Planning and Development Committee, Wednesday 9 September 2026 at 5.30pm

No.2 - St Cuthberts Clearance Area Land Between Askew Road

Approved Planning 2 papers

AI summaryGateshead Planning and Development Committee has granted planning permission for up to 85 homes on the St Cuthberts clearance area between Askew Road and the Redheugh Bridge slip road, including 6 affordable homes, subject to a long list of conditions covering drainage, ecology, materials and highways.

AI summaryIn plain English

Written from the decision and the officer reportPDF Pro
OutcomeApprovedIncludes 6 affordable homes and a new shared access road for Network Rail
MoneyCIL charge £0 per sqmSite is in Residential CIL Zone C
What happens nextCommence within 3 yearsStandard three year time limit from date of permission
Who it affectsSouthern Gateway, Urban Core

What was decided

Planning permission was granted, subject to detailed conditions, with the Service Director of Climate Change, Compliance, Planning and Transport authorised to add, vary or amend conditions as needed.

Earlier draft conditions 3 and 4 on affordable housing were deleted in line with the update report published on September 2026, on the basis of viability evidence submitted by the applicant. Report 5.32, 5.33

The application was previously deferred at the March 2026 meeting over flood risk concerns, but officers now recommend approval after further flood risk and drainage information was received and a revised National Planning Policy Framework was published. Report P1, P2, P3, 5.42

Why

The site is allocated for development in the Southern Gateway sub area of the Urban Core, where residential use is an acceptable form of development under policy SG3, and the latest Housing Delivery Test result for the borough is 96%. Report 5.7, 5.27

Officers accepted the applicant's viability case, agreeing that 6 affordable homes (7%) could be provided instead of the 15% policy target, and that no public art, on site play or open space, or street trees could be required. Report 5.32, 5.34, 5.35

Although the drainage strategy relies mostly on below ground attenuation rather than a fully multifunctional SuDS led approach, giving moderate negative weight, officers were satisfied that flood risk can be managed through a suite of planning conditions and that Northumbrian Water has no objection to discharges limited to 11 litres per second. Report 5.51, 5.52, 5.53, 5.54, 6.2, 6.3

What happens next

The development must begin no later than 3 years from the date of this permission and must be built in complete accordance with the listed approved plans and drawings.

Before commencement, the applicant must submit a final detailed drainage and flood risk management scheme, a Construction Management Plan, a Biodiversity Gain Plan, a Habitat Management and Monitoring Plan for 30 years, and details of materials, hard surfacing, retaining features, a Lighting Design Strategy for Biodiversity and a Travel Plan. Report 5.51, 5.85, P157, P176, P193, 5.94, 5.68

A Grampian style planning condition will be used to secure delivery of the 6 affordable homes and the 10% biodiversity net gain will be met by purchasing biodiversity units from a habitat bank, with at least 11.47 biodiversity units required. Report 5.34, P191

The money

  • £0 per sqm Community Infrastructure Levy charge in Residential CIL Zone C Report P206
  • 6 affordable homes (7%) Affordable housing proposed on site after viability assessment, against a 15% policy target of 13 units Report 5.32
  • 11.47 BU Biodiversity units required to achieve the 10% biodiversity net gain

Options considered

  • Chosen: Grant planning permission, as recommended by officers. Officers concluded that the benefits of delivering 85 homes on a vacant brownfield site outweighed the shortfalls in affordable housing, SuDS, public art, open space and visitor parking. Report 6.2, 6.3
  • Rejected: Refuse permission, as originally recommended in March 2026. Further flood risk and drainage information was submitted after the deferral, addressing earlier concerns and allowing conditions to manage the remaining technical matters. Report P1, P2, 5.42, 5.51, 5.52
  • Rejected: Continue to defer consideration. The applicant has now provided the additional information requested in March 2026 and the scheme is considered acceptable subject to conditions. Report P1, P2, 5.51

Implications

  • Financial: No CIL will be charged because the site is in Residential CIL Zone C at £0 per square metre. Report P206
  • Financial: Only 6 of the expected 13 affordable homes will be provided, accepted on viability grounds and secured by a Grampian planning condition. Report 5.32, 5.33, 5.34
  • Environment and climate: The development is predicted to cause a net loss of 10.05 biodiversity units on site; a 10% net gain must be delivered through off site purchase from a habitat bank, with monitoring for 30 years. Report P193
  • Risk: Surface water discharge is restricted to a maximum of 11 litres per second into the Northumbrian Water sewer, with a full suite of drainage and flood risk conditions to be discharged before development begins. Report 5.51, P26
  • Equalities: 42% of dwellings (36 homes) will be built to Building Regulation M4(2) Category 2 accessible and adaptable standard, exceeding the 25% policy target. Report 5.31
  • Other: The scheme does not include public art, on site play or open space, or street trees, conflicting with policies UC17, MSGP40 and design guidance; officers accepted this on viability grounds. Report 5.35

Who and where

  • Future residents of the proposed 85 homes Report P14
  • Existing residents in St Cuthbert's Road, approximately 100 metres south across Askew Road Report 5.70
  • Existing residents at Worsdell Drive, approximately 80 metres north east across the railway line Report 5.70
  • Network Rail, which shares the new replacement access road into its adjacent operational premises Report 1.5
  • Bridges ward, where the site now falls following May 2026 ward boundary changes, which is deficient in open space and play provision Report 5.35

Timeline

  • Since March 2026: Further flood risk assessments, drainage strategies and consultation responses were submitted and considered Report P2, 5.42
  • 25 March 2026: Planning and Development Committee deferred consideration after officers initially recommended refusal on flood risk grounds Report P1
  • September 2026: Update report published, leading to the deletion of draft affordable housing conditions 3 and 4
  • 9 September 2026: Planning and Development Committee resolved to grant planning permission, subject to conditions
  • Within 3 years of the date of permission: Development must be commenced or the permission will lapse

Plain English for the jargon

  • SuDS: Sustainable Drainage Systems, a way of managing surface water that mimics natural drainage, for example through permeable surfaces, ponds and swales, rather than relying only on underground tanks and pipes.
  • BNG: Biodiversity Net Gain, a statutory requirement for most new development to deliver at least a 10% increase in biodiversity value compared with the site before development.
  • Grampian condition: A planning condition that prevents development starting until a specified action has been taken, often used to secure affordable housing or other off site works.
  • M4(2) Category 2: A Building Regulations standard for accessible and adaptable dwellings, allowing homes to be easily adapted as residents' needs change.
  • CIL: Community Infrastructure Levy, a charge that local authorities can levy on new development to fund infrastructure.
  • NPPF: National Planning Policy Framework, the government's overarching planning policy document for England.
What was decided, why, and what happens next

Pro reads every officer report for you and explains each decision in plain English: the money, the options, the risks, the timeline, each with the paragraph it came from.

Written by AI from the council's published papers. AI can get things wrong: the council's own wording below is the record.Report a problem
ItemPD133

Resolved

That planning permission is GRANTED subject to the following conditions and that the Service Director of Climate Change, Compliance, Planning and Transport be authorised to add, vary and amend the conditions as necessary: Compliance conditions 1. The development shall be carried out in complete accordance with the approved plan(s) as detailed below: • N81-3139-100-P1 Site Location Plan • N81-3139-101-P1 Existing Site Layout • N81-3139-102-P14 Proposed Site Layout • N81-3139-103-P11 Proposed External Finishes • N81-3139-104-P7 Acoustic Glazing Plan • N81-3139-116-P5 Indicative Site Sections • N81-3139-117-P4 Proposed Streetscenes • N81-3139-119-P2 M4(2) Compliant Plots • N81-3139-120-P2 Retention Plan • ASHBUR-END-AS-BB-01.6-5113-5230-Rev6-Sheet201 The Ashburn Working Drawing Pack – Planning Drawings • ASHBUR-END-AS-BB-01.6-5113-5230-Rev6-Sheet201 The Ashburn V1 Working Drawing Pack – Planning Drawings • DARWIN-END-AS-BB-0.13-5113-5070-Rev3-Sheet201 The Darwin Working Drawing Pack – Planning Drawings • FARLEY-DET-AS-BB-01.8-5113-5140-Rev8-Sheet201 The Farley Working Drawing Pack – Planning Drawings • FEWSTO-END-AS-BB-01.5-0000-5230-Rev5-Sheet201 The Fewston Working Drawing Pack – Planning Drawings • KILLIN-DET-AS-BB-01.5-0000-5360-Rev5-Sheet201 The Killington Working Drawing Pack – Planning Drawings • OLDBUR-DET-AS-BB-01.8-5113-5210-Rev8-Sheet201 The Oldbury Working Drawing Pack – Planning Drawings • SELSET-END-AS-BB-01.7-5113-5090-Rev7-Sheet201 The Selset Working Drawing Pack – Planning Drawings • SELSET-END-AS-BB-01.7-5113-5090-Rev7-Sheet201 The Selset V1 Working Drawing Pack – Planning Drawings • SWARBO-END-OPP-BB-01.7-5113-5060-Rev7-Sheet201 The Swarbourn Working Drawing Pack – Planning Drawings • WADDIN-END-AS-BB-01.3-5113-2716-Rev3-Sheet201 The Waddington Working Drawing Pack – Planning Drawings • WALTH-END-AS-BB-01.3-5113-1300-Rev3-Sheet201 The Waltham Working Drawing Pack – Planning Drawings • BB-01.1-22CORE-9060-Rev1-Sheet201 Single Attached Garage – Planning Drawings • BB-01.1-22CORE-9050-Rev1-Sheet201 Single Detached Garage (6x3) • BB-01.1-22CORE-9080-Rev1-Sheet201 Detached Triple Garage • GTC-E-SS-0012_R2-2_1_of_1 Close Coupled Substation Pyramid Roof Detail General Arrangement • 1374_100-RevK Landscape Strategy • 23087-D001-Rev38 Engineering Layout • 23087-D100-Rev14 Proposed Levels Plan • 23087-D200-Rev27 Proposed Drainage Layout • 23087-D205-Rev19 Manhole Schedule Engineering Review • 23087-D206-Rev9 Private Manhole Schedule • P2077-D-1001-RevE Proposed Signage – Redheugh Bridge Any material change to the approved plans will require a formal planning application to vary this condition and any non-material change to the plans will require the submission of details and the agreement in writing by the Local Planning Authority prior to any non-material change being made. 2. The development to which this permission relates must be commenced not later than 3 years from the date of this permission. Conditions 3 and 4 – Affordable Housing are deleted in line with the update report published on the 8 th September 2026. Visual amenity 5. Notwithstanding the approved plans, no external materials shall be used on site for dwellings (including oriel windows), hard surfacing or retaining features until final details of these have been ... view the full minutes text for item PD133
Word for word from the decision Gateshead published for this meeting. Source: democracy.gateshead.gov.uk

Follow this further

Built from Gateshead's papers

What the report saysPro

Report to Planning and Development Committee

Background

This application was previously considered by the Planning and Development Committee on 25 March 2026. At that meeting, officers recommended refusal of planning permission on the grounds that insufficient information had been provided in relation to flood risk. Following representations from speakers and subsequent debate, Members resolved to defer consideration of the application to allow the applicant an opportunity to submit further information addressing the identified flood risk concerns. The additional information has since been provided and the application is now reported back to Committee for determination.

Since March 2026, further consultation has been undertaken in relation to drainage matters. Following consideration of the additional information received, the application is now recommended for approval, subject to appropriately worded planning conditions. These conditions include requirements to secure an acceptable drainage scheme that manages surface water effectively and ensures there is no increased risk of flooding within or beyond the site boundaries.

It should also be noted that since the March committee meeting, a revised National Planning Policy Framework (NPPF) has been published. The application has been assessed against the updated national policy position and officers are satisfied that the proposal would be acceptable, with the revisions to national policy not altering the overall planning balance or the recommendation in this case.

1.0The Application: 1.1 DESCRIPTION OF SITE 1.2 The site is situated to the north west of Askew Road (A184) and is broadly rectangular, with the greater dimension north east to south west. It lies between the Redheugh Bridge (A189) southbound slip road to the south west, the East Coast railway line to the north west, and the neighbouring Network Rail premises to the north east (with Askew Road to the south east).

1.3An existing access road is included in south eastern part of the site, which allows access from Askew Road into the Network Rail premises. This road also continues round to the south western part of the site, ending with a turning head.

1.4Askew Road to the south east is a dual-carriageway, which has undergone highway works to be reduced to single lane, single carriageway. There is a separate planning permission (DC/25/00203/FUL) for development to facilitate this change to the road (i.e. Works that would not fall within permitted development rights for highways authorities).

1.5The same separate application also includes works to relocate the existing access road, using a new replacement junction located further north east along Askew Road, and being directed first north west and then turning north east through the application site for this current planning application (towards the Network Rail land). As such, there is overlap between the two red line boundaries for these applications.

1.6Works have commenced on site to provide the new access road from Askew Road in association with planning permission DC/25/00203/FUL.

Read every report as text, not just the decision

Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.

Papers for this item

Kept in our archive, download once signed in
PDF
No.2: St Cuthberts Clearance Area Land Between Askew RoadReport 424 KB DownloadRead as text
PDF
No.2: St Cuthberts Clearance Area Land Between Askew Road [UPDATE]Report 67 KB Download

At this meeting

Whole meeting

Who was there

19 of 22 attended
RJ
Councillor Ronnie JacksonChair, present
NC
Councillor Neil CarpenterVice-Chair, present
JA
Councillor John AdamsCommittee Member, present
AB
Councillor Arthur BoylinCommittee Member, present
CB
Councillor Chris BuckleyCommittee Member, present
LC
Councillor Lynne CaffreyCommittee Member, present
MH
Councillor Melissa HarkerCommittee Member, present
CH
Councillor Craig HeathcoteCommittee Member, present
ML
Councillor Michael LamportCommittee Member, present
KM
Councillor Kathleen McCartneyCommittee Member, present
RM
Councillor Roger MarajCommittee Member, present
PM
Councillor Peter MaughanCommittee Member, present

All 22 on the meeting page

On this subject at Gateshead

Search all
  1. No.2 - St Cuthberts Clearance Area Land Between Askew RoadThis decision
  2. No.1 - St Cuthberts Clearance Area, Land Between Askew RoadDeferred

More from Gateshead Planning and Development Committee

All decisions
MeetingDecisionOutcome
9 Sep 2026 Planning Applicationsi) That the full planning applications and outline applications specified in the appendix to these minutes be granted... Refused Open
9 Sep 2026 No.1 - Alexandra Guest House, 377 Alexandra Road, Gateshead, NE8 4HYThat permission be GRANTED, subject to the following conditions and the addition of an Operational and Management Pla... Approved Open
9 Sep 2026 No.3 - Discover Leisure PLC,Portobello Road, Birtley, DH3 2SNThat permission be GRANTED subject to the following condition(s) and that the Service Director of Climate Change, Com... Approved Open
9 Sep 2026 No.4 - 16 Langdale Road, Gateshead, NE9 5RNThat permission be GRANTED subject to the following condition(s) and that the Service Director of Climate Change, Com... Approved Open
9 Sep 2026 No.5 - Former BAE System Site Ravensworth Road, BirtleyThat permission be GRANTED subject to the following condition(s) and that the Service Director of Climate Change, Com... Approved Open