Item5
Resolved
(a) That Outline Planning Permission for Application No DOV/20/00419 be APPROVED subject to the completion of a Section 106 legal agreement to secure the necessary contributions and ecological mitigation and compensation measures as set out in the report, and subject to the following conditions: (i) Reserved matters details; (ii) Outline time limit; (iii) Approved plans; (iv) Phasing plan to be approved in writing; (v) Self-build design code to be agreed as part of reserved matters; (vi) Details of play space to form part of reserved matters; (vii) Existing and proposed site levels and building heights; (viii) Internal acoustic requirements for dwellings; (ix) Construction Management Plan (updated to include Environmental Health matters such as dust mitigation etc ); (x) Highway conditions (parking, visibility splays, highway works fully implemented, turning facilities, cycle parking, gradient, surface, works to all footpaths and drainage, bound surface, surface water ); (xi) Sustainable Travel Plan to be agreed prior to commencement; (xii) Completion of the A258 Sandwich Road bus-stop scheme prior to first occupation; (xiii) Public Right of Way upgrades and management scheme; (xiv) Completion of off-site improvements to Mongeham Road prior to commencement and subject to a safety audit process; (xv) Provision and maintenance of a pedestrian connection to Circular Road; (xvi) Full landscaping details of all green spaces; (xvii) Open space management plan; (xviii) Details of children’s play spaces; (xix) Protection of trees and hedges and root protection zones; (xx) Hard landscaping works and boundary details/ enclosures; (xxi) No works on site until final SuDS details are submitted; (xxii) Design details of surface water drainage strategy; (xxiii) Implementation and verification of SuDS scheme; (xxiv) No other infiltration on site other than that approved; (xxv) Full foul drainage strategy for approval; (xxvi) Environmental Construction Management Plan (as set out in report ); (xxvii) Programme of archaeological works; (xxviii) Details to be submitted at reserved matters for compliance with Secured by Design principles; (xxix) Electric vehicle charging points for each dwelling and 10% unallocated and employment parking spaces; (xxx) Broadband connection; (xxxi) 4 Stage contamination, remediation and verification conditions; (xxxii) Reporting of unexpected land contamination; (xxxiii) Three conditions recommended by the Coal Authority; (xxxiv) Update survey to be carried out for badgers prior to commencement; (xxxv) Landscape and ecological mitigation plan setting out safeguards for retained habitats on site (as set out in report ); (xxxvi) Grass-Poly translocation strategy (as set out in report ); (xxxvii) Management plan for new habitat creation, to include details of green roof/brownfield habitat provision; (xxxviii) Design of a sensitive lighting strategy in relation to bats and other nocturnal species (in line with established guidance ); (xxxix) Implementation of a habitat manipulation exercise in relation to reptiles; (xl) Works affecting nesting bird habitat to be undertaken outside of the nesting bird season, or following nesting bird checks; (xli) Sustainable energy measures to be approved in accordance with the approved Energy Statement and Sustainability Assessment; (xlii) BREEAM very good criteria for commercial buildings; (xliii) Floor levels 150mm above ground level; (xliv) No piling on site without prior approval. (b) That powers be delegated to the Head of Planning, Regeneration and Development to settle any necessary planning conditions in line with the issues set out in the recommendation and as resolved by the Planning Committee.
Word for word from the decision Dover published for this meeting.
Source: moderngov.dover.gov.uk