Resolved
(a) That, subject to completion of a Section 106 legal agreement to secure the required contributions, Application No DOV/25/00133 be APPROVED in outline subject to the following conditions: (i) Approval of reserved matters; (ii) Time condition; (iii) Timescale for commencing each phase; (iv) Restriction of no more than 800 dwellings and up to 1,100 square metres mixed-use floor space; (v) List of approved plans (parameter plans); (vi) Phasing plan; (vii) Reserved matters to include specific layout details and document demonstrating how regard has been had to the design code (as well as confirming provision of 2 trees per dwelling, water efficiency measures and M4(2) /( 3) provision); (viii) Samples of materials; (ix) Reserved matters to demonstrate requirements for surface water drainage can be accommodated; (x) Detailed sustainable surface water drainage scheme ( SuDS ); (xi) Verification report pertaining to SuDS ; (xii) Land contamination condition; (xiii) Verification report pertaining to land contamination; (xiv) Remediation of any unexpected contamination; (xv) Restriction of infiltration of surface water other than with agreement; (xvi) Piling/penetrative foundation designs; (xvii) Details of phasing of occupation to be submitted to align with the delivery of any required sewerage network reinforcement; (xviii) Details of proposed means of foul sewerage and surface water disposal; (xix) Removal of foul waste off the site by tanker prohibited; (xx) Details of any landscaping proposals within proximity of public apparatus (in consultation with Southern Water); (xxi) Construction traffic management plan; (xxii) Details/scheme of road crossings, accesses (and their completion), footways/cycleways and improvement works including to Dorman Avenue South, Adisham Road/Spinney Lane junction (to be delivered under a Section278 agreement with KCC Highways) and public right of way improvements (including any signage), highway condition surveys; (xxiii) Specification plans for the spine road (to include details of bus access and infrastructure), progression of the speed rationalisation plan through the TRO process; (xxiv) Details of the speed rationalisation plan and timescale for implementation; (xxv) Updated tree reports/surveys and tree protection measures to be put in place; (xxvi) Scheme of overarching principles for ecology (including mitigation and biodiversity enhancement features, with updated ecological surveys to be submitted alongside reserved matters applications; (xxvii) Embedded ecological mitigation measures to be demonstrated in reserved matters; (xxviii) Landscaping details to include timings, ensuring early delivery of habitat creation in western part of site; (xxix) Ancient woodland scheme (including monitoring of Ackholt Wood with review and submission of details of adaptive measures if required, details of buffer (boundary treatments, planting and signage) and welcome pack for residents; (xxx) Bat-sensitive lighting scheme for each phase; (xxxi) Biodiversity gain plan; (xxxii) Habitat management and maintenance plan (HMMP); (xxxiii) Notice when HMMP works for any phase have started; (xxxiv) Completion of the habitat creation and enhancement works in the HMMP; (xxxv) Submission of monitoring reports in line with HMMP specification; (xxxvi) Demolition and construction management plan; (xxxvii) Heritage management plan; (xxxviii) Heritage and archaeology public engagement strategy; (xxxix) Details of on-site interpretation (heritage); (xl) Programme of archaeological work; (xli) Reserved matters for landscaping to include details of LEAP/LAP/NEAP and public open space (including timescale for provision); (xlii) Travel Plan. (b) That powers be delegated to the Head of Planning and Development to settle and agree any outstanding matters, necessary planning conditions, obligations and legal agreements in line with the issues set out in the recommendation and as resolved by the Planning Committee. (Councillor J L Pout left the meeting during consideration of this item.)