CouncilMonitor
194 principal councils 228,996 meetings since 2000 2.8 million official papers archived Straight from each council's own publication system
Elmbridge Borough Council

Draft Response to the Highways England M25 Junction 10 / A3 Wisley Interchange Improvement Scheme Statutory Consultation

Decided Planning 2 papers

Individual Cabinet Member Decision Making - Highways & Transport and Planning Services decided this item on Friday 23 March 2018. Below is the council's own wording, with the papers it was decided on.

Item4/17

Resolved

View the decision text for item 4/17
Word for word from the decision Elmbridge published for this meeting. Source: mygov.elmbridge.gov.uk

Follow this further

Built from Elmbridge's papers

What the report saysPro

Report to Individual Cabinet Member Decision Making - Highways & Transport and Planning Services, 3 pages

Executive summary

Between December 2016 and February 2017, Highways England consulted on two main options for improving the Junction 10/A3 interchange. The need to widen the A3 between Painshill and Ockham was also confirmed, which for safety reasons would necessitate the closure of some local side road junctions and private accesses that currently connect directly with the A3.

A preferred route announcement was made on 29 November 2017 and is the basis for the current statutory consultation which runs until 26th March 2018. This confirmed that Highways England was progressing with a design solution based on Option 14 (the elongated roundabout). Also included were proposals for replacement side roads and access arrangements.

As one of the host authorities for the scheme, the Council wishes to highlight a number of key issues through the consultation process.

Recommendation: that

the Council’s response to the M25 Junction 10/A3 Wisley Interchange Improvement Scheme statutory consultation (as set out in Appendix ‘A’ to this report) be approved and submitted to Highways England by 26 March 2018.

Report:

1 Introduction 1 1.1 The need for an improvement scheme was identified in the Government’s first national Road Investment Strategy 2015 – 2020, which was published in March 2015. This document identified key investments in the strategic road network for the country. The M25 junction 10/A3 Wisley interchange was identified for improvements as it experiences heavy congestion on a daily basis. This causes queues and prevents access from Ockham Park junction (A3) to the M25 junction 10 and on to Painshill junction (A3) in both directions. A similar problem is experienced by traffic entering and exiting the M25 Junction 10/A3 Wisley interchange. The area around M25 junction 10/A3 Wisley interchange also has the highest recorded collision rate across the Highways England network. The current junction is already operating at capacity, and, without intervention, will fail to support future traffic increases.

1.2Between December 2016 and February 2017, Highways England consulted on two main options for improving the interchange. The need to widen the A3 between Painshill and Ockham was also confirmed, which for safety reasons would necessitate the closure of some local side road junctions and private accesses that currently connect directly with the A3. A preferred route announcement was made on 29 November 2017, confirming that Highways England was progressing with a design solution based on Option 14 (the elongated roundabout). This option meets the scheme transport and safety objectives, but with significantly less environmental impact that the alternative option consulted on during 2016/17

1.3In summary the key scheme objectives are to:

 Improve journey time reliability and reduce delay  Improve safety and reduce both collision frequency and severity  Improve crossing facilities for pedestrians, cyclists and horse riders and incorporate safe, convenient, accessible and attractive routes  Minimise impacts on the surrounding local road network  Support projected population and economic growth in the area

1.4Given the environmentally sensitive nature of the surrounding area the scheme also has a number of environmental design objectives:

Read every report as text, not just the decision

Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.

Papers for this item

Kept in our archive, download once signed in
PDF
Elmbridge Borough Council’s Response to the Highways England M25 Junction 10/A3 Wisley Interchange Improvement Scheme Statutory Consultation. /17Appendix A 6 pages Download
PDF
Draft Response to the Highways England M25 Junction 10 / A3 Wisley Interchange Improvement Scheme Statutory ConsultationReport 3 pages DownloadRead as text

At this meeting

Whole meeting
3/17Declarations of InterestDecided
4/17Draft Response to the Highways England M25 Junction 10 / A3 Wisley Interchange Improvement Scheme Statutory ConsultationThis decision
4Agreed Response to the Highways England M25 Junction 10 / A3 Wisley Interchange Improvement Scheme Statutory ConsultationOn the agenda

More from Elmbridge Individual Cabinet Member Decision Making - Highways & Transport and Planning Services

All decisions
MeetingDecisionOutcome
23 Mar 2018 Declarations of InterestView the decision text for item 3/17 Decided Open
25 Jan 2017 Highways England M25 Junction 10 / A3 Wisley Interchange Improvement Scheme ConsultationView the decision text for item 2/16 Decided Open

We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies