Item6
Resolved
Greater Manchester Waste Disposal Authority Decision Notice (Stage 2 of 2 of the decision making cycle) Name of Meeting: Performance, Policy and Resources Committee Date of Meeting: 9 th November 2011 Report Deadline: 31 st October 2011 Report Title: Sale of the Gas Engine, Red Moss, Bolton and Consideration of the Business Case for the Future Energy Generation at Red Moss, Bolton Recommendations: That the Committee: a) requests that the Director of Resources continues in his efforts to dispose of the gas engine at Red Moss closed landfill site, Bolton as delegated to him by the Authority on the 18 th March 2011; and b) approves option d) for future energy generation at Red Moss as outlined in section 6.5 of the report and delegates to the Director of Resources, in consultation with the Chair and Deputy Chair, to implement a trial period, subject to the conclusions of the current assessment of sufficient gas yields and the economical viability of the site. Summary of key considerations within the report: The purpose of the report was provided information on progress on the sale of the gas engine at Red Moss closed landfill site, Bolton and consider the business case for future energy generation at the site. At the 18 th March 2011 Authority meeting delegation was given to the Director of Resources, in consultation with the Chair and Vice-Chair of the Authority, to dispose of the gas engine at Red Moss. It also noted the proposal to develop a business case and options for future energy generation. Progress on this was included in the Landfill Aftercare Review Implementation – Progress Report presented to the Performance, Policy & Resources Committee (PPRC) on the 31 st August 2011. Despite a lot of initial interest in the engine, no bids were received mainly due to the high cost of refurbishment of the engine and the ongoing maintenance costs. Efforts are continuing and the Authority is currently negotiating with a company on a possible sale. The Authority has also investigated the potential for future energy generation to see if a smaller engine would be economically viable and looked at a number of options and costs on how this could operate. These were outlined in section 6. The preferred option is for a third party contractor to install, operate and maintain a new engine on the site with the Authority sharing in any future profits. Work Programme Ref: PPRC 07 Officer Implementing decision: Mark Newall, Director of Resources "Referral" deadline date: 18 th November 2011 Proposed Implementation date: 21 st November 2011
Word for word from the decision Greater Manchester Combined Authority published for this meeting.
Source: democracy.greatermanchester-ca.gov.uk