Item80
Resolved
(a) That Application No DOV/22/00668 be APPROVED subject to the following conditions: (i) Time limit; (ii) Plans; (iii) Solar panels shall be matt finish and non- reflective; (iv) Details of colour finish of fencing and other structures; (v) Submission of a construction management plan prior to commencement of development (including details of how the operators of the site will advise construction and delivery vehicles of routing to/from site; parking and turning areas for construction and delivery vehicles and site personnel; timing of deliveries; provision of wheel-washing facilities; temporary traffic management/signage; condition surveys ); (vi) Provision and maintenance of visibility splays prior to commencement of development with no obstructions over 1.05 metres above carriageway level within the splays; (vii) Use of a bound surface for the first 5 metres of the access from the edge of the highway; (viii) Plans demonstrating the detailed design of the proposed construction access to be submitted prior to the commencement of works; (ix) Landscaping (boundary treatments, planting plans – species, schedules, sizes and timescale and replacement of any dead/damaged planting for the lifetime of the development – 40 years ); (x) Biodiversity method statement- (protection of biodiversity during construction ); (xi) Ecological design and management plan; (xii) Bat-sensitive lighting strategy; (xiii) No further external lighting other than that approved as part of the bat-sensitive lighting strategy; (xiv) Submission of a programme of archaeological work including an intrusive field evaluation survey prior to the commencement of development; (xv) Submission of details of the design of the solar panel foundation piles and all other excavations, together with details of alternative measures to secure solar panels, cabling and other infrastructure, to be used across the site. These details shall have regard to the results of the intrusive field evaluation survey, prior to the commencement of development; (xvi) Submission of a detailed sustainable surface water drainage scheme based upon submitted Drainage Statement prior to the development being begun; (xvii) Submission of a verification report pertaining to surface water drainage system prior to first use; (xviii) Restricting infiltration to manage surface water to the parts of the site where information is submitted to demonstrate there is no resultant unacceptable risk to controlled waters and/or ground stability; (xix) Arrays and all associated structures other than soft landscaping to be removed after 40 years; (xx) Submission of decommissioning plan prior to removal of structures; (xxi) Biodiversity method statement – decommissioning. (b) That powers be delegated to the Head of Planning and Development to settle any necessary planning conditions in line with the issues set out in the recommendation and as resolved by the Planning Committee. (Councillor D G Beaney left the meeting during consideration of this item.)
Word for word from the decision Dover published for this meeting.
Source: moderngov.dover.gov.uk