Greater Manchester Transport Committee noted this item on Friday 17 January 2020. Below is the council's own wording, with the papers it was decided on.
That the Rail Performance Report be noted. 2. That it be noted that following detailed conversations with the unions, from 26 January, Northern would be re-instating their Sunday services timetable. 3. That it be noted that Northern would review the water leakage problems at Romiley Train Station, and report back directly to Cllr Clark. 4. That it be noted that Northern would review the finish of the recent platform access improvements at Hale Station and report back directly to Cllr Evans. 5. That it be noted that Northern would discuss the delays to their new train introduction programme with the Chair in further detail after the meeting. 6. That it be noted that all train operators would forward details of their compensation schemes to Members of the GM Transport Committee. 7. That it be noted that Network Rail would review the status of the foliage and location of the CCTV cameras at Flowery Field Train Station and respond directly to Cllr Robinson. 8. That thanks be noted to Mark Angelucci, TfGM for his work to support Friends of Train Stations across GM.
Word for word from the decision Greater Manchester Combined Authority published for this meeting.Source: democracy.greatermanchester-ca.gov.uk
Follow this further
Built from Greater Manchester Combined Authority's papers
To provide Members with an update on rail performance in Greater Manchester from Rail Period 05, 2019/20 to Rail Period 09, 2019/20 (21 July 2019 – 07 December 2019).
Recommendations
Members are asked to note the contents of the report.
CONTACT OFFICERS:
Simon Elliott Head of Rail Programme 0161 244 1536
Caroline Whittam Head of Rail Franchising 0161 244 1748 RISK/ FINANCIAL/ LEGAL CONSEQUENCES/DETAILS
o GMTC Rail Performance Report, 13 September, 2019 o GMTC Rail Stations Access for All Mid Tier Programme, 13 September, 2019 o GMCA Rail Performance Report, 01 March, 2019
TRACKING/PROCESS Does this report relate to a major strategic decision, as set out in the No GMCA Constitution
EXEMPTION FROM CALL IN Are there any aspects in this report which N/A means it should be considered to be exempt from call in by the relevant Scrutiny Committee on the grounds of urgency? GMTC Overview & Scrutiny Committee N/A N/A
This report provides a summary of rail network performance in Greater Manchester (GM), focusing on performance from Rail Period 05 in 2019/20 to Period 09, 2019/20 (21 July 2019 – 07 December 2019).
2 BACKGROUND AND OVERVIEW
Rail performance has continued to decline over the five periods which this report covers. Recoveries in performance following the introduction of December 2018 timetables, which were aimed at improving resilience and train reliability, have not been sustained.
Following on from these timetable changes, a further iteration of rail timetables was launched in May 2019. This timetable featured only incremental changes, again with the intention of preserving stability and planned service enhancements were largely deferred, except for the introduction of a new Northern Chester – Leeds service. TransPennine Express (TPE) services reverted to using the Bolton corridor for its Scottish services, with Northern starting to use the West Coast Mainline through Wigan North Western for its Barrow/Windermere – Airport services.
The first electric train services finally began operation along the Bolton corridor in February 2019 between Manchester and Preston using Class 319 refurbished trains, providing enhanced capacity and faster, more comfortable journeys. These have since been supplemented by the incremental addition of new Class 331 electric trains from November 2019. Unfortunately, snagging problems with new rolling stock and ongoing fleet issues with the refurbished electric trains have compounded poor performance.
Both Northern and TPE have experienced on-going delays to the delivery of new rolling stock and the need for this to be put into passenger service as quickly as possible has resulted in condensed timescales for driver training. This has caused continuing driver shortages for both Northern and TPE. For Northern, this has been exacerbated by the failure to agree a new rest day working agreement for its drivers in Central and West regions, resulting in multiple planned and un-planned cancellations on Sundays across Greater Manchester, Merseyside, Lancashire and Cumbria. Various GM routes continue to be affected, although agreed pre-planned cancellations have usually impacted routes where other services are available or Metrolink ticket acceptance can be put into place.
Further to this, increases in late notification sickness in the lead up to Christmas (by 30% for Northern compared to 2018) have led to further pre-planned and late-notification cancellations. On Christmas Eve, this resulted in Northern pre-cancelling 95 Greater Manchester services, with a further 201 pre-cancelled on 27 December.
Follow Greater Manchester Transport Committee at Greater Manchester Combined Authority and we tell you when its next papers are published, before the meeting rather than after it.
Minutes of the Sub Committee MeetingsThat the minutes of the Metrolink & Rail Sub Committee held on 3 March 2023 be noted. 2. That the minutes of the Bus ...
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.