(a) That, subject to the Local Planning Authority, as the ‘competent authority’ for the purposes of the Habitat Regulations, being satisfied (in consultation with Natural England as/if necessary) that discharges of wastewater from the Dambridge wastewater treatment works were not likely to have a significant effect on the integrity of the Stodmarsh SAC, SPA and Ramsar site or, alternatively, that satisfactory mitigation can be achieved, Application No DOV/20/00155 be APPROVED subject to the following conditions: (i) Three-year standard time limit; (ii) Approved plans; (iii) Samples of materials; (iv) Provision of bike and bin storage prior to first occupation; (v) Pre-commencement condition – Demolition and Construction Management Plan (Routing of demolition, construction and delivery vehicles and site personnel; Timing of HGV movements (these are likely to be restricted during school drop-off and pick-up periods); Provision of wheel-washing facilities; Temporary traffic management/signage; Before and after construction of the development, highway condition surveys for highway access routes should be undertaken and a commitment provided to fund the repair of any damage caused by vehicles related to the development; Site access arrangements); (vi) Provision of measures to prevent the discharge of surface water onto the highway; (vii) Provision and permanent retention of the vehicle parking spaces shown on the submitted plans prior to the use of the site commencing, including the retention of public access to the three spaces between units 1 and 2; (viii) Use of a bound surface for the first 5 metres of the access from the edge of the highway; (ix) Provision and permanent retention of secure, covered cycle parking facilities prior to the use of the site commencing, in accordance with details to be submitted and approved by the Local Planning Authority; (x) Completion of the access and associated highway alterations (parking restrictions) shown on the submitted plans prior to the use of the site commencing. Applicant to use best endeavours to secure the necessary Traffic Regulation Order and implement the parking restrictions; (xi) Gradient of the access to be no steeper than 1 in 10 for the first 1.5 metres from the highway boundary and no steeper than 1 in 8 thereafter; (xii) Provision and maintenance of 43 metres x 2.4 metres x 43 metres visibility splays at the access with no obstructions over 1 metre above carriageway level within the splays, prior to use of the site commencing; (xiii) Completion of the step-free paved connection to public footpath EE117 at the rear of the site prior to the use of the site commencing; (xiv) Provision of electric charging points; (xv) Removal of permitted development rights (classes A, B, C, D and E ); (xvi) Removal of permitted development rights for insertion of window openings at first-floor level; (xvii) Joinery details, eaves details, ridge details at 1:10 for the non-designated heritage asset; (xviii) Hand-dug condition and tree protection measures; (xix) Programme of archaeological works; (xx) Ecological mitigation and enhancement works; (xxi) Landscaping scheme; (xxii) Pre-commencement condition requiring submission of a detailed scheme for surface water disposal; (xxiii) Pre-commencement condition requiring submission of a detailed scheme for foul water drainage; (xxiv) Boundary treatment and hard surfacing. (b) That powers be delegated to the Planning and Development Manager to settle any necessary planning conditions in line with the issues set out in the recommendation and as resolved by the Planning Committee.
Word for word from the decision Dover published for this meeting.
Source: moderngov.dover.gov.uk