13 items, 47 papersAbout 33 MB, led by Strategic Flood Risk Assessment, August 2016.
No exempt items listedEvery item is due to be heard in public.
This meeting was held15 September 2016
13items
47papers
1decisions
–exempt
Running order, sized by papersItem 51 to 63
ReportsProcedureExempt parts

The agenda, item by item

What the committee will consider, in order, with every paper attached to its item. Strategic Flood Risk Assessment, August 2016 is the main business.

51
Report

East Herts Draft District Plan – Bishop’s Stortford – Settlement Appraisal and New Draft Chapter 5

4 papers, 2.1 MBSearch inside with Pro
ReportChapter 5 Bishops Stortford: ERP A (implications)99 KBCopy on its way
ReportChapter 5 Bishops Stortford: ERP B (Settlement Appraisals).compressed1 MBCopy on its way
ReportChapter 5 Bishops Stortford: ERP C (Revised Chapter)851 KBCopy on its way
ReportEast Herts Draft District Plan: Bishop’s Stortford: Settlement Appraisal and New Draft Chapter 5132 KBCopy on its way
52
Report

East Herts Draft District Plan – Chapter 10 – Villages: Response to Issues Raised During Preferred Options Consultation

3 papers, 842 KBSearch inside with Pro
ReportChapter 10: Villages Response to issues: ERP A (implications)99 KBCopy on its way
ReportChapter 10: Villages Response to issues: ERP B (Issues Report)618 KBCopy on its way
ReportEast Herts Draft District Plan: Chapter 10: Villages: Response to Issues Raised During Preferred Options Consultation125 KBCopy on its way
53
Report

East Herts Draft District Plan – Villages Appraisal and New Draft Chapter 10

4 papers, 1.5 MBSearch inside with Pro
ReportEast Herts Draft District Plan: Villages Appraisal and New Draft Chapter 10130 KBCopy on its way
ReportVillages Appraisal and New Draft Chapter 10: ERPA (implications)99 KBCopy on its way
ReportVillages Appraisal and New Draft Chapter 10: ERPB (Settlement Appraisal: Villages)413 KBCopy on its way
ReportVillages Appraisal and New Draft Chapter 10: ERPC (New Chapter 10 Draft)854 KBCopy on its way
54
Report

East Herts Draft District Plan – Appendices: Response to Issues Raised During Preferred Options Consultation and Updated Appendix C: Monitoring Framework and Appendix D: Glossary

5 papers, 869 KBSearch inside with Pro
ReportAppendices Response to Issues Raised: ERP A (implications)99 KBCopy on its way
ReportAppendices Response to Issues Raised: ERP B (Issues Report)145 KBCopy on its way
AppendixAppendices Response to Issues Raised: ERP C (Appendix C: Monitoring Framework)128 KBCopy on its way
AppendixAppendices Response to Issues Raised: ERP D (Appendix D Glossary)288 KBCopy on its way
AppendixEast Herts Draft District Plan: Appendices: Response to Issues Raised During Preferred Options Consultation and Updated Appendix C: Monitoring Framework and Appendix D: Glossary209 KBCopy on its way
55
Report

East Herts District Plan - Proposed Amendments to Final Text of the East Herts District Plan Pre-Submission Version, 2016

4 papers, 696 KBSearch inside with Pro
ReportEast Herts District Plan: Proposed Amendments to Final Text of the East Herts District Plan Pre-Submission Version, 2016121 KBCopy on its way
ReportProposed Amendments to Final Text: ERP A (implications)99 KBCopy on its way
ReportProposed Amendments to Final Text: ERP B (Amendments Table)245 KBCopy on its way
ReportProposed Amendments to Final Text: Tabled document231 KBCopy on its way
56
Report

Draft Harlow Strategic Sites Assessment, September 2016

3 papers, 4.2 MBSearch inside with Pro
ReportDraft Harlow Strategic Sites Assessment, September 2016: ERPA (implications)99 KBCopy on its way
ReportDraft Harlow Strategic Sites Assessment, September 2016: ERPB (HSSA)4 MBCopy on its way
ReportDraft Harlow Strategic Sites Assessment, September 2016126 KBCopy on its way
57
ReportMain business

Strategic Flood Risk Assessment, August 2016

Note – Appendices are enclosed as a separate document pack.

6 papers, 15 MBSearch inside with Pro
Appendix2016s4502_Appendix_A_Watercourses_EHDC_SFRA_013 MBCopy on its way
Appendix2016s4502_Appendix_A_Watercourses_EHDC_SFRA_024 MBCopy on its way
Appendix2016s4502_Appendix_A_Watercourses_EHDC_SFRA_034 MBCopy on its way
ReportStrategic Flood Risk Assessment: ERP A (implications)99 KBCopy on its way
ReportStrategic Flood Risk Assessment: ERP B (SFRA).compressed4 MBCopy on its way
ReportStrategic Flood Risk Assessment, August 2016109 KBCopy on its way
58
Report

Sustainability Appraisal (SA) of the East Herts District Plan - Pre-Submission Version 2016

4 papers, 2.4 MBSearch inside with Pro
ReportSustainability Appraisal (SA) of the East Herts District Plan: Pre-Submission Version 2016204 KBCopy on its way
ReportSustainability Appraisal: ERP A (implications)100 KBCopy on its way
ReportSustainability Appraisal: ERPB (SA Report)2 MBCopy on its way
ReportSustainability Appraisal: ERPB (non-technical summary)140 KBCopy on its way
59
Report

Habitat Regulations Assessment (HRA) of the East Herts District Plan - Pre-Submission Version 2016

4 papers, 3.3 MBSearch inside with Pro
ReportHabitat Regulations Assessment (HRA) of the East Herts District Plan: Pre-Submission Version 2016206 KBCopy on its way
ReportHabitat Regulations Assessment: ERP A (implications)99 KBCopy on its way
ReportHabitat Regulations Assessment: ERP B (HRA)2 MBCopy on its way
AppendixHabitat Regulations Assessment: ERP C (HRA Appendix A).compressed1 MBCopy on its way
60
Report

Infrastructure Delivery Plan (IDP) Version 1, September 2016

3 papers, 441 KBSearch inside with Pro
ReportInfrastructure Delivery Plan (IDP) Version 1, September 2016111 KBCopy on its way
ReportInfrastructure Delivery Plan: ERP A (implications)99 KBCopy on its way
ReportInfrastructure Delivery Plan: ERP B (IDP).compressed231 KBCopy on its way
61
Report

East Herts District Plan – Pre-Submission Version 2016

Note – Essential Reference Paper ‘B’ is enclosed as a separate document pack.

6 papers, 1.2 MBSearch inside with Pro
Report50018: EH District Plan Front Cover196 KBCopy on its way
ReportChapter 1- Introduction176 KBCopy on its way
ReportChapter 2- Vision and Strategic Objectives205 KBCopy on its way
ReportChapter 3- Development Strategy236 KBCopy on its way
ReportDistrict Plan Pre-submission: ERP A (implications)102 KBCopy on its way
ReportEast Herts District Plan: Pre-Submission Version 2016247 KBCopy on its way
62
Procedure

Chairman's Announcements

63
Report

Minutes - 8 September 2016

To approve as a correct record the Minutes of the meeting of the Panel held on 8 September 2016.

Decision: RESOLVED – that the Minutes of the meeting held on 8 September be approved as a correct record and signed by the Chairman. Decision page

1 paper, 142 KBSearch inside with Pro
ReportMinutes: 8 September 2016142 KBCopy on its way
Read inside all 47 papersPro opens every page, searches every appendix, and keeps the papers if the council removes them.

What this meeting moved on

7 journeys

The main business: Strategic Flood Risk Assessment, August 2016

Item 57 is where most of this meeting's papers sit: 6 papers, about 15 MB.

Item 57

Strategic Flood Risk Assessment, August 2016

Note – Appendices are enclosed as a separate document pack.

What is in the pack6 papers, about 15 MB
Appendix
2016s4502_Appendix_A_Watercourses_EHDC_SFRA_01Supporting paper
3 MB
Appendix
2016s4502_Appendix_A_Watercourses_EHDC_SFRA_02Supporting paper
4 MB
Appendix
2016s4502_Appendix_A_Watercourses_EHDC_SFRA_03Supporting paper
4 MB
Report
Strategic Flood Risk Assessment: ERP A (implications)The report to the committee
99 KB
Report
Strategic Flood Risk Assessment: ERP B (SFRA).compressedThe report to the committee
4 MB
Report
Strategic Flood Risk Assessment, August 2016The report to the committee
109 KB
Read and search every page of this itemPro opens all 6 papers, and keeps them if the council removes them.
Get ProCopy on its way

How this item got here

This committee has dealt with the subject before.

25 February 2016Strategic Land Availability Assessment Update
25 August 2016Strategic Land Availability Assessment, August 2016
15 September 2016Strategic Flood Risk Assessment, August 2016This meeting.

Every paper for this meeting

All 47 papers in one list, with the item each belongs to, its size, and our copy of it. Download any paper from our archive once signed in; read and search it here with Pro.

PaperSizeOur copy
Chapter 5 Bishops Stortford: ERP A (implications)Item 51, East Herts Draft District Plan – Bishop’s Stortford – Settlement Appraisal and New Draft Chapter 5
99 KB
Copy queued
Copy on its wayRead here
Chapter 5 Bishops Stortford: ERP B (Settlement Appraisals).compressedItem 51, East Herts Draft District Plan – Bishop’s Stortford – Settlement Appraisal and New Draft Chapter 5
1 MB
Copy queued
Copy on its wayRead here
Chapter 5 Bishops Stortford: ERP C (Revised Chapter)Item 51, East Herts Draft District Plan – Bishop’s Stortford – Settlement Appraisal and New Draft Chapter 5
851 KB
Copy queued
Copy on its wayRead here
East Herts Draft District Plan: Bishop’s Stortford: Settlement Appraisal and New Draft Chapter 5Item 51, East Herts Draft District Plan – Bishop’s Stortford – Settlement Appraisal and New Draft Chapter 5
132 KB
Copy queued
Copy on its wayRead here
Chapter 10: Villages Response to issues: ERP A (implications)Item 52, East Herts Draft District Plan – Chapter 10 – Villages: Response to Issues Raised During Preferred Options Consultation
99 KB
Copy queued
Copy on its wayRead here
Chapter 10: Villages Response to issues: ERP B (Issues Report)Item 52, East Herts Draft District Plan – Chapter 10 – Villages: Response to Issues Raised During Preferred Options Consultation
618 KB
Copy queued
Copy on its wayRead here
East Herts Draft District Plan: Chapter 10: Villages: Response to Issues Raised During Preferred Options ConsultationItem 52, East Herts Draft District Plan – Chapter 10 – Villages: Response to Issues Raised During Preferred Options Consultation
125 KB
Copy queued
Copy on its wayRead here
East Herts Draft District Plan: Villages Appraisal and New Draft Chapter 10Item 53, East Herts Draft District Plan – Villages Appraisal and New Draft Chapter 10
130 KB
Copy queued
Copy on its wayRead here
Villages Appraisal and New Draft Chapter 10: ERPA (implications)Item 53, East Herts Draft District Plan – Villages Appraisal and New Draft Chapter 10
99 KB
Copy queued
Copy on its wayRead here
Villages Appraisal and New Draft Chapter 10: ERPB (Settlement Appraisal: Villages)Item 53, East Herts Draft District Plan – Villages Appraisal and New Draft Chapter 10
413 KB
Copy queued
Copy on its wayRead here
Villages Appraisal and New Draft Chapter 10: ERPC (New Chapter 10 Draft)Item 53, East Herts Draft District Plan – Villages Appraisal and New Draft Chapter 10
854 KB
Copy queued
Copy on its wayRead here
Appendices Response to Issues Raised: ERP A (implications)Item 54, East Herts Draft District Plan – Appendices: Response to Issues Raised During Preferred Options Consultation and Updated Appendix C: Monitoring Framework and Appendix D: Glossary
99 KB
Copy queued
Copy on its wayRead here
Appendices Response to Issues Raised: ERP B (Issues Report)Item 54, East Herts Draft District Plan – Appendices: Response to Issues Raised During Preferred Options Consultation and Updated Appendix C: Monitoring Framework and Appendix D: Glossary
145 KB
Copy queued
Copy on its wayRead here
Appendices Response to Issues Raised: ERP C (Appendix C: Monitoring Framework)Item 54, East Herts Draft District Plan – Appendices: Response to Issues Raised During Preferred Options Consultation and Updated Appendix C: Monitoring Framework and Appendix D: Glossary
128 KB
Copy queued
Copy on its wayRead here
Appendices Response to Issues Raised: ERP D (Appendix D Glossary)Item 54, East Herts Draft District Plan – Appendices: Response to Issues Raised During Preferred Options Consultation and Updated Appendix C: Monitoring Framework and Appendix D: Glossary
288 KB
Copy queued
Copy on its wayRead here
East Herts Draft District Plan: Appendices: Response to Issues Raised During Preferred Options Consultation and Updated Appendix C: Monitoring Framework and Appendix D: GlossaryItem 54, East Herts Draft District Plan – Appendices: Response to Issues Raised During Preferred Options Consultation and Updated Appendix C: Monitoring Framework and Appendix D: Glossary
209 KB
Copy queued
Copy on its wayRead here
East Herts District Plan: Proposed Amendments to Final Text of the East Herts District Plan Pre-Submission Version, 2016Item 55, East Herts District Plan - Proposed Amendments to Final Text of the East Herts District Plan Pre-Submission Version, 2016
121 KB
Copy queued
Copy on its wayRead here
Proposed Amendments to Final Text: ERP A (implications)Item 55, East Herts District Plan - Proposed Amendments to Final Text of the East Herts District Plan Pre-Submission Version, 2016
99 KB
Copy queued
Copy on its wayRead here
Proposed Amendments to Final Text: ERP B (Amendments Table)Item 55, East Herts District Plan - Proposed Amendments to Final Text of the East Herts District Plan Pre-Submission Version, 2016
245 KB
Copy queued
Copy on its wayRead here
Proposed Amendments to Final Text: Tabled documentItem 55, East Herts District Plan - Proposed Amendments to Final Text of the East Herts District Plan Pre-Submission Version, 2016
231 KB
Copy queued
Copy on its wayRead here
Draft Harlow Strategic Sites Assessment, September 2016: ERPA (implications)Item 56, Draft Harlow Strategic Sites Assessment, September 2016
99 KB
Copy queued
Copy on its wayRead here
Draft Harlow Strategic Sites Assessment, September 2016: ERPB (HSSA)Item 56, Draft Harlow Strategic Sites Assessment, September 2016
4 MB
Copy queued
Copy on its wayRead here
Draft Harlow Strategic Sites Assessment, September 2016Item 56, Draft Harlow Strategic Sites Assessment, September 2016
126 KB
Copy queued
Copy on its wayRead here
2016s4502_Appendix_A_Watercourses_EHDC_SFRA_01Item 57, Strategic Flood Risk Assessment, August 2016
3 MB
Copy queued
Copy on its wayRead here
2016s4502_Appendix_A_Watercourses_EHDC_SFRA_02Item 57, Strategic Flood Risk Assessment, August 2016
4 MB
Copy queued
Copy on its wayRead here
2016s4502_Appendix_A_Watercourses_EHDC_SFRA_03Item 57, Strategic Flood Risk Assessment, August 2016
4 MB
Copy queued
Copy on its wayRead here
Strategic Flood Risk Assessment: ERP A (implications)Item 57, Strategic Flood Risk Assessment, August 2016
99 KB
Copy queued
Copy on its wayRead here
Strategic Flood Risk Assessment: ERP B (SFRA).compressedItem 57, Strategic Flood Risk Assessment, August 2016
4 MB
Copy queued
Copy on its wayRead here
Strategic Flood Risk Assessment, August 2016Item 57, Strategic Flood Risk Assessment, August 2016
109 KB
Copy queued
Copy on its wayRead here
Sustainability Appraisal (SA) of the East Herts District Plan: Pre-Submission Version 2016Item 58, Sustainability Appraisal (SA) of the East Herts District Plan - Pre-Submission Version 2016
204 KB
Copy queued
Copy on its wayRead here
Sustainability Appraisal: ERP A (implications)Item 58, Sustainability Appraisal (SA) of the East Herts District Plan - Pre-Submission Version 2016
100 KB
Copy queued
Copy on its wayRead here
Sustainability Appraisal: ERPB (SA Report)Item 58, Sustainability Appraisal (SA) of the East Herts District Plan - Pre-Submission Version 2016
2 MB
Copy queued
Copy on its wayRead here
Sustainability Appraisal: ERPB (non-technical summary)Item 58, Sustainability Appraisal (SA) of the East Herts District Plan - Pre-Submission Version 2016
140 KB
Copy queued
Copy on its wayRead here
Habitat Regulations Assessment (HRA) of the East Herts District Plan: Pre-Submission Version 2016Item 59, Habitat Regulations Assessment (HRA) of the East Herts District Plan - Pre-Submission Version 2016
206 KB
Copy queued
Copy on its wayRead here
Habitat Regulations Assessment: ERP A (implications)Item 59, Habitat Regulations Assessment (HRA) of the East Herts District Plan - Pre-Submission Version 2016
99 KB
Copy queued
Copy on its wayRead here
Habitat Regulations Assessment: ERP B (HRA)Item 59, Habitat Regulations Assessment (HRA) of the East Herts District Plan - Pre-Submission Version 2016
2 MB
Copy queued
Copy on its wayRead here
Habitat Regulations Assessment: ERP C (HRA Appendix A).compressedItem 59, Habitat Regulations Assessment (HRA) of the East Herts District Plan - Pre-Submission Version 2016
1 MB
Copy queued
Copy on its wayRead here
Infrastructure Delivery Plan (IDP) Version 1, September 2016Item 60, Infrastructure Delivery Plan (IDP) Version 1, September 2016
111 KB
Copy queued
Copy on its wayRead here
Infrastructure Delivery Plan: ERP A (implications)Item 60, Infrastructure Delivery Plan (IDP) Version 1, September 2016
99 KB
Copy queued
Copy on its wayRead here
Infrastructure Delivery Plan: ERP B (IDP).compressedItem 60, Infrastructure Delivery Plan (IDP) Version 1, September 2016
231 KB
Copy queued
Copy on its wayRead here
50018: EH District Plan Front CoverItem 61, East Herts District Plan – Pre-Submission Version 2016
196 KB
Copy queued
Copy on its wayRead here
Chapter 1- IntroductionItem 61, East Herts District Plan – Pre-Submission Version 2016
176 KB
Copy queued
Copy on its wayRead here
Chapter 2- Vision and Strategic ObjectivesItem 61, East Herts District Plan – Pre-Submission Version 2016
205 KB
Copy queued
Copy on its wayRead here
Chapter 3- Development StrategyItem 61, East Herts District Plan – Pre-Submission Version 2016
236 KB
Copy queued
Copy on its wayRead here
District Plan Pre-submission: ERP A (implications)Item 61, East Herts District Plan – Pre-Submission Version 2016
102 KB
Copy queued
Copy on its wayRead here
East Herts District Plan: Pre-Submission Version 2016Item 61, East Herts District Plan – Pre-Submission Version 2016
247 KB
Copy queued
Copy on its wayRead here
Minutes: 8 September 2016Item 63, Minutes - 8 September 2016
142 KB
Copy queued
Copy on its wayRead here

Last time, and what carried over

The committee last met on 8 September 2016. 7 of its items lead into this meeting; 4 items are new. Point at any item to follow a thread. Procedural items are left out.

Sep8
8 September 20169 items, 31 papers
Held
carried over
Sep15
15 September 201613 items, 47 papers
Held
42
East Herts Draft District Plan – New Draft Chapter 3 – Development Strategy
43
East Herts Draft District Plan – New Draft Chapter 4 – Green Belt and Rural Area Beyond the Green Belt
44
East Herts Draft District Plan – Chapter 5 – Bishop’s Stortford: Response to Issues Raised During Preferred Options Consultation
45
East Herts Draft District Plan – Buntingford – Settlement Appraisal and New Draft Chapter 6
46
East Herts Draft District Plan – Hertford – Settlement Appraisal and New Draft Chapter 7
47
East Herts Draft District Plan – The Gilston Area – Draft Concept Framework, Settlement Appraisal and New Draft Chapter 11Note – Essential Reference Paper ‘D’ enclosed.
48
East Herts Draft District Plan – East of Stevenage – Settlement Appraisal and New Draft Chapter 12
50
Minutes – 25 August 2016To approve as a correct record the Minutes of the meeting of the...
51
East Herts Draft District Plan – Bishop’s Stortford – Settlement Appraisal and New Draft Chapter 5
52
East Herts Draft District Plan – Chapter 10 – Villages: Response to Issues Raised During Preferred Options Consultation
53
East Herts Draft District Plan – Villages Appraisal and New Draft Chapter 10
54
East Herts Draft District Plan – Appendices: Response to Issues Raised During Preferred Options Consultation and Updated Appendix C: Monitoring Framework and Appendix D: Glossary
55
East Herts District Plan - Proposed Amendments to Final Text of the East Herts District Plan Pre-Submission Version, 2016
56
Draft Harlow Strategic Sites Assessment, September 2016New this time
57
Strategic Flood Risk Assessment, August 2016New this time
58
Sustainability Appraisal (SA) of the East Herts District Plan - Pre-Submission Version 2016
59
Habitat Regulations Assessment (HRA) of the East Herts District Plan - Pre-Submission Version 2016
60
Infrastructure Delivery Plan (IDP) Version 1, September 2016New this time
61
East Herts District Plan – Pre-Submission Version 2016Note – Essential Reference Paper ‘B’ is enclosed as a separate...
63
Minutes - 8 September 2016New this time

The threads

  • East Herts Draft District Plan – New Draft Chapter 3 – Development Strategy leads to item 51, East Herts Draft District Plan – Bishop’s Stortford – Settlement Appraisal and New Draft Chapter 5
  • East Herts Draft District Plan – New Draft Chapter 3 – Development Strategy leads to item 52, East Herts Draft District Plan – Chapter 10 – Villages: Response to Issues Raised During Preferred Options Consultation
  • East Herts Draft District Plan – New Draft Chapter 3 – Development Strategy leads to item 53, East Herts Draft District Plan – Villages Appraisal and New Draft Chapter 10
  • East Herts Draft District Plan – New Draft Chapter 3 – Development Strategy leads to item 54, East Herts Draft District Plan – Appendices: Response to Issues Raised During Preferred Options Consultation and Updated Appendix C: Monitoring Framework and Appendix D: Glossary
  • East Herts Draft District Plan – New Draft Chapter 3 – Development Strategy leads to item 55, East Herts District Plan - Proposed Amendments to Final Text of the East Herts District Plan Pre-Submission Version, 2016
  • East Herts Draft District Plan – New Draft Chapter 3 – Development Strategy leads to item 58, Sustainability Appraisal (SA) of the East Herts District Plan - Pre-Submission Version 2016
  • East Herts Draft District Plan – New Draft Chapter 3 – Development Strategy leads to item 59, Habitat Regulations Assessment (HRA) of the East Herts District Plan - Pre-Submission Version 2016
  • East Herts Draft District Plan – New Draft Chapter 3 – Development Strategy leads to item 61, East Herts District Plan – Pre-Submission Version 2016
  • East Herts Draft District Plan – New Draft Chapter 4 – Green Belt and Rural Area Beyond the Green Belt leads to item 51, East Herts Draft District Plan – Bishop’s Stortford – Settlement Appraisal and New Draft Chapter 5
  • East Herts Draft District Plan – New Draft Chapter 4 – Green Belt and Rural Area Beyond the Green Belt leads to item 52, East Herts Draft District Plan – Chapter 10 – Villages: Response to Issues Raised During Preferred Options Consultation
  • East Herts Draft District Plan – New Draft Chapter 4 – Green Belt and Rural Area Beyond the Green Belt leads to item 53, East Herts Draft District Plan – Villages Appraisal and New Draft Chapter 10
  • East Herts Draft District Plan – New Draft Chapter 4 – Green Belt and Rural Area Beyond the Green Belt leads to item 54, East Herts Draft District Plan – Appendices: Response to Issues Raised During Preferred Options Consultation and Updated Appendix C: Monitoring Framework and Appendix D: Glossary
  • East Herts Draft District Plan – New Draft Chapter 4 – Green Belt and Rural Area Beyond the Green Belt leads to item 55, East Herts District Plan - Proposed Amendments to Final Text of the East Herts District Plan Pre-Submission Version, 2016
  • East Herts Draft District Plan – New Draft Chapter 4 – Green Belt and Rural Area Beyond the Green Belt leads to item 58, Sustainability Appraisal (SA) of the East Herts District Plan - Pre-Submission Version 2016
  • East Herts Draft District Plan – New Draft Chapter 4 – Green Belt and Rural Area Beyond the Green Belt leads to item 59, Habitat Regulations Assessment (HRA) of the East Herts District Plan - Pre-Submission Version 2016
  • East Herts Draft District Plan – New Draft Chapter 4 – Green Belt and Rural Area Beyond the Green Belt leads to item 61, East Herts District Plan – Pre-Submission Version 2016
  • East Herts Draft District Plan – Chapter 5 – Bishop’s Stortford: Response to Issues Raised During Preferred Options Consultation leads to item 51, East Herts Draft District Plan – Bishop’s Stortford – Settlement Appraisal and New Draft Chapter 5
  • East Herts Draft District Plan – Chapter 5 – Bishop’s Stortford: Response to Issues Raised During Preferred Options Consultation leads to item 52, East Herts Draft District Plan – Chapter 10 – Villages: Response to Issues Raised During Preferred Options Consultation
  • East Herts Draft District Plan – Chapter 5 – Bishop’s Stortford: Response to Issues Raised During Preferred Options Consultation leads to item 53, East Herts Draft District Plan – Villages Appraisal and New Draft Chapter 10
  • East Herts Draft District Plan – Chapter 5 – Bishop’s Stortford: Response to Issues Raised During Preferred Options Consultation leads to item 54, East Herts Draft District Plan – Appendices: Response to Issues Raised During Preferred Options Consultation and Updated Appendix C: Monitoring Framework and Appendix D: Glossary
  • East Herts Draft District Plan – Chapter 5 – Bishop’s Stortford: Response to Issues Raised During Preferred Options Consultation leads to item 55, East Herts District Plan - Proposed Amendments to Final Text of the East Herts District Plan Pre-Submission Version, 2016
  • East Herts Draft District Plan – Chapter 5 – Bishop’s Stortford: Response to Issues Raised During Preferred Options Consultation leads to item 58, Sustainability Appraisal (SA) of the East Herts District Plan - Pre-Submission Version 2016
  • East Herts Draft District Plan – Chapter 5 – Bishop’s Stortford: Response to Issues Raised During Preferred Options Consultation leads to item 59, Habitat Regulations Assessment (HRA) of the East Herts District Plan - Pre-Submission Version 2016
  • East Herts Draft District Plan – Chapter 5 – Bishop’s Stortford: Response to Issues Raised During Preferred Options Consultation leads to item 61, East Herts District Plan – Pre-Submission Version 2016
  • East Herts Draft District Plan – Buntingford – Settlement Appraisal and New Draft Chapter 6 leads to item 51, East Herts Draft District Plan – Bishop’s Stortford – Settlement Appraisal and New Draft Chapter 5
  • East Herts Draft District Plan – Buntingford – Settlement Appraisal and New Draft Chapter 6 leads to item 52, East Herts Draft District Plan – Chapter 10 – Villages: Response to Issues Raised During Preferred Options Consultation
  • East Herts Draft District Plan – Buntingford – Settlement Appraisal and New Draft Chapter 6 leads to item 53, East Herts Draft District Plan – Villages Appraisal and New Draft Chapter 10
  • East Herts Draft District Plan – Buntingford – Settlement Appraisal and New Draft Chapter 6 leads to item 54, East Herts Draft District Plan – Appendices: Response to Issues Raised During Preferred Options Consultation and Updated Appendix C: Monitoring Framework and Appendix D: Glossary
  • East Herts Draft District Plan – Buntingford – Settlement Appraisal and New Draft Chapter 6 leads to item 55, East Herts District Plan - Proposed Amendments to Final Text of the East Herts District Plan Pre-Submission Version, 2016
  • East Herts Draft District Plan – Buntingford – Settlement Appraisal and New Draft Chapter 6 leads to item 58, Sustainability Appraisal (SA) of the East Herts District Plan - Pre-Submission Version 2016
  • East Herts Draft District Plan – Buntingford – Settlement Appraisal and New Draft Chapter 6 leads to item 59, Habitat Regulations Assessment (HRA) of the East Herts District Plan - Pre-Submission Version 2016
  • East Herts Draft District Plan – Buntingford – Settlement Appraisal and New Draft Chapter 6 leads to item 61, East Herts District Plan – Pre-Submission Version 2016
  • East Herts Draft District Plan – Hertford – Settlement Appraisal and New Draft Chapter 7 leads to item 51, East Herts Draft District Plan – Bishop’s Stortford – Settlement Appraisal and New Draft Chapter 5
  • East Herts Draft District Plan – Hertford – Settlement Appraisal and New Draft Chapter 7 leads to item 52, East Herts Draft District Plan – Chapter 10 – Villages: Response to Issues Raised During Preferred Options Consultation
  • East Herts Draft District Plan – Hertford – Settlement Appraisal and New Draft Chapter 7 leads to item 53, East Herts Draft District Plan – Villages Appraisal and New Draft Chapter 10
  • East Herts Draft District Plan – Hertford – Settlement Appraisal and New Draft Chapter 7 leads to item 54, East Herts Draft District Plan – Appendices: Response to Issues Raised During Preferred Options Consultation and Updated Appendix C: Monitoring Framework and Appendix D: Glossary
  • East Herts Draft District Plan – Hertford – Settlement Appraisal and New Draft Chapter 7 leads to item 55, East Herts District Plan - Proposed Amendments to Final Text of the East Herts District Plan Pre-Submission Version, 2016
  • East Herts Draft District Plan – Hertford – Settlement Appraisal and New Draft Chapter 7 leads to item 58, Sustainability Appraisal (SA) of the East Herts District Plan - Pre-Submission Version 2016
  • East Herts Draft District Plan – Hertford – Settlement Appraisal and New Draft Chapter 7 leads to item 59, Habitat Regulations Assessment (HRA) of the East Herts District Plan - Pre-Submission Version 2016
  • East Herts Draft District Plan – Hertford – Settlement Appraisal and New Draft Chapter 7 leads to item 61, East Herts District Plan – Pre-Submission Version 2016
  • East Herts Draft District Plan – The Gilston Area – Draft Concept Framework, Settlement Appraisal and New Draft Chapter 11 leads to item 51, East Herts Draft District Plan – Bishop’s Stortford – Settlement Appraisal and New Draft Chapter 5
  • East Herts Draft District Plan – The Gilston Area – Draft Concept Framework, Settlement Appraisal and New Draft Chapter 11 leads to item 52, East Herts Draft District Plan – Chapter 10 – Villages: Response to Issues Raised During Preferred Options Consultation
  • East Herts Draft District Plan – The Gilston Area – Draft Concept Framework, Settlement Appraisal and New Draft Chapter 11 leads to item 53, East Herts Draft District Plan – Villages Appraisal and New Draft Chapter 10
  • East Herts Draft District Plan – The Gilston Area – Draft Concept Framework, Settlement Appraisal and New Draft Chapter 11 leads to item 54, East Herts Draft District Plan – Appendices: Response to Issues Raised During Preferred Options Consultation and Updated Appendix C: Monitoring Framework and Appendix D: Glossary
  • East Herts Draft District Plan – The Gilston Area – Draft Concept Framework, Settlement Appraisal and New Draft Chapter 11 leads to item 55, East Herts District Plan - Proposed Amendments to Final Text of the East Herts District Plan Pre-Submission Version, 2016
  • East Herts Draft District Plan – The Gilston Area – Draft Concept Framework, Settlement Appraisal and New Draft Chapter 11 leads to item 58, Sustainability Appraisal (SA) of the East Herts District Plan - Pre-Submission Version 2016
  • East Herts Draft District Plan – The Gilston Area – Draft Concept Framework, Settlement Appraisal and New Draft Chapter 11 leads to item 59, Habitat Regulations Assessment (HRA) of the East Herts District Plan - Pre-Submission Version 2016
  • East Herts Draft District Plan – The Gilston Area – Draft Concept Framework, Settlement Appraisal and New Draft Chapter 11 leads to item 61, East Herts District Plan – Pre-Submission Version 2016
  • East Herts Draft District Plan – East of Stevenage – Settlement Appraisal and New Draft Chapter 12 leads to item 51, East Herts Draft District Plan – Bishop’s Stortford – Settlement Appraisal and New Draft Chapter 5
  • East Herts Draft District Plan – East of Stevenage – Settlement Appraisal and New Draft Chapter 12 leads to item 52, East Herts Draft District Plan – Chapter 10 – Villages: Response to Issues Raised During Preferred Options Consultation
  • East Herts Draft District Plan – East of Stevenage – Settlement Appraisal and New Draft Chapter 12 leads to item 53, East Herts Draft District Plan – Villages Appraisal and New Draft Chapter 10
  • East Herts Draft District Plan – East of Stevenage – Settlement Appraisal and New Draft Chapter 12 leads to item 54, East Herts Draft District Plan – Appendices: Response to Issues Raised During Preferred Options Consultation and Updated Appendix C: Monitoring Framework and Appendix D: Glossary
  • East Herts Draft District Plan – East of Stevenage – Settlement Appraisal and New Draft Chapter 12 leads to item 55, East Herts District Plan - Proposed Amendments to Final Text of the East Herts District Plan Pre-Submission Version, 2016
  • East Herts Draft District Plan – East of Stevenage – Settlement Appraisal and New Draft Chapter 12 leads to item 58, Sustainability Appraisal (SA) of the East Herts District Plan - Pre-Submission Version 2016
  • East Herts Draft District Plan – East of Stevenage – Settlement Appraisal and New Draft Chapter 12 leads to item 59, Habitat Regulations Assessment (HRA) of the East Herts District Plan - Pre-Submission Version 2016
  • East Herts Draft District Plan – East of Stevenage – Settlement Appraisal and New Draft Chapter 12 leads to item 61, East Herts District Plan – Pre-Submission Version 2016

Not carried over

Everything from last time returns in some form.

See the 8 September meeting

This committee over time

Every District Planning Executive Panel meeting we have read, the dates it has set for the future, and each time those dates have changed.

41 meetings, 2007 to 2026Dot size shows the number of papers
2007201020132016201920222025
HeldThis meeting
MeetingItemsPapers
11 Nov 2026Wednesday
0items
0papers
HeldOpen
17 Sep 2026Thursday
10items
16papers
HeldOpen
23 Jun 2026Tuesday
11items
19papers
HeldOpen
19 May 2026Tuesday
13items
20papers
HeldOpen
21 Sep 2017Thursday
8items
19papers
HeldOpen
9 Mar 2017Thursday
9items
27papers
HeldOpen
13 Oct 2016Thursday
7items
17papers
HeldOpen
15 Sep 2016Thursday, this meeting
13items
47papers
8 Sep 2016Thursday
9items
31papers
HeldOpen
25 Aug 2016Thursday
15items
47papers
HeldOpen
21 Jul 2016Thursday
13items
39papers
HeldOpen
24 May 2016Tuesday
13items
46papers
HeldOpen
25 Feb 2016Thursday
7items
21papers
HeldOpen
17 Dec 2015Thursday
6items
12papers
HeldOpen
22 Oct 2015Thursday
7items
17papers
HeldOpen
10 Sep 2015Thursday
7items
18papers
HeldOpen
19 Mar 2015Thursday
6items
14papers
HeldOpen
8 Dec 2014Monday
9items
29papers
HeldOpen
22 Oct 2014Wednesday
10items
35papers
HeldOpen
17 Jul 2014Thursday
10items
33papers
HeldOpen
16 Jan 2014Thursday
8items
25papers
HeldOpen
3 Dec 2013Tuesday
8items
18papers
HeldOpen
18 Nov 2013Monday
7items
11papers
HeldOpen
3 Oct 2013Thursday
9items
19papers
HeldOpen
25 Jul 2013Thursday
9items
26papers
HeldOpen
21 Feb 2013Thursday
11items
36papers
HeldOpen
28 Nov 2012Wednesday
10items
26papers
HeldOpen
26 Jul 2012Thursday
9items
22papers
HeldOpen
29 Mar 2012Thursday
7items
15papers
HeldOpen
24 Nov 2011Thursday
8items
16papers
HeldOpen
7 Jul 2011Thursday
13items
25papers
HeldOpen
23 Sep 2010Thursday
5items
9papers
HeldOpen
27 May 2010Thursday
0items
0papers
HeldOpen
1 Apr 2010Thursday
0items
0papers
HeldOpen
28 Jan 2010Thursday
0items
0papers
HeldOpen
27 Aug 2009Thursday
0items
0papers
HeldOpen
17 Jul 2008Thursday
0items
0papers
HeldOpen
24 Apr 2008Thursday
0items
0papers
HeldOpen
22 Nov 2007Thursday
0items
0papers
HeldOpen
26 Jul 2007Thursday
0items
0papers
HeldOpen
24 Jan 2007Wednesday
0items
0papers
HeldOpen

Follow the District Planning Executive Panel

Choose what you want to hear about. The preview is built from this committee's real papers and changes, so you can see what would have reached you.

What should we tell you?

East Hertfordshire, District Planning Executive Panel

District Planning Executive Panel: 3 kinds of updateEast Hertfordshire, sent the same day
PDF
47 papers published for 15 SeptemberStrategic Flood Risk Assessment, August 2016 and 46 more papers
DAT
Meeting dates updatedAny date added, moved or dropped
DEC
Decisions from 15 SeptemberThe committee's resolutions, the day they are recorded
ABC
"strategic" found in 7 papersDraft Harlow Strategic Sites Assessment, September 2016: ERPA (implications) and Draft Harlow Strategic Sites Assessment, September 2016: ERPB (HSSA)
Each update links to the paper and the council's own copy
Free: one weekly alert. Pro: every option, the same day. Pro Plus: straight into your own systems.

Free

One alert, sent weekly, on titles and decisions.

£0for good
  • 1 alert, weekly summary
  • Titles and decisions
  • Link to every official paper
Save this alert free
Most chosen

Pro

Unlimited alerts the same day, searching every page.

£99per user a month
  • Unlimited alerts, same day
  • Matches inside every page and appendix
  • Every council, not just this one

Pro Plus

Your team, with every match pushed into your own tools.

£449a month, 3 users included
  • Everything in Pro, for 3 users
  • Alerts as webhooks into Slack or a CRM
  • API key and bulk export of this council

Data licence

Every council's records in your own products and research.

£12,000a year, from
  • Unlimited API and full archive delivery
  • Rights to use the data in your products
  • Back to 2000, every council
Talk to us

Never miss what this committee decides

Papers, decisions and date changes for the District Planning Executive Panel, and every other committee you follow, the day they appear.

We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies