CouncilMonitor
194 principal councils 228,996 meetings since 2000 2.8 million official papers archived Straight from each council's own publication system
Greater London Authority
Transport Committee, Tuesday 17 January 2012 at 10.00am

Minutes

Decided Committee 4 papers

Transport Committee decided this item on Tuesday 17 January 2012. Below is the council's own wording, with the papers it was decided on.

Item3

Resolved

That the minutes of the meeting of the Transport Committee held on 15 November 2011 be signed by the Chair as a correct record.
Word for word from the decision Greater London Authority published for this meeting. Source: meetings.london.gov.uk

Follow this further

Built from Greater London Authority's papers

What the report saysPro

Report to Transport Committee

Appendix 1

Transport Committee

15 November 2011

Transcript of Agenda Item 6: 2012 Transport

Caroline Pidgeon (Chair): Can we move on to 2012 Transport which is our main item this morning. If I kick off with the questioning. We want to understand what contingency plans you have in place if part of the infrastructure does not work as is planned in the Games or if the Jubilee line, say, was not working for a period. What contingency plans have you got in place and are you confident that they will work?

Hugh Sumner (Director of Transport, ODA): Firstly, may I contextualise it. One of the things we have done prior to the Games is, with our colleagues, invest some £6.5 billion in upgrading the transport infrastructure to provide us not just with great transport during the Games but a long term legacy and a diversity of transport routes. For example, the North London line has been upgraded, the East London line extended, Jubilee line upgraded, Great Eastern line upgraded and, in total, all these schemes, whether it be mainline railway extensions, the Docklands Light Railway (DLR) - with 50% more capacity on the DLR etc – are all designed to provide an upgrade and more routes which spectators can use during Games time. For example, if you take the Olympic Park alone, there are ten different rail routes serving the Park through those three stations and for all competition venues the delivery designs have been selected to have different ways of getting there. Therefore, at the heart of it, is designing redundancy in by having many different routes.

However, there will be challenges during Games time. Somebody will steal some signalling cable, as they do today, and therefore you need to have those contingency measures in place around how you re-route spectators either using the existing road systems or the rail systems or changing mode. During Games time the trick will be then re-routing spectators on those modes or those lines of route where there is the capacity. For example, moving people up on to use the Javelin trains or on to the North London line. Therefore the thing that we have to do is practise re-routing and giving good information out across the various modes, not just within the modes. The key to that success will be the use of the transport co-ordination centre which has been undergoing testing in readiness for the last 12 months and will continue testing in readiness programmes through to Games time.

Caroline Pidgeon (Chair): Can you clarify that you are saying you need to practise re-routing? Are you saying that you are going to be practising a bit of line not being in operation, therefore, how will people get there?

Hugh Sumner (Director of Transport, ODA): Simulating through desk tops and through exercising and working out how you would do things differently, depending on what time of day it is. A lot of the routes depend upon the sports events themselves and they change from day to day of the Games. Therefore, us having a play book of day by day what we do and the contingencies if something happens is very important.

Beneath that, there are then some 26 detailed major contingency plans which are designed to accept the various things that could happen. For example, if the road system goes down because of a water main burst or the loss of signalling on a particular line. All these various contingency measures are being thought through now and practised and desk-topped, and then supported by live exercises as well - all designed to try to provide the resilient transport that Londoners and spectators will demand during Games time.

Caroline Pidgeon (Chair): Can you clarify? You are doing a lot of desktop exercises working out ‚what ifs‛ - which is great - and then you said there are going to be some live exercises; does that mean passengers, potentially, could be moved off a line because you are doing an exercise where you are saying that line is broken and therefore you have got to find alternative routes?

Read every report as text, not just the decision

Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.

Papers for this item

Kept in our archive, download once signed in
PDF
Minutes: Appendix 1: TranscriptMinutes 233 KB DownloadRead as text
PDF
MinutesMinutes 99 KB Download
PDF
View as DOC (3./2) 249 KBMinutes 44 pages Download
PDF
View item 3. as DOC 113 KBMinutes 3 pages Download

At this meeting

Whole meeting

On this subject at Greater London Authority

Search all
  1. MinutesThis decision
  2. MinutesDecided
  3. MinutesDecided
  4. MinutesDecided
  5. MinutesDecided
  6. MinutesDecided

More from Greater London Authority Transport Committee

All decisions
MeetingDecisionOutcome
14 Jul 2026 Declarations of InterestsThat the list of offices held by Assembly Members, as set out in the table at Agenda Item 2, be noted as disclosable ... Noted Open
14 Jul 2026 MinutesThat the minutes of the meeting of the Transport Committee held on 9 June 2026 be signed by the Chair as a correct re... Decided Open
14 Jul 2026 Summary List of ActionsThat the ongoing actions arising from previous meetings of the Committee, and the additional correspondence sent, be ... Noted Open
14 Jul 2026 Transport Committee Work ProgrammeThat the Committee’s work programme , and the additional activity undertaken since its last meeting, namely the site ... Decided Open
24 Jun 2026 Declarations of InterestsThat the list of offices held by Assembly Members, as set out in the table at Agenda Item 2, be noted as disclosable ... Noted Open

We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies