Resolved
RESOLVED that the Climate Change Scrutiny Panel notes the contents of the presentation.
Climate Change Scrutiny Panel decided this item on Tuesday 16 January 2024. Below is the council's own wording, with the papers it was decided on.
Resolved
RESOLVED that the Climate Change Scrutiny Panel notes the contents of the presentation.
Climate Change Action Plan Update • Last update 04 July 2023
• Project updates Carbon Footprint Reminder 2022/23 Council Carbon Footprint tCO2e • Commitment to carbon neutral in Scope 1 and 2 emissions by 2030 Scope 1 , 1226
• Scope 1 and 2 reduced Scope 3, 1554
by 22% between 2020 and 2023 Scope 2, 280 Scope 1: Vehicle Replacement Programme • 584 tCO2e vehicle emissions in 2022/23
• April 2023: Invest to save approach to reduce running costs in the long-term
• Programme set out to introduce on average 3 EVs a year over next 5 years
• 2023/24 – will see only 2 EVs introduced
• 2024/25 – plan to introduce 4 EVs Scope 1: Vehicle Replacement Programme • New infrastructure:
• Double EV charger unit at Depot will accommodate first wave of EV’s
• Chargers at Fareham Live car park could provide additional capacity if needed
• Fleet Management System training and implementation scheduled for January 2024
• Reviewing vehicle tracking system - should improve route optimisation Scope 1: Hydrotreated Vegetable Oil (HVO) • Reduced vehicle fuel emissions by 299 tCO2e in 2022/23
• Continue to use in 1/3 of fleet in 2023/24 (Garden Waste, Small Vehicles)
• Additional cost of HVO over diesel predicted to be around £50,700 in 2023/24 down from £60,498 in 2022/2023
• Continue similar level of use in 2024/25 Scope 2: Council Electricity Tariffs • Continued with zero-carbon (Nuclear only) electricity tariff for 2024/25 • Market v location emissions • Additional cost of £4,800 per annum
• Utilities Review undertaken (Opportunities Plan Project) • Limited savings opportunities from switching tariffs/suppliers • Staying on existing tariff Scope 1 & 2: Building Decarbonisation Opportunities • Potential Salix Public Sector Decarbonisation bid in Summer 2024 • Focus on replacing heating systems with low carbon solutions • Currently identifying FBC owned sites that could be eligible Scope 2/Wider Borough: New Fareham Live car park • Estimated reduction in electricity emissions of 54 tCO2e a year compared to Osborn Road • Renewable energy generation opportunity discounted due to Town Centre Regeneration Scope 3: Daedalus • Solent Airport: • Non-airside vehicle fleet operating on HVO • Airside vehicle fleet to start using HVO in Winter 2024 • RCA staff campaign focusing on reducing energy usage Scope 3: Leisure Centres • Application submitted October 2023 for both leisure centres for funding from the Swimming Pool Fund • Combined total of £1,498,665 applied for (100% grant funding) • Measures included: • Solar PV • Pool covers • Microfiltration system • Find out if bid successful in January 2024 Renewable Energy Generation • Potential 3.5MW Solar Farm on Council land – Hook Recreation Ground • Report detailing business case likely March Executive • Report will also cover the main aspects of the project: • The site • Consultancy advice received • Development process • Environmental benefits • Operating models • Feasibility study into energy generation opportunities at Daedalus to be progressed Wider Borough: EV Charging Points (EVCP) • Feasibility study: interest in EVCP is very site specific
• Company appointed for the installation of EVCP at Osborn Road car park
• Four chargers to be installed ready for opening
• Also exploring potential opportunities for chargers at the Innovation Centre Wider Borough: Fareham Housing • New Assheton Court development to be powered by ASHP • Includes rooftop PV • Battery storage
• Communal areas will impact on Scope 1 emissions too • New policy for tenants who want to install an electric vehicle charger Wider Borough: Private Housing • Solar Together: 3rd scheme ran in 2023
• Run by iChoosr in partnership with HCC
• Warmer Homes Scheme
• Consortium led by Portsmouth Council
• Local Energy Advice Partnership (LEAP) Wider Borough: Economic Development • UK Shared Prosperity Funding (UKSPF)
• Allocated total of £45,000 for decarbonising business in the local area during 2023/24 and 2024/25
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
PDF |
CC Scrutiny Panel Climate Change Project Update Jan 2024Report | 756 KB | DownloadRead as text |
PDF |
Climate Change Action Plan UpdateReport | 83 KB | Download |
Follow Climate Change Scrutiny Panel at Fareham and we tell you when its next papers are published, before the meeting rather than after it.
| Meeting | Decision | Outcome | |
|---|---|---|---|
| 19 Mar 2025 | Biodiversity DutyRESOLVED that the Panel note the contents of the presentation. | Noted | Open |
| 19 Mar 2025 | Climate Change Action Plan UpdateRESOLVED that the Panel note the contents of the presentation. | Noted | Open |
| 19 Mar 2025 | Eco Titchfield: Greening CampaignRESOLVED that the Panel note the contents of the presentation. | Noted | Open |
| 19 Mar 2025 | Climate Change Scrutiny Panel PrioritiesRESOLVED that the Panel considered the Scrutiny Priorities for the Climate Change Scrutiny Panel. | Decided | Open |
| 14 Jan 2025 | Coastal Partners Project UpdateRESOLVED that Members note the contents of the presentation. | Noted | Open |
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Keeps you signed in and runs your free-paper allowance. Always on.
Counts visits and which pages are used. First-party only, no advertising, never shared.