Item58
Resolved
(a) That Application No DOV/20/00693 be APPROVED subject to the following conditions: (i) Time limit; (ii) Approved plans; (iii) Materials samples; (iv) Window details – recesses; (v) Landscaping scheme; (vi) Retention of existing trees; (vii) Tree protection – root protection zones; (viii) Biodiversity method statement (reptiles/birds/hedgehogs ); (ix) Ecological design strategy – compensatory habitats for reptiles and biodiversity enhancements; (x) Habitat management and monitoring; (xi) Updated reptile survey; (xii) Provision and retention of parking spaces; (xiii) Electric vehicle charging points; (xiv) Cycle parking and refuse storage retention; (xv) Provision of visibility splays – new access; (xvi) Provision of pedestrian visibility splays; (xvii) Use of bound surface for the first 5 metres of the access; (xviii) Construction Management Plan; (xix) Submission of a SuDS drainage scheme prior to commencement; (xx) Submission of drainage infiltration information; (xxi) Submission of a SuDS drainage verification report; (xxii) Contamination safeguarding; (xxiii) Sound insulation measures to safeguard occupiers from the railway track; (xxiv) Sound insulation between the first-floor flats and ground-floor flats adjoining the public house; (xxv) Pub opening times; (xxvi) Archaeological watching brief; (xxvii) Scheme to demonstrate Secured by Design principles. (b) That powers be delegated to the Head of Planning and Development to resolve details of any necessary planning conditions and/or legal agreements in accordance with the issues set out in the report and as resolved by the Planning Committee.
Word for word from the decision Dover published for this meeting.
Source: moderngov.dover.gov.uk