Resolved
To grant reserved matters approval, subject to the imposition of conditions, as set out in the report: Conditions 1. This permission shall be read in accordance with the application form and following list of approved drawings: P21-2773_DE_005_N_1 Planning Layout (1of4) P21-2773_DE_005_N_2 Planning Layout (2of4 Linden) P21-2773_DE_005_N_3 Planning Layout (3of4 Bovis) P21-2773_DE_005_N_4 Planning Layout (4of4 Countryside) P21-2773_DE_006_L_1 Materials Plan P21-2773_DE_006_L_2 Materials Plan P21-2773_DE_006_L_3 Materials Plan P21-2773_DE_006_L_4 Materials Plan P21-2773_DE_007F Boundary Treatment Plan P21-2773_DE_008G Hard Landscaping Plan P21-2773_DE_015_D Presentation Layout P21-2773_EN_0003_E_0003 Northern POS Detailed Soft Landscape Proposal P21-2773_EN_0003_E_0004 Northern POS Detailed Soft Landscape Proposal P21-2773_EN_0003_E_0005 Detailed NEAP Proposal 22095-150G Vehicle Tracking Plan 22095-151E Bus and Refuse Vehicle Tracking 22095-152A Tracking Exercise 3 P21-2773_205B - House Type Pack P21-2773_EN_0001_C_0001 POS Illustrative Landscape Masterplan P21-2773_EN_0002_C_0001 Plot Landscape Strategy Plan P21-2773_EN_0003_D_0006 Detailed Skatepark proposals 22095 - M&H Flood Risk Assessment Combined P21-2773_204A Design Compliance Statement P212773 Planning Statement P21-2773_DE_001_B - Site Location Plan 22095 127 Basin SUDs Plans and Sections Noise Impact Assessment dated 28 November 2023 (Report Reference J004606-7430-RC-02) 2. The multi-use games area shall not be brought into use until the car-park as shown for indicative purposes only on drawing P21-2773_DE_005_N_1 has been surfaced in a bound material (not loose gravel), with the parking bays clearly delineated, and constructed with provision to prevent the discharge of surface water from the car-park to the public highway. The bound material, bay markings, and provision to prevent the discharge of surface water from the car-park to the public highway shall be maintained for the lifetime of the development. 3. No development shall take place, including any works of demolition, until a Construction Method Statement has been submitted to and approved in writing by the local planning authority. The approved Statement shall be adhered to throughout the construction period. The Statement shall provide for: I. the parking of vehicles of site operatives and visitors II. loading and unloading of plant and materials III. storage of plant and materials used in constructing the development IV. the erection and maintenance of security hoarding including decorative displays and facilities for public viewing, where appropriate V. wheel washing facilities VI. measures to control the emission of dust and dirt during construction VII. a scheme for recycling/disposing of waste resulting from demolition and construction works VIII. contact details of the site manager being displayed on-site for members of the public to view. 4. No dwelling served ... view the full minutes text for item 28.