Item82
Resolved
That Application No DOV/21/01113 be APPROVED subject to the following conditions: (i) 3-year standard time limit; (ii) Approved plans; (iii) Samples of materials; (iv) Provision of parking facilities; (v) Electric vehicle charging points; (vi) Measures to prevent the discharge of surface water onto the highway; (vii) Provision of cycle and bin storage prior to first occupation; (viii) Provision and maintenance of 1-metre x 1-metre pedestrian visibility splays behind the footway on both sides with no obstruction over 0.6-metre above the footway level; (ix) Removal of permitted development rights (classes A, B, C, D and E ); (x) Removal of permitted development rights for insertion of window openings at first-floor level; (xi) Hand dug condition and tree protection measures; (xii) Contamination land condition; (xiii) Landscaping scheme; (xiv) Pre-commencement condition requiring submission of a detailed scheme for surface water disposal; (xv) Pre-commencement condition requiring submission of a detailed scheme for foul water drainage; (xvi) Boundary treatment and hard surfacing. (b) That powers be delegated to the Head of Planning, Regeneration and Development to settle any necessary planning conditions in line with the issues set out in the recommendation and as resolved by the Planning Committee.
Word for word from the decision Dover published for this meeting.
Source: moderngov.dover.gov.uk