Resolved to defer the item to another meeting allow the committee to consider and address concerns raised by members of the public, in respect of the typography of the site and further advice, to then be tested and discussed at the next convened meeting, in respect of the accuracy of the wildlife and arboriculture surveys.
Word for word from the decision Greenwich published for this meeting.Source: committees.royalgreenwich.gov.uk
The below lists all of the drawings taken into consideration in this assessment:
ML/2023/01, ML/2023/02-D, ML/2023/03-A, ML/2023/04, ML/2023/05-A, ML/2023/06, Arboricultural Impact Assessment and Method Statement, Design and Access Statement Rev A, Site Location Plan, Updated Ecological Walkover and Biodiversity Net Gain Report number: BWEBNGSE183NT(Final – Rev A)
ITEM NO: 6 - Appendices PAGE NO: 1 Appendices
Appendix 2 – Conditions and Informatives
1. Conditions and Reasons for Application Reference 24/1621/F:
1. The development to which this permission relates must be begun not later than the expiration of three (3) years beginning with the date on which the permission is granted.
Reason: As required by Section 91 of the Town and Country Planning Act 1990.
2. The development shall be carried out strictly in accordance with the application plans, drawings and documents hereby approved and as detailed below:
ML/2023/01, ML/2023/02-D, ML/2023/03-A, ML/2023/04, ML/2023/05-A, ML/2023/06, Arboricultural Impact Assessment and Method Statement, Design and Access Statement Rev A, Site Location Plan, Updated Ecological Walkover and Biodiversity Net Gain Report number: BWEBNGSE183NT(Final – Rev A)
Reason: In the interests of good planning and to ensure that the development is carried out in accordance with the approved documents, plans and drawings submitted with the application and is acceptable to the local planning authority.
3. The new residential dwelling hereby approved shall be constructed in those materials as submitted within the application form, namely:
• TBS London Weathered Yellow stock facing brick for the external walls • UPVC windows • Timber external door • Redland concrete plane roof tiles for the roof • Black UPVC rainwater downpipes
and in accordance with the approved drawings.
Reason: To ensure that the high design quality demonstrated in the plans and submission is delivered so that local planning authority may be satisfied as to the external appearance of the building(s) and to comply with Policies D3 of the London Plan (2021), Policies DH1, H5 and H(c) of the Royal Greenwich Local Plan: Core Strategy with Detailed Policies (July 2014) and the Urban Design Guide (2023).
ITEM NO: 6 - Appendices PAGE NO: 2 Appendices 4. Prior to the commencement of the development, a Demolition and Construction Method Statement for the relevant part of the development shall be submitted to, and approved in writing by, the Local Planning Authority. The Method Statement shall include full details of the following:
• loading and unloading of plant and materials; • storage of plant and materials; • programme of works; • measures for traffic management and encouragement of sustainable modes of transport for workers; • details of a vehicle booking system • provision of boundary hoarding and visibility zones of construction traffic routing; • hours of operation; • means to prevent deposition of mud on the highway; • likely noise levels to be generated from plant and construction works; • a dust risk assessment; • means to monitor and control dust, noise and vibrations; • haulage routes; • a site plan identifying location of site entrance, exit, wheel washing, hard standing hoarding (distinguishing between solid hoarding and other barriers such as heras and monarflex sheeting), stock piles, dust suppression, location of water supplies and location of nearest neighbouring receptors; • bonfire policy; and • confirmation that a mobile crusher will/won't be used on site and if so, a copy of the permit and intended dates of operation.
The development shall be constructed in accordance with the approved Plans.
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.