Resolved
RESOLVED to GRANT PLANNING PERMISSION, subject to the following amended conditions: Conditions 1. The development hereby permitted shall begin not later than three years from the date of this decision. Written confirmation of the date when electricity is first exported to the grid from the wind turbine hereby permitted (First Export Date) shall be submitted to the Local Planning Authority within one month of the date of this taking place. 2. This permission shall endure for a period of 25 years from the first export date (of electricity to the grid), after which the use shall cease, and the turbine, ancillary structures, crane erection and lay down areas shall be removed from the site, and the land restored in accordance with details to be approved in writing under condition 45 below. The site shall be decommissioned in accordance with the details to be approved under condition 45. 3. The development hereby permitted shall be carried out in accordance with the following approved plans except insofar as may be otherwise required by other conditions of this planning permission: Figure 1.3 Rev P5 Detailed Proposed Site Layout Plan (During Construction); Figure 1.4 Rev P1 Detailed Proposed Site Layout Plan (Post Construction); Figure 2.1 R0 Constraints Map (100m to tip); Figure 4.1 Rev P0 Site Entrance Access; Figure 4.2 Rev P3 Road Works Within Compound; Figure 4.3 Rev P1 Road Works Within Compound Near AMP5; Figure 4.4 Rev 0 Typical Widening of Existing Tarmac Site Road; Figure 4.5 Rev 0 Typical Access Track Details New Stone Road; Figure 4.6 Rev P0 Typical Turbine Pile Foundation; Figure 4.8 Rev P0 Indicative 33kV Substation Plan & Elevations; Figure 4.9 Rev 0 Typical Cable Trench Details. 4. The wind turbine shall be of a 3-bladed configuration and not exceed an overall height of 100m measured from ground level to the tips of the turbine blades. The blades of the turbine shall not have a rotor diameter of more than 80m. The hub height of the turbine shall be no more than 60m measured from ground level to the top of the hub. The turbine shall not display any prominent name, logo, symbol, sign or advertisement on any external surface unless otherwise agreed in writing by the Local Planning Authority. The turbine shall not be illuminated and there shall be no permanent illumination on the site, unless otherwise agreed in writing by the Local Planning Authority or required to satisfy any other condition of this planning permission. 5. The 33KV substation to be provided in accordance with figure 4.3 revision P shall have the following maximum dimensions; it shall be no wider than 9m, no longer than 15m and it shall have a ridge height of no more than 6m. 6. The wind turbine and its associated hard standing areas shall be provided in the position indicated in Figure 1.3 Rev P5 subject to a micro siting allowance of 30m as shown on ... view the full minutes text for item 49.