RESOLVED That a Meeting be arranged as soon as practicable, between the District Council, Town Council, the Friends of Hubbards Hills, Louth Heritage Group, to discuss the future arrangements for Hubbards Hills. That a Round Table Meeting be arranged to discuss concerns relating to the maintenance, administration and funding of Hubbards Hills.
Word for word from the decision East Lindsey published for this meeting.Source: democracy.e-lindsey.gov.uk
Hubbards Hills Identified Outstanding Works 19th Feb. 2008.
Works Identified June 2007. Location Issue Work required Est. Completion Timescale Bridge Area The railings (Morton and Son, LCC have agreed to the restoration of Louth) need some repairs and these railings and ELDC were to carry repainting. They are starting to be out this work alongside the 2007 over-grown with ivy and need restoration project but LCC are yet to clearing round base. These railings accept our quotation and approve the are the responsibility of LCC work. Highways. ELDC to chase LCC response. The fencing up the slope adjacent to This fence line to be re-instated using 31st March 2008 the bridge approx 4-5m is in urgent chestnut paling fixed onto new stakes need of repair and this needs extending removing the existing wooden frame, 15m along the top of the gabion the 300-400mm gap to the side of the retaining wall to the highway. This is an gate to be filled and the gate to be H&S item in terms of access to the weir, released and chained shut with a PEF7 access to a steep slope and access to lock. stones that are being thrown at vehicles. Order placed with Kenmor. Bridge Access This is in a very poor state of repair This roadway is the responsibility of Road and needs urgent attention. Outside LCC Highways as far as the gate to of H u b b a r d ’ s H i l ls , and LCC the private car park above the toilets. Highways responsibility. LCC have filled the potholes on the bridge as an immediate repair. Following discussions it has been agreed that LCC will affect re- surfacing repairs to the section of the roadway by the toilets at their earliest convenience. ELDC to chase LCC response. Edwardian Ideally the metal railings and gate that The Lincolnshire fencing at this 30th April 2008 Pleasure Garden originally separated the pleasure garden location is to be repaired ensuring the from the main park should be replaced. gateway is adequate to allow Piaggio APE TM vehicles access. Order placed with Kenmor. Summerhouses It is proposed that a concrete floor is 30th Sept 2008 Floor and seating issues still exist within to be installed in this shelter as a the top meadow shelter. long-term solution. No seating will be replaced to help control misuse of this facility. Tiles still being removed from roofs. Altermative roofing materials are to be considered for both shelters. SR to fully investigate options.
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.