Item87
Resolved
RESOLVED : That the application be approved subject to the conditions detailed in the report and conditions 3 and 22 being amended to read as follows :- Condition 3 . The development hereby approved shall take place in strict accordance with the sequence of development set out on plans 2488.02, 2488.03, 2488.04 and 2488.05 attached to this permission and for the avoidance of doubt development shall proceed in the order Phase 1 first, Phase 2 second, Phase 3 third and Phase 4 last. For the avoidance of doubt no caravans shall be sited within Phase 2 until such times as the works identified in Phase 1 have been completed. Reason: To ensure the orderly progression of the development Condition 22. Prior to the commencement of Phase 2, Phase 3 and Phase 4 of the development hereby approved and prior to the demolition of the agricultural buildings at Brakes Farmhouse checking surveys for bats, breeding birds, great crested newts, otters, water voles and badgers of that part of the site covered by the relevant phase / management centre shall be undertaken in accordance with details to be submitted to and approved by the Local Planning Authority. For the avoidance of doubt the scheme shall include details of appropriate mitigation in the event that these species are found to be present on site or badger setts have formed. Reason: In order to maintain favourable conservation status of badgers, bats, great crested newts, otters, breeding birds and water voles. Application 2 - Extension to Existing Netpark Development Comprising New Building with associated car parking (Outline Application) - Land at The Gables, Sedgefield- Malcolm Guy, County Durham Development Company, Durham - Plan Ref : 7/2008/0340/DM It was explained that outline planning approval was being sought for the next phase of the Netpark scheme. It was proposed to erect 5,000 sq.mts . of floor space for research and development purposes of the former gables site. The means for access and scale of development were to be determined with the detailed appearance and landscaping all reserved for consideration at a later stage. The Committee was informed that the proposed building would consist of a mix of 2 and 3 storey elements. The access to the site would be taken from Joseph Swan Road and that the proposed access would be constructed to serve the proposed development site. Provision would be made for up to 167 car parking spaces within the site. The proposal had been submitted with the Design and Access Statement, Flood Risk Assessment, Ecological Survey and Tree Survey. The proposal accorded with Regional and Local Planning Policy and the scale of the development was commensurate with the existing development at Netpark . It was noted that a range of issues would be addressed at Reserved Matter stage in order to ensure that the plans for the detailed development of the site incorporated renewable energy measures, encouraged sustainable travel, provided a detailed travel plan, incorporated sustainable drainage systems by the imposition of appropriate conditions. RESOLVED : That the application be approved subject to the conditions detailed in the report. Application 3 - The installation of a 22.5 metre Lattice Tower, Housing of Three 3G and Three Future 2G Antennae, an equipment Cabinet, Fenced Compound and Associated Ancillary, piece of land adjacent to existing Thorn Lighting Factory Merrington Lane Industrial Estate, [name removed], Plan Ref : 7/2008/0581/DM It was explained that the application was for the installation of a radio base station at Merrington Lane Industrial Estate Spennymoor to the immediate north of the former Thorns factory and boundary of the Merrington Lane Masterplan area allotments with open countryside beyond. The new base station and associated antenna was required to improve telecommunication cover and capacity in the south Spennymoor area. As the mast exceeded 50 mts . in height and was not permitted under Part 24 of the General Permitted Development Order, the proposal was presented before the Development Control Committee in accordance with the Planning Authority’s scheme of delegation. Vehicular and pedestrian access to the site was achievable from the north via a narrow track linking the adjacent allotments with Coulson Street in the north west . Officers considered that at 22.5 mts . in total height the mast was considered to be extremely large in scale and overbearing to its surroundings and would prove detrimental to the future development of the adjacent site. RESOLVED : That the application be refused for the reasons outlined in the report.
Word for word from the decision Durham published for this meeting.
Source: democracy.durham.gov.uk