Item63
Resolved
(a) That, subject to the completion of a Section 106 legal agreement to secure the required contributions (as necessary) for Biodiversity Net Gain provisions, SPA payment, affordable housing and developer contributions, Application No DOV/24/00866 be APPROVED subject to the following conditions: (i) Time limits; (ii) Approved plans; (iii) Material details (including samples and roof tile samples for converted barn); (iv) Windows/doors set in reveals; (v) Landscaping and open space provision; (vi) Provision and retention of refuse/recycling storage; (vii) Provision and retention of bicycle storage; (viii) Provision of vehicle parking spaces; (ix) Detailed SuDS scheme; (x) Strategy for potential contamination risks; (xi) Verification report for contamination remediation strategy; (xii) Previously unidentified contamination; (xiii) No piling without consent of the Local Planning Authority; (xiv) Completion and maintenance of the access; (xv) Roads, junctions, street lighting, etc submitted and approved; (xvi) Measures to prevent the discharge of surface water onto the highway; (xvii) Provision and maintenance of the visibility splays; (xviii) Maintenance of vegetation along the access; (xix) Construction management plan including vibration assessment; (xx) Details to demonstrate surface water drainage can be accommodated; (xxi) Details of surface water management; (xxii) Verification report for surface water system; (xxiii) No drainage systems infiltration beyond details in this submission into the ground without consent; (xxiv) Details of foul drainage; (xxv) Programme of archaeological works; (xxvi) Full Building Recording (to Level 2) in line with Historic England Guidance; (xxvii) Housing to meet Building Regulations M4(2) standard; (xxviii) Designing out crime measures; (xxix) Tree and hedge protection measures; (xxx) Construction Environment Management Plan; (xxxi) Biodiversity Enhancement Plan; (xxxii) Provision of bat-sensitive lighting; (xxxiii) Ecological Design Strategy (biodiversity net gain and enhancements); (xxxiv) Habitat management and monitoring plan; (xxxv) Removal of permitted development rights; (xxxvi) Converted barn – joinery details; (xxxvii) Converted barn – details of flues, vents and meter boxes; (xxxviii) Converted barn – survey confirming areas of repointed brickwork, including lime mortar mix details (and sample panel); (xxxix) Access road and green space detail adjacent to Eastry Court Cottages including samples. (b) That powers be delegated to the Head of Planning and Development to settle any necessary planning conditions and legal agreements in line with the issues set out in the recommendation and as resolved by the Planning Committee.
Word for word from the decision Dover published for this meeting.
Source: moderngov.dover.gov.uk