COLLECTIVE PV/BATTERY PROCUREMENT

Noted Committee 2 papers

Low Carbon Hub Board (to noted this item on Monday 29 July 2019. Below is the council's own wording, with the papers it was decided on.

Item32

Resolved

RESOLVED/- 1. That the Board noted the contents of the report. 2. That the contractual requirements were being finalised and that the GMCA had been asked to delegate approval to GMCA Treasurer, in consultation with the Portfolio Lead, to proceed with the appointment of a Solar PV Collective Purchasing partner, commencing with the pilot in September 2019 be noted. 3. That Officers will forward their further comments and suggestions to the GMCA’s Assistant Director of Environment outside of the meeting.
Word for word from the decision Greater Manchester Combined Authority published for this meeting. Source: democracy.greatermanchester-ca.gov.uk

Follow this further

Built from Greater Manchester Combined Authority's papers

What the report saysPro

Report to Low Carbon Hub Board (to

Purpose of report

The purpose of this paper is to present an opportunity for a Solar PV Collective Purchasing pilot across the 10 districts of Greater Manchester. This proposal aims to support GM’s achievement of the Green Summit aspiration for the City Region to be carbon neutral by 2038, through the increased uptake of local renewable generation. This proposal will complete one of the 5 Year Environment Plan actions to: “examine the potential to establish a GM collective solar PV/battery purchase to drive up residential uptake”.

RECOMMENDATIONS: The Board is asked to:

 Note the contents of the paper and its recommendations  Note that contractual requirements are being finalized and that the GMCA had been asked to delegate approval to GMCA Treasurer, in consultation with the Portfolio Lead, to proceed with the appointment of a Solar PV Collective Purchasing partner, commencing with the pilot in September 19  Advise how Board Member partner organisations could support the delivery of the roll-out

CONTACT OFFICERS:

Mark Atherton, Assistant Director of Environment, GMCA [email protected] 1. Background 1.1. The GM Green Summit, held in March 2019, provided further detail on Greater Manchester’s aspiration to be carbon neutral by 2038, meeting the challenge of climate change and supporting the transition to a smarter and cleaner future whole energy system.

1.2One of the Green Summit outcomes, was the launch of the 5yr Environment Plan for Greater Manchester, detailing what we need to do as a region over the next 5 years. Priority 1 under ‘Our Energy Supply’ stated the need to increase ‘local renewable generation by adding at least a further 45MW by 2024’.

1.3As part of the region’s drive to meet the challenge outlined within the Plan, a range of approaches are required, including leadership through our own estates, commercial, industrial and domestic properties. This proposal aims to target the domestic and small businesses `able to pay’ market through a collective purchasing, reverse auction.

1.4As of 2018, only 2.5% of Greater Manchester’s housing stock had solar PV, which highlights there is opportunity for greater uptake, and a key role for the GMCA and the District Councils to support this.

1.5A Solar PV (photovoltaic) collective purchasing scheme would test the extent that a reverse auction approach can increase domestic rooftop solar installations across the region, currently 62% lower per household than the England average.

1.6Identical reverse solar PV auction schemes have been undertaken in Norfolk, Greater London Authority and Sussex, administered by iChoosr (a specialist procurement company).These schemes benefited from local authority backing providing residents reassurances, which played significant part in their decision to participate. Overall, IChoosr have run 30 schemes over 3 countries resulting in 50,000 installations totaling 175MW of generation with a retail value in excess of £200m.

1.7These schemes have achieved average cost reductions for residents of between 16-35%, for typical 3.5kWh installations, versus open market purchases.

2. Proposal 2.1. It is proposed that GMCA participate in the forthcoming iChoosr scheme planned for September 2019, across the 10 districts. This would provide the city region with the opportunity to increase our renewable generation by circa 5MW (towards our 45MW target), through a private investment of circa £6.7m. The timing proposed is to align with the next IChoosr scheme, which will run across a minimum of 3 UK regions.

Read every report as text, not just the decision

Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.

Papers for this item

Kept in our archive, download once signed in
PDF
05a PV Collective Purchase Annex1Appendix 3.3 MB Download
PDF
COLLECTIVE PV/BATTERY PROCUREMENTReport 434 KB DownloadRead as text

At this meeting

Whole meeting

Who was there

13 of 23 attended
PA
Patrick AllcornCommittee Member, present
MA
Mark AthertonAdvisor, present
MB
Megan BlackAdvisor, present
LB
Louise BlytheCommittee Member, present
EB
Eamonn BoylanAdvisor, apologies
HE
Hisham ElkadiCommittee Member, apologies
PE
Peter EmeryCommittee Member, present
Q
quSecretary, present
RJ
Richard JenkinsCommittee Member, present
PK
Phil KorbelCommittee Member, apologies
RL
Robin LawlerCommittee Member, present
CM
Chris MatthewsCommittee Member, apologies

All 23 on the meeting page

More from Greater Manchester Combined Authority Low Carbon Hub Board (to

All decisions
MeetingDecisionOutcome
29 Jul 2019 Minutes of the meeting held on 15 march 2019RESOLVED/- That the minutes of the meeting held on 15 March 2019 be approved as a correct record. Approved Open
29 Jul 2019 Mission Based Approach - PresentationIt was agreed that Professor Andy Gibson, Manchester University’s Pro-Vice Chancellor would be invited to join the Gr... Agreed Open
29 Jul 2019 Performance Report Quarter 1 2019/20RESOLVED/- 1. The Board noted on the progress outlined in the report and the latest position set out in the dashboard... Noted Open
29 Jul 2019 Governance Changes and Terms of ReferenceRESOLVED/- 1. The Board noted the proposed transition from Low Carbon Hub Board to the Green City Region Partnership ... Noted Open
29 Jul 2019 Draft building retrofit reportRESOLVED/- That the presentation be noted. Noted Open

We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies