Resolved
It was AGREED that the content of the report be noted.
Streetscene Policy Development and Review Panel agreed this item on Thursday 8 January 2015. Below is the council's own wording, with the papers it was decided on.
Resolved
It was AGREED that the content of the report be noted.
The purpose of this report is to provide a summary of the Council’s Grounds Maintenance Service. RECOMMENDATION
That the panel notes the content of this report. INTRODUCTION
1. The Grounds Maintenance service plays a key role in delivering the Council’s vision of a safe and attractive place to be and also assists the Council to meet its aim to protect and enhance the environment. The majority of the service is not a statutory obligation with the exception of the burial service element.
2. The service is responsible for the following operations:
Grass cutting
Shrub border, rose bed and hedge maintenance
Floral display maintenance
Winter and summer sports pitch preparation and maintenance
Burial Service
Play area safety inspections, repairs and maintenance
FINANCIAL INFORMATION
3. The service operates on an annual revenue budget of £1,284,000 as detailed below:
Employees £774,000
Transport £210,000
Supplies and services £174,000
Internal recharges £93,000
Depreciation £33,000
4. Hampshire County Council contributes £164,000 towards the maintenance of the highway grass verges, shrub borders and hedgerows under an agency agreement.
SERVICE OPERATION
5. The service is managed by the Operations Manager, assisted by the Grounds Maintenance Supervisor. The operational team consists of 27 full time employees, 1 apprentice and 5 seasonal grass cutting operatives. During periods of peak demand a small number of temporary labour operatives are employed through local recruitment agencies.
6. The usual hours of work are 37 per week. 8am - 4pm Monday to Thursday with a 3.30pm finish on a Friday. Occasional overtime is required to meet service demands and play area inspections are carried out 6 days per week Monday to Saturday.
GRASS CUTTING
7. The service is responsible for cutting over 2.5 million square meters of grass most of which is cut every two to three weeks. The work is seasonal, usually commencing in early March and running through to early November.
8. The highway verges, small open spaces and grass located around the general housing areas are cut approximately every two to three weeks depending on weather, ground conditions and the grass growth rate. Follow up strimming of banks and obstacles are carried out approximately every six weeks.
9. Large parks and open spaces are cut at least twice per month or as conditions allow and winter sports pitches are cut as required to maintain a playable surface.
10. Cemeteries and Council sheltered housing schemes are cut on a frequency of two occasions per month, or as conditions allow. Obstacles are followed up by strimmers during each maintenance visit. At times of peak growth the grass is sometimes collected to ensure these sensitive areas remain safe and attractive.
11. The Council operates an assisted garden scheme for elderly and disabled tenants. The scheme provides a monthly grass cutting service from March to October for residents who are unable to manage their gardens.
SHRUB AND ROSE BORDERS
12. The team maintain over 47,000 square meters of shrub borders on a frequency of two occasions per annum. The main maintenance visit is undertaken during the winter months (November – February) and includes weed removal and formative pruning. A second visit is carried out during the summer to control vegetation encroaching onto adjacent footpaths and roads.
HEDGE MAINTENANCE
13. This operation is carried out throughout the Borough at nearly 400 different locations with almost 43 kilometres (26 miles) of hedgerow trimmed on a frequency of two occasions per annum. The first cut commences in July through to September and the second visit takes place between October and February.
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
PDF |
Annual Review of Grounds Maintenance ServiceReport | 113 KB | DownloadRead as text |
Follow Streetscene Policy Development and Review Panel at Fareham and we tell you when its next papers are published, before the meeting rather than after it.
| Meeting | Decision | Outcome | |
|---|---|---|---|
| 6 Sep 2018 | Discussion on Issues Emerging from Depot TourIt was AGREED that the Head of Streetscene pass on the Panel’s thanks to the Streetscene team who took part in the tour. | Agreed | Open |
| 6 Sep 2018 | Review of Work Programme 2018/19It was AGREED that the work programme for 2018/19 be confirmed. | Agreed | Open |
| 6 Sep 2018 | Review of Textiles RecyclingIt was AGREED that the content of the report be noted. | Agreed | Open |
| 6 Sep 2018 | Exclusion of Press and PublicIt was AGREED that in accordance with Section 100 A( 4) of the Local Government Act 1972, the public and representati... | Agreed | Open |
| 12 Jul 2018 | Review of RecyclingIt was AGREED that the Panel note the content of the report. | Agreed | Open |
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Keeps you signed in and runs your free-paper allowance. Always on.
Counts visits and which pages are used. First-party only, no advertising, never shared.