Item4
Resolved
Greater Manchester Waste Disposal Authority Decision Notice (Stage 2 of 2 of the decision making cycle) Name of Meeting: Recycling, Waste Management and Operations Committee Date of Meeting: 30 th August 2011 Report Deadline: 18 th August 2011 Report Title: Development Options for the Chester Road Household Waste Recycling Centre (HWRC), Stretford Recommendations: Members agreed the implementation of option 1 to amend the existing road layout and public service area, to provide improved traffic flow around the site, dual queuing lanes and additional parking areas on site. Summary of key considerations within the report: The report provided Members with a range of options for the development of the Chester Road HWRC, Stretford. The report identified potential capital and operating costs, predicated performance improvements and operational implications. The three options outlined were: 1. amend the existing road layout and public service area; 2. amend the existing road layout and public service area, removing the sheet piling wall at the front of the site and install bunker walls to improve segregation; and 3. amend the existing road layout and public service area, remove the sheet piling, raise the floor level of the compound and convert the site to a containerised facility. Option 1 sought to significantly improve the traffic flow around the site, giving dual queuing lanes and additional parking areas on site. The proposal also enables increased capacity for small recycling containers in the public access area. This will address the historical issues of vehicles queuing on the public highway that have been experienced at this site. The proposal also allows for sandblasting and repainting of the sheet piled wall on the public facing side with improved signage. In addition, a blocked hatch in the sheet piling on the site will be reopened, giving an additional area for recovery of materials suitable for combusting at Raikes Lane Thermal Recovery Facility (TRF). It is forecast that an additional 5% diversion from landfill could be achieved via the improved road layout and a further 5% via the thermal recovery diversion. This equates to c.1,400 tonnes per annum additional diversion. This would take the performance of the site to a level similar to other high diversion sites. The capital cost for option 1 of £250k is already built into the financial model as are the operating costs with Viridor Laing (Greater Manchester) Limited (VLGM) and would therefore not require any additional expenditure. This is against a potential saving in landfill of £98k per annum based on an average cost of £70 tonne for landfill disposal. Work Programme Ref: RWMO08 Officer Implementing decision: David Taylor, Director of Contract Services "Referral" deadline date: 8 th September 2011 Proposed Implementation date: 9 th September 2011
Word for word from the decision Greater Manchester Combined Authority published for this meeting.
Source: democracy.greatermanchester-ca.gov.uk