CouncilMonitor
194 principal councils 228,996 meetings since 2000 2.8 million official papers archived Straight from each council's own publication system
Greater London Authority
Planning Committee, Thursday 18 April 2013 at 10.00am

Summary List of Actions

Noted Planning 4 papers

Planning Committee noted this item on Thursday 18 April 2013. Below is the council's own wording, with the papers it was decided on.

Item4

Resolved

That the completed and outstanding actions arising from previous meetings of the Committee be noted. 4.3 In accordance with Standing Order 2.2D the Chair announced that she would take Items 5 to 8 in a different order from that set out in the agenda.
Word for word from the decision Greater London Authority published for this meeting. Source: meetings.london.gov.uk

Follow this further

Built from Greater London Authority's papers

What the report saysPro

Report to Planning Committee

Appendix 1 London Assembly Planning Committee City Hall The Queen’s Walk London SE1 2AA Switchboard: 020 7983 4000 Minicom: 020 7983 4458 Web: www.london.gov.uk

Boris Johnson Mayor of London Our ref: City Hall Date: 11 March 2013 The Queen’s Walk London SE1 2AA

Dear Mayor Johnson:

Safeguarded wharves review Thank you for the opportunity to respond to the draft Safeguarded Wharves Review 2011/2012. The Committee discussed it at its October 2012 meeting. In a November 2012 letter, Eddie Lister confirmed that the Committee can comment even after consultation has closed. Having received a copy of the URS report analysing freight trade forecasts and broad wharf capacity estimates on 22 January, the Committee is now pleased to submit its view.

1 Introduction Wharves play an important role in London’s industrial sectors, and will become even more important with the emergence of green industries based on the use and reuse of waste. However, the housing crisis and relatively low land value of wharves means there is huge pressure on them, which is why the role planning can play in safeguarding them is so important.

This point was made by James Trimmer, Head of Planning at the Port of London Authority, at the October committee meeting: “In terms of the disparity in value… we were looking at up to 10 times the value between residential and cargo handling, which is effectively industrial uses with a certain added value because of the location specific nature of them to residential. That hope value – which is implicit, basically on a riparian site there is going to be a vast difference in value – was the aim of the directions of course that formed the basis of safeguarding, together with the very, very strong policies, immensely strong policy from the London Plan.”

2 Forecasts underestimate future demand The Safeguarded Wharves Review 2011/2012 identified nine wharves for release from safeguarding because they are now considered surplus to London’s needs. The disparity between demand and capacity was identified by the URS report reviewing freight trade forecasts and broad wharf capacity estimates. The review and its analysis doesn’t consider a number of factors which should have gone into the forecasting, including waste trends and predictions from the Mayor’s draft Business Waste Management Strategy, the future role of

Direct telephone: 020 7983 4393 Fax: 020 7983 4437 Email: [email protected] river transport, and the development of a secondary materials economy. These variables will impact on future demand for wharf capacity.

2.1Waste demand forecast Section 4.6 of the URS report, on waste demand forecasting, claims the “primary source of information on future waste flows is the Mayor’s Draft Municipal Waste Strategy (2010) (DMWS)”. However, this strategy does not include commercial and industrial waste. These waste flows are dealt with by the Business Waste Strategy. Commercial and industrial waste streams, as well as construction, demolition, and excavation, are far larger and much more homogenous, increasing the potential for recycling.

Although the URS report makes references to construction and demolition waste, in particular the implications of the Thames Tideway tunnel, it is not clear to what extent they are considered. With the inclusion of waste categories from both strategies, forecasting would have been radically different.

Read every report as text, not just the decision

Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.

Papers for this item

Kept in our archive, download once signed in
PDF
04(a)Letter from Chair to Mayor re Safeguarding wharvesReport 116 KB DownloadRead as text
PDF
04(b) Safeguarded Wharves: Mayor's responseReport 642 KB Download
PDF
Summary List of ActionsReport 61 KB Download
PDF
View item 4. as DOC 91 KBReport 1 pages Download

At this meeting

Whole meeting

On this subject at Greater London Authority

Search all
  1. Summary List of ActionsThis decision
  2. Summary List of ActionsNoted
  3. Summary List of ActionsNoted
  4. Summary List of ActionsNoted
  5. Summary List of ActionsNoted
  6. Summary List of ActionsNoted

More from Greater London Authority Planning Committee

All decisions
MeetingDecisionOutcome
17 Sep 2015 Declarations of InterestsThat the list of offices held by Assembly Members, as set out on the table at Item 2 on the agenda, be noted as discl... Noted Open
17 Sep 2015 MinutesThat the minutes of the meeting held on 16 July 2015 be signed by the Chair as a correct record. Decided Open
17 Sep 2015 Summary List of ActionsThat the completed and outstanding actions arising from previous meetings of the Committee, as set out in the report,... Noted Open
17 Sep 2015 Housing Supplementary Planning Guidance Consultation ResponseThat the Committee’s response to the Mayor’s consultation on the Draft Interim Housing Supplementary Planning Guidanc... Noted Open
17 Sep 2015 Minor Alterations to the London Plan Examination in PublicThat authority be delegated to the Chair, in consultation with the Deputy Chair, to make submissions on behalf of the... Decided Open

We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies