Item119
Resolved
(a) That, subject to the Local Planning Authority as the ‘competent authority’ for the purposes of the Habitat Regulations being satisfied ( in consultation with Natural England as/if necessary) that discharges of wastewater from Dambridge wastewater treatment works were not likely to have a significant effect on the integrity of the Stodmarsh SAC, SPA and Ramsar site or, alternatively, that satisfactory mitigation could be achieved such that there would be no adverse effect on the integrity of the designated site, Application No DOV/20/00544 be APPROVED subject to the following conditions: (i) 3-year time limit; (ii) Approved plans; (iii) Samples of materials; (iv) Provision of parking and turning facilities; (v) Measures to prevent the discharge of surface water onto the highway; (vi) Pre-commencement condition for demolition and Construction Management Plan; (vii) Use of bound surface for the first 5 metres of the access from the edge of the highway; (viii) Cycle parking provision; (ix) Completion of the access and proposed footway prior to the use of the site commencing; (x) Closure of the existing access prior to the use of the site commencing; (xi) Provision and maintenance of visibility splays with no obstruction over 1 metre above carriageway level within the splay; (xii) Provision of a strip measuring 2.4 metres in width from the edge of the carriageway along the site frontage with no obstructions over 1 metre above carriageway level within the strip, prior to use of the site commencing; (xiii) Provision and maintenance of 2 metres x 2 metres pedestrian visibility splays behind the footway on both sides of the access with no obstructions over 0.6 metres above footway level, prior to the use of the site commencing; (xiv) Bin storage; (xv) Completion of access prior to first use; (xvi) Removal of permitted development rights (classes A, B, D and E ); (xvii) Surface water disposal scheme; (xviii) Foul water drainage scheme; (xix) Bespoke landscaping scheme – site landscaping and also including a cluster of standard and heavy standard trees as shown on the proposed landscaping plan; (xx) Hand-dug condition and tree protection measures including protective fencing; (xxi) Ecology – planting of native species and biodiversity enhancements and mitigation measures as detailed in the report; (xxii) Bat-sensitive lighting scheme; (xxiii) Provision of electric charging points; (xxiv) Building’s recording prior to demolition; (xxv) Demolition to be carried out as a continuous operation with the redevelopment of the site and to protect the character or appearance of the Conservation Area. (b) That powers be delegated to the Planning and Delvelopment Manager to resolve details of any necessary planning conditions and matters covered in recommendation (a) relating to any impacts on the protected Stodmarsh sites in accordance with the issues set out in the report and as resolved by the Planning Committee.
Word for word from the decision Dover published for this meeting.
Source: moderngov.dover.gov.uk