1. To inform the Committee of the work of the Joint Metrology Laboratory for the period and operational duties to present.
Metrology Laboratory
Operational
2. The laboratory is operating at full-strength.
• Laboratory Supervisor • Technical Supervisor • Metrology Technicians x3 • Senior Support Assistant
All 6 members of staff are available to assist officers from the 5 authorities.
3. The plan to upskill all 3 technicians to the same level is taking shape, with Adam Halfpenny joining Robert Johnston in being fully authorised to cover all metrology tasks. Jamie Campbell has only been at the laboratory since July ’25 but is progressing at an excellent rate. 3 fully qualified technicians will allow for greater support to the 5 authorities, as well as increased capacity for work within the laboratory.
4. Annex 1 gives the annual calibration totals for 2025, plus the corresponding figures for 2024 for comparison purposes. Submissions to the laboratory increased significantly during this period.
5. A 5-year year submission history is attached as Annex 2. The graphs highlight an increasing trend in the number of calibrations and certificates issued by the lab over this period.
6. Phase 2 of the building refurbishment is now complete.
7. The previously reported faulty air conditioning unit within Balance Room 2 has now been replaced. The full costs of £39,000 have been absorbed as part of the phase 2 refurbishment budget. 8. A balance that is used daily for UKAS calibrations has developed a fault that cannot be repaired. A replacement is being sourced with an expected cost in the region of £30,000.
9. Led by Andrew Stephenson of Sunderland TS, the laboratory has hosted 4 weights and measures training days for TS trainees from NETSA, including Tyne and Wear, who will be sitting CTSI exams over the coming year as part of their overall qualification to becoming TSO’s. Utilising the laboratory’s facilities and equipment, further training days are planned to assist those trainees in hopefully passing their exams.
10. On behalf of CTSI, the laboratory is hosting 2 days of weighbridge training in September.
Aid and Advice to Industry
11. The laboratory’s UKAS 17025 accreditation plays a vital role in providing accurate and reliable weight calibration services to many sectors, both locally and nationally, to industries including the pharmaceutical, food manufacturing, and engineering.
12. Each year, the WBTU is booked for a week in May and a week in November with each of the 5 Tyne and Wear authorities allocated the WBTU for a day to test weighbridges within their area. The WBTU is used to check weighbridges in the region are operating legally, and both businesses and customers are being charged the correct amount.
13. The public weighbridge continues to be utilised by local industry and other road users for commercial reasons and to ensure vehicles are roadworthy.
United Kingdon Accreditation Service (UKAS) Calibrations
14. Annual UKAS submissions have increased, and the numbers are presented within Annex 1 of overall submissions.
15. The laboratory underwent a full UKAS assessment in January as part of it’s ongoing accreditation. It was a very successful assessment with only minor non-conformances issued, all of which have now been actioned and closed. This full assessment will be followed by 3 annual surveillance visits, with the next one booked for the 13th of January 2027.
Product Safety
16. The laboratory continues to operate as the sampling hub for the North-East, Yorkshire and Humberside regions, managing a budget of £15,000 to be used for product safety testing on behalf of the Office for Product Safety and Standards (OPSS). Samples submitted for testing this year include:
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
PDF |
Metrology LaboratoryReport | 178 KB | DownloadRead as text |
Follow Tyne and Wear Trading Standards Joint Committee at Gateshead and we tell you when its next papers are published, before the meeting rather than after it.
| Meeting | Decision | Outcome | |
|---|---|---|---|
| 23 Jul 2026 | Appointment of the Chair and Vice-Chair for 2025/26RESOLVED that: i. Cllr Chris Buckley be elected as Chair of the Tyne & Wear Trading Standards Joint Committee for the... | Decided | Open |
| 23 Jul 2026 | Introduction to the Tyne & Wear Trading Standards Joint CommitteeRESOLVED that the Tyne & Wear Trading Standards Joint Committee: i. Noted the report. | Noted | Open |
| 23 Jul 2026 | Terms of ReferenceRESOLVED that the Tyne & Wear Trading Standards Joint Committee: i. Agreed an amended wording to the Membership secti... | Agreed | Open |
| 23 Jul 2026 | The Tyne and Wear Metrology LaboratoryRESOLVED that the Tyne & Wear Trading Standards Joint Committee: i. Noted the report; ii. Requested that a report be ... | Noted | Open |
| 23 Jul 2026 | 2025/26 outturn and first quarter review 2026/27RESOLVED that the Tyne & Wear Trading Standards Joint Committee: i. Noted the report. | Noted | Open |
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Keeps you signed in and runs your free-paper allowance. Always on.
Counts visits and which pages are used. First-party only, no advertising, never shared.