AI summaryGosport Borough Council approved a 1,400 sqm boat shed and fabrication warehouse at Victoria Quay, Weevil Lane, supporting 60 marine jobs and an £84 million MoD framework, subject to conditions.
Written from the decision and the officer reportPDF Pro
OutcomeApprovedApplication 26/00007/FULL approved with 13 conditions
Money£84 Million frameworkUK Docks MoD contract over 7 years
What happens nextBegin within 3 yearsDevelopment must start within three years of permission
Who it affectsVictoria Quay marine siteRoyal Clarence Yard Conservation Area, UK Docks
What was decided
Application 26/00007/FULL for a new boat shed and fabrication warehouse at Victoria Quay, Weevil Lane, was granted permission subject to 13 conditions. Report P14, P15, P91
The approved building will be approximately 1,400 sqm, trapezoidal in shape, with 10m high door openings, a 14m building height, and built in steel portal frame construction with Corten-style cladding, stone-effect panels and polycarbonate elements. Report P19, P20, P22
External changes to existing building 48 will relocate roller shuttered openings to the west, with one additional shutter added on the north and west elevations; its height and footprint will not be altered. Report P23
Why
The site is allocated for marine employment within the Waterfront and Town Centre Regeneration Area, and the new building supports the Gosport Waterfront and Town Centre SPD's aim of positioning the borough as a marine services hub. Report P59, P60, P62
The development would generate notable public benefits through safeguarding 42 existing UK Docks jobs and creating 18 new roles including 4 marine apprenticeships under the £84 million MoD framework, which officers weighed against less than substantial harm to heritage assets. Report P70, P71
The 10m door heights and 14m building height are the minimum required to accommodate the crane systems, boat lifting hoist clearances and roller shutter door infrastructure, with reductions rendering the facility impractical for its marine use. Report P64, P65
What happens next
Development must begin within three years of the permission being granted, in line with Section 91 of the Town and Country Planning Act 1990. Report P93
A Construction Environment and Traffic Management Plan covering ecological protection, pollution control, dust, noise, contractor parking and lorry routing must be submitted and approved before any development begins. Report P97
Flood resilience measures reaching at least 600mm above the estimated flood level (4.55m AOD) must be implemented before construction above slab level, alongside an emergency flood evacuation plan, both to be retained for the lifetime of the development. Report P86, P99, P100, P102
The money
£84 Million UK Docks framework agreement with the UK Ministry of Defence over 7 years Report P71
42 existing jobs at the site to be safeguarded under the MoD framework Report P71
18 additional jobs to be created, including 4 new marine mechanical and electrical apprenticeships Report P71
84,000 sqm additional employment floor space target across the borough under Policy LP3 Report P59
Options considered
Chosen: Grant permission subject to conditions. Public benefits of marine employment under the MoD framework outweigh less than substantial harm to heritage assets Report P70, P71, P91
Implications
Legal: Section 72 of the Planning (Listed Buildings and Conservation Areas) Act 1990 requires special attention to preserving or enhancing the Conservation Area; officers concluded less than substantial harm is outweighed by public benefits. Report P31, P70, P71
Climate: The site lies in Environment Agency Flood Zone 3 (1 in 200 year tidal risk); flood resilience, an evacuation plan and safe refuge at mezzanine level are required by condition. Report P48, P86, P99, P100
Other: Adjacency to the Solent and Dorset Coast SPA and Solent Waders and Brent Goose Strategy Low Use Site G59 means a Construction Environmental Management Plan and a 69 dB LAF Max noise limit on boundary works (April to September only) are required. Report P39, P97, P105
Other: The Council's Conservation Officer raised concerns about scale and massing in the Conservation Area; the building height cannot be reduced further without compromising marine use. Report P65, P70
Who and where
UK Docks (applicant) as operator of the marine employment site Report P14, P71
Residents within Royal Clarence Yard, over 150m from the proposals Report P18, P80
Residents in Rope Walk and Cooperage Green, over 100m from the proposals Report P18, P80
Settings of the Grade II listed New South Store and Tank Store and Attached Steam Fire Engine House, and the Grade II* listed Granary and Bakery, plus the non-designated Queen Victoria's Railway Station Report P66, P69
Solent and Dorset Coast SPA and Solent Waders and Brent Goose Strategy site G59 Report P39, P84
Adjacent Oil Pipeline Agency jetty to the south Report P18, P80
31.03.2026 and 16.04.2026: Amended and amplified information received from the applicant Report P15
3rd June 2026: Regulatory Board considered the application and resolved to grant permission Report P3
Within three years of permission: Development must begin Report P93
Plain English for the jargon
SPA: Special Protection Area, a European designation for sites protecting rare and vulnerable bird species
GBLP: Gosport Borough Local Plan 2011 to 2029
SPD: Supplementary Planning Document, providing detailed guidance on specific planning policy areas
NDHA: Non-designated Heritage Asset, a heritage site not formally listed but of local significance
AOD: Above Ordnance Datum, a height reference based on mean sea level
CETMP: Construction Environment and Traffic Management Plan
What was decided, why, and what happens next
Pro reads every officer report for you and explains each decision in plain English: the money, the options, the risks, the timeline, each with the paragraph it came from.
Written by AI from the council's published papers. AI can get things wrong: the council's own wording below is the record.Report a problem
Item8
Resolved
That application 26/00007/FULL be approved , subject to the conditions in the report of the Head of Development Management. 25/00345/FULL - CONVERSION OF EXISTING OFFICE BUILDING INTO 6 FLATS, ERECTION OF SINGLE STOREY FRONT EXTENSION WITH BALCONY, WITH ASSOCIATED CAR PARKING, CYCLE AND REFUSE STORAGE (as amended by plans received 23.04.26 and 20.05.26) 37 - 39 Mumby Road Gosport Hampshire PO12 1AA Morgan Sheldon and Sarah Roberts were invited to address the Board. Morgan Sheldon advised that he had bought the property in 2022 when it was vacant and in a poor state and that, it was the original Charles Mumby Mineral Water Building, and that Mumby Road was its namesake. He had undertaken significant investment in the building and had tried to make it work commercially but it was not viable. He would oversee ... view the full minutes text for item 8.
Word for word from the decision Gosport published for this meeting.Source: democracy.gosport.gov.uk
1. Copies of drawings and accompanying planning applications referred to in this schedule will be made available for inspection by Members from 5.00 pm immediately prior to the meeting. Unless otherwise advised, these plans will be displayed in the room in which the Regulatory Board is to be held.
2. The number of objections and representations indicated in the schedule are correct at the time the recommendations were formulated. Should any representations be made after this date, these will be notified to the Regulatory Board during the officer presentation.
3. An index of planning applications within this schedule can be found overleaf, together with a summary of each recommendation.
DC-AGENDA-VP3-22.05.2026 Page 1 of 23 DC/UNI-form Template Regulatory Board: 3rd June 2026
INDEX
Item Page Appl. No. Address Recommendation No
01. 3- 26/00007/FULL Victoria Quay Weevil Lane Grant Permission 14/1 Gosport Hampshire subject to Conditions
02. 15- 25/00345/FULL 37 - 39 Mumby Road Grant Permission 23/1 Gosport Hampshire PO12 subject to Conditions 1AA
DC-AGENDA-VP3-22.05.2026 Page 2 of 23 DC/UNI-form Template Regulatory Board: 3rd June 2026
ITEM NUMBER: 01. CASE OFFICER: APPLICATION NUMBER: 26/00007/FULL Mark Bridge APPLICANT: MR Ben Mason UK Docks DATE REGISTERED: 12.01.2026
ERECTION OF NEW BUILDING TO FORM A BOAT SHED AND FABRICATION WAREHOUSE WITH ASSOCIATED STAFF FACILITIES, AND ALTERATIONS TO EXISTING BUILDING (48) TO INSTALL NEW DOOR OPENINGS TO PROVIDE ACCESS (CONSERVATION AREA) (as amplified and amended by information received 31.03.26 and 16.04.26) Victoria Quay Weevil Lane Gosport Hampshire
The Site and the proposal
1. The site is within the former Royal Clarence Yard site, and wider Victoria Quay site. The Victoria Quay site comprises various marine related uses, including boat repairs, storage and has a number pontoons within the Harbour. The site projects further into the harbour than the adjacent land to the south and north. The wider site is primarily hard surfaced and includes a number of buildings. There is a slipway to the harbour and an existing boat hoist. The site to which this application relates, is situated towards its eastern end and adjacent to its southern boundary. The site comprises building 48 and an area adjacent to it. The open area is currently occupied by boat storage and temporary structures. The majority of the site is on the east side of building 48 and it extends to approximately 15m from the harbour itself. Building 48 is approximately 9m high and has a low pitched roof and is finished with brick and external cladding and glazed elements. It has a number of large openings, with roller shutters on its east elevation. The site is within the Royal Clarence Yard Conservation Area and there are a number of Listed Buildings within Victoria Quay, along with non-designated heritage assets. The site is situated within the designated Waterfront and Town Centre area, which has its own Supplementary Planning Document (SPD), with Victoria Quay, noted as the Royal Clarence Retained Area, and is also located within Flood Zone 3.
2. The surrounding area is of mixed use, with residential and commercial properties within Royal Clarence Yard to the northwest. Royal Clarence Marina is located directly north of the wider site, which incorporates a significant number of pontoons and moorings. To the south of the site is the boundary of the Oil Pipeline Agency, which includes a jetty that extends a substantial distance into the Harbour, beyond the application boundary and providing an element of visual enclosure on this side. The residential properties within Royal Clarence Yard, to the northwest are in excess of 150m from the proposals. Further residential properties are located within Rope Walk, to the southwest and Cooperage Green, to the west, which are over 100m away.
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.