Resolved
To Grant Planning permission subject to Conditions. Conditions 1 The development must be begun not later than three years beginning with the date of this permission. 2 This permission shall be read in accordance with the following plans: Location Plan Dwg No. 18036 SGP C4 XX DR A 131001 Rev B Site Plan Dwg No. 18036 SGP C4 XX DR A 131000 Rev C Drainage Plan Dwg No. TEAL-BSP-ZZ-XX-DR-C-219 P07 Floor Plan Dwg No. 18036 SGP C4 XX DR A 131100 Elevation Plan Dwg No. 18036 SGP C4 XX DR A 131102 Rev A Roof Plan Dwg No. 18036 SGP C4 RL DR A 131101 Landscaping Plan Dwg No. 18036 SGP C4 XX DR A 131003 Rev B Hard Landscaping Plan 18036 SGP C4 XX DR A 131002 Rev C The development shall thereafter be undertaken in accordance with these plans. 3 The total amount of net retail sales floorspace in the foodstore hereby approved shall be limited to a maximum of 1,315 square metres, of which no more than 20% should be devoted to the sale or display of comparison goods. 4 The development hereby approved shall be undertaken in accordance with the submitted surface water drainage scheme based on the principles set forward by the approved Flood Risk Assessment (FRA) and Drainage Strategy. 5 ‘The development shall be undertaken in accordance with the recommendations and findings of the Remediation Strategy produced by BSP Consulted reference 18-0062 dated January 2020, in so far as they relate to the application site’ 6 Prior to occupation of any building(s) a Verification Report (that demonstrates the effectiveness of the remediation carried out) must be submitted and approved in writing by the Local Planning Authority. In the event that contamination is found at any time when carrying out the approved development that was not previously identified it must be reported in writing immediately to the Local Planning Authority and once the Local Planning Authority has identified the part of the site affected by the unexpected contamination development must be halted on that part of the site. An assessment must be undertaken in accordance with good practice and where remediation is necessary a remediation scheme, together with a timetable for its implementation and verification reporting, must be submitted to and approved in writing by the Local Planning Authority. 7 Prior to the occupation of the building hereby permitted, the four ... view the full minutes text for item 129.