Item90
Resolved
(a) That, subject to matters relating to the Habitats Regulation Assessment being agreed in consultation with Natural England, and the completion of a Section 106 legal agreement to secure the required contributions, affordable housing, uncontrolled pedestrian crossing and public rights of way improvements, Outline Application No DOV/23/01061 be APPROVED subject to the following conditions: (i) Approval of the reserved matters; (ii) Time condition; (iii) List of the approved plans; (iv) Programme of archaeological work; (v) Biodiversity method statement (for the protection of biodiversity ); (vi) The reserved matters for landscape and/or layout (whichever is submitted first) to be accompanied by a supporting document demonstrating how important ecological features have been taken account of in the design of the proposals; (vii) Construction environmental management plan; (viii) Demolition and construction management plan; (ix) Bat-sensitive lighting strategy; (x) Ecological design strategy (addressing habitat enhancement measures ); (xi) Habitat management and monitoring plan; (xii) Samples of external materials; (xiii) Dwellings to meet higher water efficiency standard (under Building Regulations ); (xiv) Inclusion of mitigation measures (double glazing and acoustically treated trickle vents) identified in the noise report; (xv) Construction management plan (highways ); (xvi) Completion of footways and/or footpaths and carriageways (with the exception of the wearing course) between a dwelling and the adopted highway prior to first occupation; (xvii) Provision and retention of vehicle parking spaces to be set out; (xviii) Provision and maintenance of visibility splays shown on the plans (with no obstruction over 1.05 metres above carriageway level within the splays or 0.6 metres where a footway crosses the access ); (xix) Provision and retention of secured covered cycle parking facilities; (xx) Highway improvements, prior to first occupation, as detailed on ‘Proposed site access and Canterbury Road junction’ drawing 20-045/009 Rev.A – a fully measured drawing for final approval by KCC Highways to be submitted; (xxi) Remediation strategy in relation to any contamination found not previously identified; (xxii) No drainage systems infiltration of surface water into the ground unless with the consent of the Local Planning Authority; (xxiii) Foul drainage strategy; (xxiv) No piling or other penetrative foundation methods permitted other than with the consent of the Local Planning Authority; (xxv) Reserved matters to demonstrate requirements for surface water drainage for all rainfall durations and intensities up to and including the climate change adjusted critical 100-year storm can be accommodated within the proposed development layout; (xxvi) Detailed sustainable surface water drainage scheme; (xxvii) Verification report pertaining to the sustainable surface water drainage scheme; (xxviii) Infiltration of surface water only within parts of the site where information is submitted to demonstrate there is no resultant unacceptable risk to controlled waters and/or ground stability; (xxix) Details of measures to be taken to protect public sewers; (xxx) Affordable housing – local lettings plan. (b) That powers be delegated to the Head of Planning and Development to settle any necessary planning conditions, obligations and reasons in line with the issues set out in the recommendation and as resolved by the Planning Committee.
Word for word from the decision Dover published for this meeting.
Source: moderngov.dover.gov.uk