That the report be noted. That the recent announcement by DfT on Access for All funding be noted and that the GMTC receive an update on the approach at the next meeting on 18 February 2022. That the Committee receive an updated report on the approach to the Access for All programme of improvements to take place between 2024 and 2029 prior to submission in April 2022 at the next meeting on 11 March 2022.
Word for word from the decision Greater Manchester Combined Authority published for this meeting.Source: democracy.greatermanchester-ca.gov.uk
Follow this further
Built from Greater Manchester Combined Authority's papers
Appendix C – TOC PPM vs Target and Moving Annual Average
Appendix D – Northern Line of Route/ TPE Service Group Right Time at Destination Percentage
Comments/recommendations from Overview & Scrutiny Committee
Not applicable
Background papers
Nil
Tracking/ Process
Does this report relate to a major strategic decision, as set out in the GMCA Constitution
No Exemption from call in
Are there any aspects in this report which means it should be considered to be exempt from call in by the relevant Scrutiny Committee on the grounds of urgency?
No
GM Transport Committee
Not applicable
Overview and Scrutiny Committee
Not applicable 1. INTRODUCTION/BACKGROUND 1.1. This report provides an update on local rail service operations and performance, covering rail periods 07 and 08, 2021/22 (19 September – 13 November 2021).
1.2The report is structured under subject headings aligned with the following key areas of focus for TfGM in relation to rail service delivery:
Periods 07 and 08 overview Network Rail performance and updates Route crime Train operator performance and updates Details of current train plans and MRTF updates for December 2022 timetable Patronage and footfall figures Christmas and New Year Services Engineering and Events Community Rail
1.3A list of rail period dates for 2021/22 can be found in Appendix A.
1.4A geographic map showing all Greater Manchester rail lines and stations can be found in Appendix B.
1.5Individual PPM vs Target and Moving Annual Average graphs can be found in Appendix C for all six GM TOCs. This also includes cancellation and short formation graphs for Northern and TPE.
1.6Right Time Line of Route performance for Northern and Service Group performance for TPE can be found in Appendix D.
2. OVERVIEW 2.1. This report covers rail periods 07 and 08, between 19 September and 13 November 2021.
2.2Operational performance remained broadly consistent in Period 07 but declined in Period 08, largely as a result of weather-related events and the onset of autumn, with associated railhead issues across the network.
2.3Train services over the periods covered by this report represented around 82% of pre-Covid levels, following the re-instatement of some services which had been temporarily suspended in August. These plans mirrored a similar pattern to the timetable operating briefly in December 2020.
2.4A new national rail timetable was launched on 12 December 2021, featuring some planned enhancements to Greater Manchester services on Sundays and the return of three Avanti trains per hour between Manchester and London.
2.5Patronage levels over the period continued to increase, with Northern reporting around 78% of pre-Covid levels at its highest. Footfall correspondingly increased at Manchester Piccadilly, largely driven by weekend leisure and event demand.
2.6TfGM is currently responding to the detailed timetable consultation as part of the Manchester Recovery Task Force (MRTF). Whilst the preferred option B+ has been chosen, TfGM has some concerns over degradation of connectivity, notably in Wigan and Stockport.
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
Follow Greater Manchester Transport Committee at Greater Manchester Combined Authority and we tell you when its next papers are published, before the meeting rather than after it.
Minutes of the Sub Committee MeetingsThat the minutes of the Metrolink & Rail Sub Committee held on 3 March 2023 be noted. 2. That the minutes of the Bus ...
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.