CouncilMonitor
194 principal councils 228,996 meetings since 2000 2.8 million official papers archived Straight from each council's own publication system
Greater London Authority
Transport Committee, Tuesday 21 February 2012 at 10.00am

Minutes

Decided Committee 9 papers

Transport Committee decided this item on Tuesday 21 February 2012. Below is the council's own wording, with the papers it was decided on.

Item3

Resolved

That the minutes of the meeting of the Transport Committee held on 17 January 2012 be signed by the Chair as a correct record.
Word for word from the decision Greater London Authority published for this meeting. Source: meetings.london.gov.uk

Follow this further

Built from Greater London Authority's papers

What the report saysPro

Report to Transport Committee

Appendix 1

Transport Committee

17 January 2012

Transcript of Update on Hammersmith Flyover

Caroline Pidgeon (Chair): Before we move on to river services, we have Leon Daniels here, Managing Director of Surface Transport, Transport for London (TfL). I was wondering, Leon, if you could give us a brief update on the latest on the Hammersmith Flyover, which I know many Londoners are very concerned about?

Leon Daniels (Managing Director of Surface Transport, TfL): I am happy to do that and I am happy to do so having only, on Friday, for the fourth time been inside the Hammersmith Flyover myself with another group of interested parties to see it. Just so that Members are aware, this busy road is part of the A4. The structure was built between 1959 and 1961 and it is of a type of construction that makes it almost unique.

The Hammersmith Flyover is built with concrete sections which are bound together under tension using post-tensioned steel rods. Those rods are bunches of cables that link three or four spans together in overlapping sections. So it is rather like, if I might say so, if you were trying to take ten books off your bookshelves only by holding the outside ones and pushing inwards. That is how the flyover has to be held together.

The Hammersmith Flyover was built to have electric surface heating, like a number of constructions of the period - Spaghetti Junction [Gravelly Hill Interchange] is another one - as a result of which it was never expected to be gritted. The electric surfacing never worked. Therefore, for the last 50 years it has been gritted and the effect of salt water working its way through into the flyover has been the primary cause of the deterioration of these bunches of steel cables.

There are many hundreds of these steel cables and we have been concerned for a couple of years about the rate of deterioration of those cables. They are all encased in concrete. So apart from digging the concrete out, the only way to determine what conditions they are in is by ultrasonic testing, which we installed a year or two ago. From that, we can determine the rate at which those bunches are failing and extrapolate from that how long it is before intervention is required.

We believed, from the results of those tests, that we had a considerable period to think of and design a repair; but, in fact, during December as part of routine checking, when we dug out some concrete and looked at some areas that we thought were sound, they turned out to have failed. The reason the flyover was closed on 22 December 2011 was because, if what we had found in those areas been common throughout the structure then there would have been a danger of collapse. That is the reason it had to be closed without warning. We were very lucky that we then had two weeks of the quiet Christmas traffic period. I know that is not very nice for those people who were forced to use that particular section of road during the Christmas and New Year period but I promise you traffic was lighter and we had a team of up to 80 people working night and day; again, nearly all inside the structure, so nothing to see from the outside. We have carried out a detailed examination of the whole of the structure.

We did not find anything as bad as the section that worried us back in December and, since we now have been able to calculate precisely from the minute inspection the loading resilience in the structure, we were able last Friday to open the traffic to two lanes, one in each direction, of cars only. That is enforced by a width restriction. That can now continue and we are starting work now on the repair.

Read every report as text, not just the decision

Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.

Papers for this item

Kept in our archive, download once signed in
PDF
Minutes: Appendix 1: TranscriptMinutes 57 KB DownloadRead as text
PDF
Minutes: Appendix 2: TranscriptMinutes 138 KB Download
PDF
Minutes: Appendix 3: PresentationMinutes 8.5 MB Download
PDF
Minutes: Appendix 4: TranscriptMinutes 117 KB Download
PDF
MinutesMinutes 112 KB Download
PDF
View as DOC (3./2) 55 KBMinutes 7 pages Download
PDF
View as DOC (3./3) 123 KBMinutes 19 pages Download
PDF
View as DOC (3./5) 122 KBMinutes 20 pages Download
PDF
View item 3. as DOC 130 KBMinutes 4 pages Download

At this meeting

Whole meeting

On this subject at Greater London Authority

Search all
  1. MinutesThis decision
  2. MinutesDecided
  3. MinutesDecided
  4. MinutesDecided
  5. MinutesDecided
  6. MinutesDecided

More from Greater London Authority Transport Committee

All decisions
MeetingDecisionOutcome
14 Jul 2026 Declarations of InterestsThat the list of offices held by Assembly Members, as set out in the table at Agenda Item 2, be noted as disclosable ... Noted Open
14 Jul 2026 MinutesThat the minutes of the meeting of the Transport Committee held on 9 June 2026 be signed by the Chair as a correct re... Decided Open
14 Jul 2026 Summary List of ActionsThat the ongoing actions arising from previous meetings of the Committee, and the additional correspondence sent, be ... Noted Open
14 Jul 2026 Transport Committee Work ProgrammeThat the Committee’s work programme , and the additional activity undertaken since its last meeting, namely the site ... Decided Open
24 Jun 2026 Declarations of InterestsThat the list of offices held by Assembly Members, as set out in the table at Agenda Item 2, be noted as disclosable ... Noted Open

We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies