That the Service Manager, Development Services, be authorised to take all enforcement action including the service of any necessary enforcement notices and in conjunction with the Director of Organisational Development & Democratic Services, proceedings through the courts if required to ensure that the structure is removed.
Word for word from the decision Gedling published for this meeting.Source: democracy.gedling.gov.uk
1.1In November 2018, it was brought to the Council’s attention that a mobile home had been positioned on garden land to the south east of No. 7 Station Road, Carlton. The land had been separated from the rest of the garden belonging to the main dwelling thus forming a new and separate planning unit.
1.2A Council Officer visited the site and met with the owner who advised the mobile home was being occupied by his son but he wanted his son to move out temporarily and to allow some relatives who were visiting from abroad to stay in the mobile home for the duration of their visit.
1.3An internal inspection of the mobile home showed the caravan had all the facilities for day to day living including a kitchen area with a fridge and microwave, a sitting room area with a TV and a bedroom and shower room.
1.4The courts have made it clear that mobile homes and caravans can only be kept within the residential curtilage of a property providing it is ‘incidental to the enjoyment of the dwelling’ and they require planning permission if they are intended for separate residential accommodation.
1.5A planning application was submitted to retain the mobile home as a residential unit but planning permission was refused on the 6th March 2019. The owner advised the Council’s Enforcement Officer he had no intentions of removing the mobile home.
1.6On Wednesday 21st May 2018 a further site inspection was carried out and it was seen the mobile home was still in position on the land. 2 Site Description
2.1The mobile home is sited on a parcel of land to the south and within the garden area of 7 Station Road, which is a detached dwelling situated within the established residential area of Carlton.
2.2The property is located to the west of Station Road, accessed with a shared driveway which serves no. 7 Station Road and a number of flats within no. 5 Station Road.
2.3The mobile home has been separated from the garden area of the main dwelling by fencing and sits within its own curtilage. The land levels across the site rises steeply to the north which results in the site being set approx. 2 – 3 metres above the adjacent highway. There is an area of hardstanding within the application site which provides off street parking for a minimum of two vehicles. The boundaries of the site are delineated by timber panel and concrete post fences which measure approx. 1.8 metres in height.
3 Planning History
3.1As per paragraph 1.5
4 Assessment
4.1The residential unit comprises of a static caravan which measures approx. 10 metres in length, 3 metres in width and approx. 3.1 metres high when measured from its highest point above the existing ground level. The unit has been finished in Horiz Timber cladding.
4.6The main considerations when deciding whether to take enforcement action in this case are; i) whether the structures are detrimental to the character of the area or to the amenities of the occupiers of nearby properties and whether there are any highway safety issues arising. ii) whether the Local Planning Authority is within the four year statutory time limit for taking action for a material change of use of the land.
Planning policy considerations
4.5One of the core planning principles of the NPPF is to encourage the effective use of land that has been previously developed (brownfield land). The NPPF’s definition of brown field land is ‘previously developed land that is or was occupied by a permanent structure, including the curtilage of the developed land and any associated fixed surface or surface infrastructure.’ This excludes ‘land in built-up areas such as private residential gardens.’
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.