Licensing and Planning Policy Committee approved this item on Thursday 9 September 2021. Below is the council's own wording, with the papers it was decided on.
Following consideration, it was resolved unanimously that the Committee: (1) Approve grounds of response to SWR consultation as set out in appendix 1. (2) Agreed to Delegate authority to the Head of Planning, in consultation with the Chair of the Committee, to submit a final consultation response.
Word for word from the decision Epsom and Ewell published for this meeting.Source: democracy.epsom-ewell.gov.uk
1.1There is significant concern that a permanent reduction in the frequency of rail services serving stations in Epsom and Ewell would be contrary to the Borough’s growth and sustainability ambitions. Licensing and Planning Policy Committee 9 September 2021 2 Background
2.1Due to anticipated reduced commuting demand compared with pre pandemic levels, SWR are proposing not to increase the frequency of trains to pre pandemic levels across much of their network, including the “Main Suburban” routes, from December 2022. This is to ease congestion at points on the network closer to London Waterloo.
3 Assessment
3.1The full details of the proposed changes to the SWR timetable to commence in Dec 2022 are set out at Appendix 2 (consultation document). The changes will have an impact on the stations in Epsom and Ewell because SWR operate on the Waterloo to Dorking and Waterloo to Guildford via Leatherhead line. The changes will comprise a reduction in frequency from pre pandemic levels. At Epsom station, this will mean that the frequency of SWR services (not Southern Services) stopping at Epsom will be permanently reduced from 6 to 4 per hour on peak (0800-0859) and 4 to 2 off peak (which is the same as current frequencies).
Justification for changes
3.2SWR base their proposals on the findings of a Network Rail South West Main Line Strategic Study (Looking forward to 2050)1 published in July 2021. Relying on that study, SWR anticipate that commuter travel is expected to recover to 60% of Pre Covid 19 demand from December 2022. In addition, the consultation draws attention to the easing of restrictions that have been enabled across the network because fewer trains have been operating during the pandemic. The consultation states that, according to SWR’s own customer feedback surveys, “performance and satisfaction improve significantly when fewer trains run while still meeting demand for our services”.
3.3SWR have justified the proposed reduction in frequency on the following bases:
3.3.1 The current rolling stock is outdated. It will be replaced with up-to- date Arterio trains, which SWR advise will have increased capacity (Improved Rolling Stock).
3.3.2 For stations on the Waterloo to Dorking Line, another railway operator (Sothern Rail) also serves them.
Analysis of Plans:
Improved Rolling Stock
1 https://www.networkrail.co.uk/wp-content/uploads/2021/07/South-West-Main-Line-Strategic- Study.pdf Licensing and Planning Policy Committee 9 September 2021 3.4 It is not clear whether the new trains will be used on the lines that run through Epsom and Ewell, exactly how many more passengers they will be able to transport than current trains or the timescale for their implementation.
Other Operators
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
Follow Licensing and Planning Policy Committee at Epsom and Ewell and we tell you when its next papers are published, before the meeting rather than after it.
Authority Monitoring Report 2025-2026The Committee resolved (8 for, 1 against) to: 1) Note the content of the Authority Monitoring Report for the 2025/26 ...
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.