Resolved
To grant reserved matters approval, subject to the imposition of conditions, as set out in the report: 1. This permission shall be read in accordance with the application form and following list of approved drawings: Document Submitted Reference Planning Layout 28/11/2023 CC-PL-01 Rev D Charter Plan 28/11/2023 CA-CP-01 Rev B Location Plan 21/09/2023 CA-LP-01 Rev A Alnmouth Elevation 21/09/2023 AL_MA_End_R21-903 Rev C Danbury Elevation 21/09/2023 Da_MA_End_R21-903 Rev C Deepdale Elevation 21/09/2023 Dp_MA_End_R21-903 Rev A Glenmore Elevation 21/09/2023 Gl_MA_End_R21-903 Rev B Kingley Elevation 21/09/2023 Kg_MA_End_R21-903 Rev A Sherwood Elevation 21/09/2023 Sh_MA_Det_R21-903 Rev C Barnwood F1 Elevation 21/09/2023 Bw_MA_Det_R21-903 Rev C (Render) Barnwood Elevation 21/09/2023 Bw_MA_Det_R21-903 Rev C Saunton F1 Elevation 21/09/2023 Sa_MA_End_R21-903 Rev C (Render) Saunton Elevation 21/09/2023 Sa_MA_End_R21-903 Rev C Braunton F1 Elevation 21/09/2023 Br_MA_Mid_R21-903 Rev C (Render) Braunton Elevation 21/09/2023 Br _MA_Mid_R21-903 Rev C Rivington Elevation 21/09/2023 Ri_MA_Det_R21-903 Rev C Burnham Elevation 21/09/2023 Bu_MA_Det_R21-903 Rev C Kennet Elevation 21/09/2023 Ke_MA_End_R21-903 Rev C Brampton F1 Elevation 21/09/2023 Bt_MA_Det_R21-903 Rev C (Render) Brampton Elevation 21/09/2023 Bt_MA_Det_R21-903 Rev C Selwood Elevation 21/09/2023 Se_MA_Det_R21-903 Rev C Selwood F1 Elevation 21/09/2023 Se_MA_Det_R21-903 Rev C (Render) Kielder Elevation 21/09/2023 Ki_MA_End_R21-903 Rev C Greenwood F1 Elevation 21/09/2023 Gw_MA_Det_R21-903 Rev C (Render) Greenwood Elevation 21/09/2023 Gw_MA_Det_R21-903 Rev C Ennerdale Elevation 28/11/2023 En_MA_End_R21G-903 Rev B The development shall thereafter be undertaken in accordance with these plans/details. 2. No part of the development hereby permitted shall be brought into use until all drives and parking areas are surfaced in a bound material (not loose gravel). The surfaced drives and parking areas shall then be maintained in such bound material for the life of the development. 3. No part of the development hereby permitted shall be brought into use until the access driveways and parking areas are constructed with provision to prevent the unregulated discharge of surface water from the driveways and parking areas to the public highway. The provision to prevent the unregulated discharge of surface water to the public highway shall then be retained for the life of the development. 4. The landscaping scheme as approved shall be carried out in the first planting season following the completion of the development. Any trees, shrubs or plants that die within a period of five years from the completion of the development, or are removed and/or become seriously damaged or diseased in that period, shall be replaced (and if necessary continue to be replaced) in the first available planting season with others of similar size and species. Reasons 1. For the avoidance of doubt. 2. To reduce the possibility of deleterious material being deposited on the public highway (loose stones etc) and to comply with policy LPD61. 3. To ensure surface water from the site is not deposited on the public highway causing dangers ... view the full minutes text for item 60.