Resolved

1) To note the report which confirms that issues relating to SuDS are addressed by existing and emerging policies/guidance and pre-commencement conditions are an effective solution to effectively manage construction phase drainage; and 2) To agree that it is not necessary to produce an SPD specifically on SuDS to ensure adequate drainage is installed first on any new housing development site.
Word for word from the decision Gedling published for this meeting. Source: democracy.gedling.gov.uk

Follow this further

Built from Gedling's papers

What the report saysPro

Report to Cabinet

Wards affected

All

Purpose

The purpose of this report is to consider whether it is necessary to prepare a Supplementary Planning Document (SPD) on the topic of Sustainable urban Drainage Systems (SuDS), specifically requiring the provision of construction phase drainage.

Key Decision

This is not a key decision.

Recommendation(s)

THAT: Cabinet:

1) Note the content of the report; which confirms that issues relating to SuDs more generally are addressed by existing and emerging policies/guidance and pre-commencement conditions are an effective solution to effectively manage construction phase drainage; and

2) Agree that is not necessary to produce a Supplementary Planning Document (SPD) specifically on Sustainable urban Drainage Systems (SuDS) to ensure adequate drainage is installed first on any new housing development site before any other construction works are carried out.

1 Background 1.1 On 20th September 2023 the Council resolved that Cabinet should receive a report to consider the introduction of a Supplementary Planning Document (SPD) that ensures adequate drainage is installed first on any new housing development site before any other construction works are carried out. A key trigger was the occurrence of surface water run-off from two elevated sites during the autumn of 2022, following significant rainfall over a short period of time. Both planning permissions for housing development were permitted subject to conditions requiring surface water drainage schemes being incorporated as part of the overall development scheme, but unfortunately surface water flooding occurred during the early construction phase, prior to the required SuDS being installed. The issue is therefore the need to ensure that development sites are properly drained during their construction, in addition to SuDS which will ultimately serve completed development.

1.2Whilst it is not possible to eliminate flood risk entirely from various sources, policy both national and local seeks to manage and minimise the risk of flooding on-site and elsewhere. In relation to surface water, Aligned Core Strategy (ACS) Policy 1 seeks SuDS wherever practical, and this is echoed in Local Planning Document (LPD) Policy 4 which requires development to have appropriate surface treatments (i.e. permeable surfaces) and SuDS. The subject of this report is to consider whether a SuDS Supplementary Planning Document to augment ACS Policy 1 and LPD Policy 4 would be advantageous in terms of reducing the risk of surface water runoff from development sites at all stages of their development and whether this would add value to current practice.

1.3SuDS are a measure to manage surface water by replicating natural drainage patterns and to deliver benefits in terms of water quality, amenity and biodiversity so they are not simply treated as an engineering feature but a key component of development design. Typical SuDS features include amongst others: permeable paving, rain gardens, swales and detention basins. A number of councils across England have prepared SPDs specifically on the topic of SuDS. A desk top review indicates that in general these are prepared in response to local issues and opportunities.

Read every report as text, not just the decision

Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.

Papers for this item

Kept in our archive, download once signed in
PDF
AppendixAppendix 171 KB Download
PDF
Sustainable Urban Drainage SystemsReport 163 KB DownloadRead as text

At this meeting

Whole meeting

Who was there

8 of 11 attended
JC
Councillor John ClarkeChair, present
MP
Councillor Michael PayneVice-Chair, apologies
DE
Councillor David EllisCommittee Member, present
KF
Councillor Kathryn FoxCommittee Member, present
JH
Councillor Jenny HollingsworthCommittee Member, present
VM
Councillor Viv McCrossenCommittee Member, present
MP
Councillor Marje PalingCommittee Member, present
LP
Councillor Lynda PearsonCommittee Member, present
HW
Councillor Henry WheelerCommittee Member, present
FW
Francesca WhyleyOfficer, in attendance
TA
Tina AdamsOfficer, in attendance

More from Gedling Cabinet

All decisions
MeetingDecisionOutcome
16 Jul 2026 To approve, as a correct record, the minutes of the meeting held on 25.06.26.That the minutes of the above meeting, having been circulated, be approved as a correct record. Approved Open
16 Jul 2026 Forward Plan1) To note the report. Noted Open
16 Jul 2026 Housing Strategy 2026-2030That Cabinet: 1) Noted the representations and comments received during the public consultation, together with the of... Noted Open
16 Jul 2026 Gedling BC Asset Management Plan 2026-2028THAT Cabinet: 1) Agreed to adopt the Asset Management Strategy 2026-2028 at appendix 1. 2) Approved the proposals for... Agreed Open
16 Jul 2026 Gedling Economic Growth FrameworkThat Cabinet: 1) Approved the (2026–2030). 2) Noted the findings within the appendices which have been considered as ... Approved Open

We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies