To Grant Planning Permission subject to the following conditions: Conditions 1 The development must not be begun later than three years beginning with the date of this permission. 2 The development hereby permitted shall be carried out in strict accordance with the following approved plans and the submitted application form: GRE001-SP-01_rev04- Site Location Plan received 6 March 2025 GRE001-PL-00_rev04 - Existing Site Layout Plan received 18 April 2024 GRE001-PL-01_rev08 - Site Layout Plan received 27 November 2024 GRE001-PL-02_rev08 - Site Layout Plan 1 to 500 received 27 November 2024 GRE001-FS-01_rev07 - Fire Strategy Plan received 27 November 2024 EW-001 Rev. 00 – Earthworks Layout received 18 April 2024 GRE001-EL-01_rev05 - Contextual Elevations (Sheet 1 of 3) received 18 April 2024 GRE001-EL-02_rev02 - Contextual Elevations (Sheet 2 of 3) received 18 April 2024 GRE001-EL-03_rev02 - Contextual Elevations (Sheet 3 of 3) received 18 April 2024 GRE001-SD-01_rev03 - 132kV Substation (Plan) received 18 April 2024 GRE001-SD-02_rev03 - 132kV Substation (Section) received 18 April 2024 GRE001-SD-03_rev02 - 2.4m Palisade Fence and Security Gate received 18 April 2024 GRE001-SD-04_rev02 - 20ft Welfare office or Spares container or SCADA Centre received 18 April 2024 GRE001-SD-05_rev03 - DNO Control Room received 18 April 2024 GRE001-SD-06_rev02 - CCTV Camera And Pole received 18 April 2024 GRE001-SD-07_rev02 - Access Track received 18 April 2024 GRE001-SD-08_rev02 - Aux Transformer received 18 April 2024 GRE001-SD-09_rev02 - Battery Unit received 18 April 2024 GRE001-SD-10_rev02 - Twin Skid (TX) received 18 April 2024 GRE001-SD-11_rev02 - PCSK Inverter received 18 April 2024 GRE001-SD-12_rev02 - Battery Interface Cabinet received ... view the full minutes text for item 63.
Word for word from the decision Gedling published for this meeting.Source: democracy.gedling.gov.uk
Planning Report for 2024/0269 Report to Planning Committee
Application Number: 2024/0269
Location: Land At Burton Wood Farm, Spring Lane, Lambley
Proposal: Proposed Battery Energy Storage System (BESS) and associated infrastructure
Applicant: Grenergy Renewables UK Ltd
Agent: Energy Planning
Case Officer: Calum Smith
This application is required to be considered by Planning Committee given that the floorspace of the proposal would exceed 5000 square metres and to comply with the Constitution.
1. Site Description
1.1The site, measuring approximately 4 hectares, is located within the Nottingham and Derby Green Belt. The site is located within Burton Joyce Neighbourhood Plan boundaries and it is on unallocated land, within open countryside.
1.2Located close to ancient woodland, as identified on the Local Planning Document Policies Map, the site is also close to a designated Local Wildlife Site, Barrons Plantation, which lies to the south. There is a public footpath within the access road into the site and a bridleway in close proximity. With reference to the Greater Nottingham Landscape Character Assessment, the land falls within the Dumbles Rolling Farmland. There is a heritage asset, Lodge Farmhouse and Adjoining Stables approximately 900m (List Entry Number: 1235816) to the east. The nearest residential property from the site is approximately 100m away and is on Lambley Lane.
1.3The site is located within flood zone 1 and is, therefore, land at the lowest risk of flooding.
1.4The application site is accessed from Spring Lane via a farm track which passes a group of agricultural buildings, a number of which appear to be in use for commercial purposes. The site is bound by mature hedgerow, it is currently used for arable farming and when heading in easterly direction the land drops away gradually but significantly by around ten metres. Existing landform levels range from between 94 metres above ordnance datum (AOD) at the most northerly entrance to the site, and 83 metres AOD to the east, based on ordnance survey data. The land is identified as grade 3B agricultural land.
2. Relevant Planning History 2.1. None relevant.
3. Proposed Development
3.1Planning permission is sought for the installation of a Battery Energy Storage System (BESS) and associated infrastructure. The infrastructure would include a security gate, 12 no. twin skids, a 132kV substation, 14 no. security CCTV camera, 1 no. auxiliary transformer, an attenuation pond, 3 banks of battery units, comprising 192 in total, 24 no. PCSK inverters, 48 no. battery interface cabinets, 1 no. storage container, 2 no. customer switchgears, 1 no. welfare office and 1 no. SCADA centre and 6 no. water hydrants.
3.2Due to the change in levels through the site, there will be 4 tiers to absorb the change in levels, which will require an element of retaining walls, with the existing vehicular access to the north unaltered. A new track is proposed within the site to the south of the batteries providing access to the SUD’s pond.
3.3The upper tier close to the access would incorporate ancillary equipment e.g. switchgears, a storage container, a welfare office, and a substation. The lower 3 tiers would have skids, raised 2.9m above ground level, upon which the battery containers would be stored. These would measure 8 metres in length, 3.5 metres in breadth and 6 metres in height, and would appear similar in appearance to a shipping container. The containers would be grouped into 4 and following amendments they would be approximately 1m apart at the nearest point, back to back, but 3m where they contain access panels, doors or deflagration vents.
3.4The site would be surrounded by a perimeter fence and, for vehicles, would be served by the one existing site access from Spring Lane.
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.