Resolved
(a) That, subject to the Local Planning Authority, as the ‘competent authority’ for the purposes of the Habitat Regulations, being satisfied (in consultation with Natural England as/if necessary) that discharges of wastewater from the Dambridge wastewater treatment works are not likely to have a significant effect on the integrity of the Stodmarsh SAC, SPA and Ramsar site, or alternatively that satisfactory mitigation can be achieved, Application No DOV/21/00391 be APPROVED subject to the following conditions: (i) Standard 3-year implementation; (ii) Development in accordance with approved plans; (iii) Samples of bricks and slates and details of materials proposed for the external finishes of the building shall be submitted for approval before the construction of the development takes place above ground level; (iv) Details of construction of eaves and rafter ends, verges, barge boards, cills and reveals and joinery of doors and windows and their positioning in the masonry to be submitted for approval; (v) Details/position of vents to be submitted for approval; (vi) Sample panel of brickwork to show brick bond and mortar joints; (vii) Site levels to be submitted for approval; (viii) Details of the means to dispose of surface water and foul water drainage from the site shall be submitted for approval prior to works commencing; (ix) Details of native planting species, enclosures and landscaping to be submitted for approval before the construction of the development exceeds ground level; (x) Recommendations within the Ecological Appraisal for enhancing biodiversity during development and increasing biodiversity post construction to be implemented; (xi) The tree protection measures identified in the Arboricultural Report shall be fully implemented during the construction of the development; (xii) A Construction Management Plan to be submitted for approval; (xiii) No development shall take place on the site until details are submitted to and approved in writing by the Local Planning Authority of measures to demonstrate that the proposal is taking a proactive approach to mitigating and adapting to climate change and minimising energy consumption. This shall include the provision of an electric vehicle charging point; (xiv) Parking spaces as shown on the approved plans shall be provided before first use and retained thereafter; (xv) Provision and maintenance of 1 metre x 1 metre pedestrian visibility splays behind the footway on both sides of the access with no obstructions over 0.6 metres above footway level, prior to the use of the site commencing; (xvi) Provision of bonded surface for the first 5 metres of the depth of the parking spaces; (xvii) Completion of the vehicular crossing prior to use of access; (xviii) Cycle, refuse and recycling facilities to be provided before the first use of the development and retained thereafter; (xix) Removal of permitted development rights – under Class A of the GPDO to cover extensions, extensions and alterations to the roof and outbuildings. (b) That powers be delegated to the Head of Planning and Development to resolve details of any necessary planning conditions and/or legal agreements and matters covered in recommendation I above relating to any impacts on the protected Stodmarsh sites in accordance with the issues set out in the report and as resolved by the Planning Committee.
Word for word from the decision Dover published for this meeting.
Source: moderngov.dover.gov.uk