for approval; (xiii) Details of biodiversity enhancements to be submitted for approval; (xiv) Details of the arrangements for the management and upkeep of the burial ground to be submitted for approval; (xv) Details of the arrangements for the new location of the memorial plaque/tablet to be removed from the building to be submitted for approval; (xvi) Provision of information board for burial ground; (xvii) Window reveals no less than 80mm; (xviii) Details at scale 1:20 of the finished design of all arched brick window headers shown on approved drawing number; (xix) Details of the roof parapet between plots 1 and 2 shall be submitted for approval; (xx) Archaeology; (xxi) Details of energy efficiency measures to be submitted; (xxii) Prior to the first occupation of the development hereby approved, cable ducting and electrical wiring suitable to facilitate an subsequent installation of (an) 7kW 32amp OLEV-compliant wall or ground-mounted charge point(s) adjacent to the car parking space(s) proposed shall be installed and shall thereafter be retained such that it remains capable of providing the electricity required by any future electric vehicle charging point(s); (xxiii) None of the dwellings hereby approved shall be occupied until any necessary sewage network reinforcement work has been carried out to ensure that adequate wastewater network capacity is available to adequately drain the development. In order to demonstrate that sufficient capacity has been provided, prior to the occupation of any dwelling, details of the drainage network that will serve the development shall be submitted to the Local Planning Authority, accompanied by evidence to demonstrate that the required works have been carried out and that the network does have the required capacity. Occupation shall then not take place until the Local Planning Authority has confirmed in writing that it is satisfied that the submitted details fulfil the necessary requirements. (b) That powers be delegated to the Head of Planning, Regeneration and Development to settle any necessary wording in line with the recommendations and as resolved by the Planning Committee.
Word for word from the decision Dover published for this meeting.
Source: moderngov.dover.gov.uk