Resolved
It was AGREED that the Panel notes the content of the report.
Streetscene Policy Development and Review Panel agreed this item on Thursday 5 March 2015. Below is the council's own wording, with the papers it was decided on.
Resolved
It was AGREED that the Panel notes the content of the report.
To provide an update on the progress of the safety surface replacement programme.
That Members note the contents of the report INTRODUCTION
1. The opportunity to play creatively in high-quality environments is essential to the development of children. Through their play they acquire skills and abilities which can be learnt in no other way. It is therefore important for the Council to continue to provide these facilities within easy walking distance of local residents to ensure all the children in the Borough have access to this development opportunity.
2. To achieve the above provision the Council maintains 43 play areas that are located throughout the Borough, mostly on Leisure and Housing open space land.
3. In 2013, as part of a management review of these facilities, Officers from the Streetscene Department carried out a condition survey of all the Council owned play area safety surfaces (Appendix A). The survey revealed that at a number of these sites the play equipment was still providing a good play environment for children however, the safety surfacing (predominantly rubber crumb) was beginning to reach the end of its useful life and was either become worn smooth, and therefore slippery when damp, or was deteriorating and in need of repair or replacement.
4. A report was approved by Council’s Executive in October 2013 that included setting aside funding of £350,000 to implement a programme of works over a ten year period to replace the rubber crumb safety surfacing at all of the Council’s play areas that include this type of surface.
PROGRESS TO DATE
5. The 2013 condition survey identified the sites that were most in need of replacement and the options for the most appropriate type of replacement safety surfacing were assessed.
6. The preferred solution was sand filled artificial turf. This product has been widely used as a play surface on park and school sites nationwide. Local Authority users include Glasgow City Council, Manchester City Council, Dorset County Council and Oldham Metropolitan Council. Sand filled artificial turf was chosen for durability, the ease of on- going maintenance and cost effectiveness and was trialled successfully at Fareham's Park Lane site in June 2013.
7. During 2013 and 2014, tenders were put together that included the use of the ESPO Framework for Outdoor playground Equipment to replace the play surfaces on the areas identified as having rubber crumb most in need of attention.
8. The cost of the works accomplished to date is £60,000 and the sites that have been completed are listed below.
Eastern Parade
Stubbington Rec Play Area
Sarisbury Green Swing Areas 2014
Castle Street Zip Wire
Course Park Crescent Open Space
Clydesdale Open Space
Dore Avenue Open Space Swings, Junior Multi Play and Adventure Trail
Portchester Park Swings and Multi Play
Bath Lane Recreation Ground Basket Swing and Spinners
Locks Heath House Park Swings & Trim Trail
Harbour View Open Space Swing Areas
PLAY AREA REFURBISHMENT PROGRAMME
9. In addition to the on-going safety surface replacement programme work, the Leisure Development team also surveyed the play areas in 2014 to assess the overall site facilities and as a result have put in place a priority refurbishment programme, as shown in the below table, to upgrade the play areas identified as having equipment and infrastructure that is reaching the end of its useful life and therefore requiring replacement.
Year 1 (2015/16) Year 2 ( 2016/17) Year 3 (2017/18)
Park Lane Play Area Drake Close Play Area Newtown Play Area
King George V Play Area Fareham Park Play Saribsury Green Play Area Area Birchen Road Play Area Priory Park Play Area Howerts Close Play Area
Segensworth Play Area Warsash Rec Play Area
Stubbington Rec Play Funtley Rec Play Area Area
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
PDF |
Play Area Safety Surface Replacement ProgrammeReport | 152 KB | DownloadRead as text |
Follow Streetscene Policy Development and Review Panel at Fareham and we tell you when its next papers are published, before the meeting rather than after it.
| Meeting | Decision | Outcome | |
|---|---|---|---|
| 6 Sep 2018 | Discussion on Issues Emerging from Depot TourIt was AGREED that the Head of Streetscene pass on the Panel’s thanks to the Streetscene team who took part in the tour. | Agreed | Open |
| 6 Sep 2018 | Review of Work Programme 2018/19It was AGREED that the work programme for 2018/19 be confirmed. | Agreed | Open |
| 6 Sep 2018 | Review of Textiles RecyclingIt was AGREED that the content of the report be noted. | Agreed | Open |
| 6 Sep 2018 | Exclusion of Press and PublicIt was AGREED that in accordance with Section 100 A( 4) of the Local Government Act 1972, the public and representati... | Agreed | Open |
| 12 Jul 2018 | Review of RecyclingIt was AGREED that the Panel note the content of the report. | Agreed | Open |
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Keeps you signed in and runs your free-paper allowance. Always on.
Counts visits and which pages are used. First-party only, no advertising, never shared.