That the Chief Executive and the Director of Organisational Development and Democratic Services be authorised to take any appropriate enforcement action including the service of relevant notices. The Director of Organisational Development and Democratic Services be authorised to take any further legal action following the service of any relevant notices, if such legal action is appropriate.
Word for word from the decision Gedling published for this meeting.Source: democracy.gedling.gov.uk
Report to Planning Committee Application Number: 0087/2015
Location: 80 Church Drive, Daybrook, Nottingham
Breach of Planning Construction of a timber framed and clad garden annex in the Control: rear of the ground floor flat, ancillary use to the ground floor flat.
Site Description and Development
No. 80 Church Drive is an end of terrace two storey property that was previously a dwelling before it was converted into two independent flats, located within the built up area of Daybrook.
The ground floor flat has a separate access off Church Drive and a long narrow rear garden. There is no off-street parking, however, there is a resident parking scheme in place, and access to the rear garden is made through a right of access through a shared entry off Church Drive.
No. 80 is adjoined by another terrace dwelling at no. 78 Church Drive to the south and The Old School Business Centre to the east and north. A 1.8m high brick wall separates the Business Centre from no. 80 Church Drive.
The rear garden level is lower than that the dwelling and slopes downwards to the rear. The wooden construction ground level is approximately 1.5m lower than the Old School Business enter level. All of the other residential properties on Church Drive are terraced two storey dwellings with long and narrow rear gardens.
The structure erected in the garden is a timber framed and clad structure that is to be used occasionally by visiting relatives as an ancillary use to the ground floor flat. The building is comprised of living with kitchenette room, shower room, one bedroom and a store room. Windows are present on all elevations.
The building measures 7.78m deep x 4.47m wide x 2.4m eaves height (2.8m to ridge).
Relevant Planning History
2004/1035 – Planning permission was granted for a single storey rear extension. 2007/0353 – Planning permission was granted to convert the dwelling into two self-contained flats.
2016/0325 – Planning permission was refused for the retention of the timber framed and clad garden annex in the rear of the ground floor flat on grounds relating to the timber structure being used as an independent new dwelling; by reason of the increased level of activity and insufficient access arrangements to the annexe the development has an undue impact on the residential amenity of neighbouring residential properties, contrary to the aims of Policy EN1 of the Gedling Borough Council Replacement Local Plan (Certain Policies Saved 2014) and; the unit to the rear of 80 Church Street would be out of keeping with the pattern of development in the surrounding area contrary to the aim of Policy 10 of the Gedling Borough Council Aligned Core Strategy (September 2014).
In 2012 pre-application advice was sought from the Borough Council in relation to the erection of an ancillary curtilage building to enable support for an elderly relative. Advice was given by the Borough Council stating that, an application for an independent residential unit would unlikely to receive a favourable decision from the Borough Council.
In September 2015 an enforcement investigation was opened relating to an unauthorised development. The Borough Council advised that the development requires full planning permission for an independent residential unit. Subsequently a householder planning application was submitted and determined.
Breach of Planning Control
A breach of planning control is defined in section 171A of the Town and Country Planning Act 1990 as:
a) Carrying out development without the required planning permission; or b) Failing to comply with any conditions or limitation subject to which planning permission has been granted.
Any contravention of the limitations on, or conditions belonging to permitted development rights under the Town and Country Planning (General Permitted Development) Order 2015 constitutes a breach of planning control against which enforcement action may be taken.
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.