Resolved
That the contents of the report be noted. 2. That endorsement be given to the development of designs, cost estimates and a programme to enable the carriage of bikes on Metrolink.
Bee Network Committee noted this item on Thursday 12 December 2024. Below is the council's own wording, with the papers it was decided on.
Resolved
That the contents of the report be noted. 2. That endorsement be given to the development of designs, cost estimates and a programme to enable the carriage of bikes on Metrolink.
Bee Network Committee Date: Thursday 12th December 2024
Subject: Bikes on Metrolink Pilot Evaluation
Report of: Danny Vaughan, Chief Network Officer, TfGM
Purpose of Report To provide a progress update on the guided pilot of the carriage of non-folding bikes on Metrolink trams and outline the next steps.
Recommendations: The Committee are requested to:
1. Note the contents of the report; and 2. Endorse the development of designs, cost estimates and a programme to enable the carriage of bikes on Metrolink.
Contact Officers Stella Smith, Metrolink Sponsor [email removed]
Richard Nickson, Network Director – Active Travel [email removed]
Ian Davies, Interim Network Director – Metrolink [email removed] Equalities Impact, Carbon and Sustainability Assessment:
Recommendation - Key points for decision-makers It is recommended that as the proposal to allow bikes on Metrolink is taken forward, TfGM continues to work with targeted groups to inform the designs and operational procedures to ensure that any potential adverse impacts are mitigated.
Impacts Questionnaire Impact Indicator Result Justification/Mitigation People with additional accessibility needs using trams may be affected by people bringing their bikes on Metrolink, mitigations will be implemented. Equality and Inclusion A Allowing bikes on Metrolink will provide the opportunity to link journeys with Metrolink and cycling (in the off-peak). This may enable more people to cycle. Physical and mental wellbeing of some passengers could be improved by enabling Health G linked journeys of cycling and Metrolink. Resilience and Adaptation Housing Economy Mobility and Mobility and connectivity across GM will be widened by allowing people with bikes G Connectivity to travel on Metrolink during off-peak times. Carbon, Nature and Allowing bikes on Metrolink would allow an alternative option for some car G Environment journeys and therefore may enable reduction of carbon emissions. Consumption and Production
Allowing bikes on Metrolink would allow an alternative option for some car Contribution to achieving journeys and therefore may enable reduction of carbon emissions. the GM Carbon Neutral 2038 target
Further Assessment(s): Equalities Impact Assessment and Carbon Assessment Positive impacts overall, Mix of positive and Mostly negative, with at G whether long or short A negative impacts. Trade- R least one positive aspect. RR Negative impacts overall. term. offs to consider. Trade-offs to consider.
Impacts Questionnaire – Equality and Inclusion is rated as amber Carbon Assessment Overall Score 0.8
Buildings Result Justification/Mitigation New Build residential N/A
Residential building(s) N/A renovation/maintenance
New build non- residential (including N/A public) buildings Transport Active travel and public Allowing bikes on Metrolink would provide the opportunity to link cycling journeys 0.714 transport with tram. Roads, Parking and N/A Vehicle Access Allowing bikes on Metrolink would provide the opportunity to link cycling journeys Access to amenities 1 with tram and may improve access for some people. Vehicle procurement N/A Land Use Land use 1
High standard in Mostly best practice Partially meets best Not best practice No associated terms of practice with a good level of practice/ awareness, and/ or insufficient carbon impacts and awareness on awareness on significant room to awareness of carbon expected. carbon. carbon. improve. impacts.
Carbon Assessment – rated as blue
Risk Management Risks are considered in section 3 of the report and will continue to be managed in line with TfGM’s procedures during the next phase of work.
Legal Considerations Discussions with the operator’s and TfGM’s insurers are underway and the insurers will require further details of modifications to the network and operating procedures once defined.
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
PDF |
Bikes on Metrolink Pilot EvaluationReport | 318 KB | DownloadRead as text |
Follow Bee Network Committee at Greater Manchester Combined Authority and we tell you when its next papers are published, before the meeting rather than after it.
| Meeting | Decision | Outcome | |
|---|---|---|---|
| 24 Sep 2026 | ApologiesApologies were received and noted from Cllr Nazia Rehman (Wigan), City Mayor Paul Dennett (Salford), Cllr Stephen Hom... | Noted | Open |
| 24 Sep 2026 | Appointment UpdatesThat the update on the appointments made at the June meeting of the GMCA be noted. 2. That the appointments of the Ma... | Noted | Open |
| 24 Sep 2026 | Appointments to Outside BodiesThat the appointment of Cllr Barry Winstanley, Cllr Grace Baynham & Cllr Michael Welton to the Greater Manchester Acc... | Noted | Open |
| 24 Sep 2026 | Terms of Reference & Rules of ProcedureThat the terms of reference and rules of procedure be noted. | Noted | Open |
| 24 Sep 2026 | Declarations of InterestThere were none. | Decided | Open |
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Keeps you signed in and runs your free-paper allowance. Always on.
Counts visits and which pages are used. First-party only, no advertising, never shared.