Resolved
RESOLVED to: Grant Planning Permission : Subject to the owner(s) entering into a planning obligation secured through a Section 106 legal agreement with the Borough Council as the Local Planning Authority and the County Council to secure an affordable housing contribution, a contribution towards bus stop infrastructure and travel plan monitoring, a healthcare contribution and a Local Labour Agreement; and the conditions listed for the reasons set out within the report. Conditions 1. The development must be begun not later than the expiration of three years beginning with the date of this permission. 2. The development authorised by this permission shall be carried out in complete accordance with the approved drawings and report specification listed below: 0100 P03 – Site Location Plan 0101 P02 – Existing Site Plan 0102 P08 – Proposed Site Plan 0104 P03 – Ground Floor Plan 0105 P02 – Upper Floors Plan 0106 P02 – Roof Plan 0107 P05 – Boundary Treatment Plan 0108 P02 – Buggy and Bin Store 0120 P06 – North and West Elevations 0121 P04 – South and East Elevations 0122 P06 – Streetscenes 0130 P04 – Site Sections 0140 P03 - Design and Access Statement Existing Drainage Plan P01 Existing Impermeable Area Plan P01 Proposed Foul Water Drainage Plan P02 Proposed Surface Water Drainage Plan P02 Proposed Impermeable Area Plan P02 Proposed Cut and Fill Layout P01 Proposed Levels Layout P04 R/2778/1B – Landscape Masterplan Site Access Plan P05 Swept Path Plan P04 Travel Plan (pb associates, 2024) Air Quality Assessment ( NoiseAir , 2024) Arboricultural Impact Assessment Middlemarch, 2024) Arboricultural Method Statement (Middlemarch, 2024) Biodiversity Statement and Metric assessment (Middlemarch, 2024) Preliminary Ecological Appraisal (Middlemarch, 2024) Energy Statement (Focus, 2024) Flood Risk and Drainage Impact Assessment (GGP Consult, 2024) Phase I Site Appraisal (Patrick Parsons, 2024) Phase II Site Appraisal (Patrick Parsons, 2024) Preliminary Arboricultural Assessment (Middlemarch, 2024) Preliminary Bat Roost Assessment (Middlemarch, 2024) Transport Statement (pb associates, 2024) Planning Statement (Planning Potential 2024) Preliminary Bat Roost Assessment, Ground Level Tree Assessment and Aerial Inspection Survey (Rev A) (Middlemarch, 2024) 3. Occupation of the proposed development shall not take place until the parking layout as shown for indicative purposes on drawing EVS2964-BSA-ARC-00-DR-A-0102 has been provided. The parking layout shall be maintained in accordance with the approved details for the lifetime of the development. 4. Occupation of the proposed development shall not take place until the existing site access has been permanently closed and the crossing has been reinstated to footway with full height kerbs. 5. Occupation of the proposed development shall not take place until the site access is fronted by a dropped kerb vehicular crossing. 6. Occupation ... view the full minutes text for item 49.