Resolved
RESOLVED – that the presentation be received.
Environment Scrutiny Committee decided this item on Tuesday 11 September 2012. Below is the council's own wording, with the papers it was decided on.
Resolved
RESOLVED – that the presentation be received.
Environment Scrutiny Committee 11th September 2012
East Herts Grounds Maintenance Contract – Contract Review 2012
Cliff Cardoza – Head of Environmental Services Ian Sharratt – Parks and Open Spaces Manager Purpose of the Presentation
• Background to the Review • What the Grounds Maintenance Contract covers • Evidence • Future objectives and standards • Procurement decision Background to the Contract • Let in April 2007 for 6 years, 9 months with possible extension for up to a further 7 years • Awarded to John O’Connor (GM) Ltd • Review required after year 5 • Opportunity to review performance and decide whether to extend or re- tender What the contract includes
• Parks and Open Spaces • Highways • Riversmead Housing Association • Some town and parish land What the contract includes • EHC - Parks • Grass cutting • - Fine grass (cut and collect) • - Urban – 80mm • - Rural - 150mm • - Conservation or rough cut – once or twice a year. • Shrubs - High Care (Ornamental) or Standard Care (Standard) beds • Hedges • Woodland maintenance and tree canopy lifting • Sports pitch maintenance • Play area inspection and maintenance • General infrastructure (gates, fences, ‘furniture’ etc.) • Litter and dog bin emptying • Car park sweeping • Allotments • Sponsored roundabouts What the contract includes • Highways Verges under contract to HCC • Grass cutting • - Urban – performance 80mm • - Rural - performance 150mm • - Swathe cut – twice per year • Visibility Cut (Sight lines) – 150mm • Hedges on highway • Maintain access along some some adopted footpaths • Shrub bed weeding / pruning • All roads except A roads and the B1000 What the contract includes
• Riversmead Housing Association • Grass, shrub and hedge maintenance of specified housing estates • Fortnightly “high care” visits to sheltered housing • Spraying of some hard surface areas • Ditches and watercourses • Provisional rate to de-ice footpaths What the Contract doesn’t include • Tree health and safety inspections and maintenance • Repairs and replacement infrastructure (e.g. fences, steps, paths) • Sports pitch bookings • Closed churchyards • Enclosed gardens around EHC leased buildings • Highway pavement weed spraying • Control of Japanese Knotweed EHC Contract Standards- Grass TYPE CLASSIFICATION DESCRIPTION PERIOD STANDARD C Park Grassland Usually large open spaces. Usually cut with 1st Apr - 31st Oct Minimum height - 25mm gang mowers in the main. Includes 1st Nov – 31st Mar Maximum height - 75mm football pitches. Minimum height - 50mm Maximum height - 75mm
E General Amenity Generally amenity land and open spaces, All Year Minimum height - 25mm Grass and small parks, mainly in urban Maximum height - 80mm areas. Usually cut with ride on rotary or cylinder mowers.
B Box Mowing High High Amenity Parks at Hertford Castle and 1st Apr - 31st Oct Minimum height 12mm Amenity Grass Bishop’s Stortford Castle Grounds. 1st Nov – 31st Mar Maximum height - 25mm Usually cut with a rotary or cylinder Minimum height - 20mm mower with collection box Maximum height - 35mm
I Conservation Cut Cut and collect and dispose of arisings on Twice per year Height after cutting - 75mm (Meadow certain park areas with aim of keeping March and Grass) nutrient levels low and help disperse August or July seeds to encourage wild flowers and September as instructed
J Rough Grass Cut only on certain park areas to maintain a Twice per year Height after cutting – 75mm ‘naturalised’ appearance March and August
F Rural Grass Cut Grass cutting of land owned by East All Year Min – 50mm Hertfordshire District Council – mainly Max – 150mm roadside verges in rural areas. Mainly cut with ride-on cylinder or rotary mowers but may require tractor and side arm or strimming in some locations. EHC Shrubs • Shrub beds - High Care / Standard Care
• All shrub beds are pruned once per year.
• Litter is collected during all visits.
• Site Manuals – pruning at the correct time
• Dead shrubs are reported and removed.
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
PDF |
Background Briefing Presentation on Grounds Maintenance ContractReport | 2.3 MB | DownloadRead as text |
Follow Environment Scrutiny Committee at East Hertfordshire and we tell you when its next papers are published, before the meeting rather than after it.
| Meeting | Decision | Outcome | |
|---|---|---|---|
| 23 Feb 2016 | Environment Scrutiny Healthcheck October to December 2015RESOLVED – that the reported performance for the period October to December 2015 be approved. | Approved | Open |
| 23 Feb 2016 | Footway and Grassed Verge Parking Enforcement PolicyRESOLVED – that the Executive be advised that (A) a targeted local ban for the implementation of footway and grassed ... | Decided | Open |
| 23 Feb 2016 | Car Parking Fees and Charges 2016/17RESOLVED – that (A) that the outcome of the trial of new car park charges be noted; and (B) current trial charges be ... | Noted | Open |
| 23 Feb 2016 | Planning and Enforcement ReviewRESOLVED – that the Executive be advised that (A) the revised Planning Enforcement Policy be supported; (B) Officers’... | Decided | Open |
| 23 Feb 2016 | Waste and Street Cleansing Contract - Future Service ConsiderationsRESOLVED – that a Task and Finish Group comprising of 5 or 6 Members be set up to consider the future objectives and ... | Decided | Open |
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Keeps you signed in and runs your free-paper allowance. Always on.
Counts visits and which pages are used. First-party only, no advertising, never shared.