(i) That a Legal Agreement (Statement of Intent) is entered into to secure: · A SANG contribution of £13,263.74 and · An Access Management and Monitoring Contribution of £2502.03 (ii) That upon completion of (i) above, the application be determined by the Director of Development. The preliminary view is that the application should be granted subject to conditions. Amended condition 2: Since the agenda was published, the applicant has submitted a revised site location plan (drawing no. PD101 Rev.A ) to correctly reflect the Council’s land ownership boundaries. The layout of the proposed development, however, remains unchanged. The wording of condition 2 is therefore amended as follows: “2. The development hereby permitted shall be carried out in accordance with the following approved plans: PD102 Rev A, PD103 Rev A and PD104 and additional information received on 7 December 2015, and revised drawing no. PD101 Rev A received on 7 June 2016. Reason: To ensure that the development is carried out in accordance with the approved plans and in the interests of proper planning.”
Word for word from the decision Guildford published for this meeting.Source: democracy.guildford.gov.uk
15/P/02272 – Garages rear of 23-27 Willow Way, Guildford
N
Not to scale App No: 15/P/02272 Type: F 8 Wk Deadline: 17/06/2016 Appn Type: Full Application Case Officer: Zac Ellwood Parish: Stoke Ward: Stoke Agent : Ian Hambly Applicant: Guildford Borough Council HFP Architects Chandos House Back Street Wendover Bucks HP22 6EB
Location: Garages rear of 23-27 Willow Way, Guildford Proposal: Erection of a two storey building comprising three dwellings (2 x 3 bed and 1 x 2 bed), together with associated external works including landscaping and parking spaces following demolition of existing garages.
This application has been referred to the Planning Committee because the Council is the applicant.
Site description. The application site is located in the urban area of Guildford and within the Bellfields residential area. The site contains an area of hardstanding and garaging and is bordered to the north, south and east by residential development and to the west by a railway line.
Two storey semi-detached houses form the predominant type of built development in the local although a number of these properties are link attached at ground floor level giving the impression of a more terraced form of development particularly to the south.
Proposal. Erection of a two storey building comprising three dwellings (2 x 3 bed and 1 x 2 bed), together with associated external works including landscaping and parking spaces following demolition of existing garages.
Relevant planning history. Reference: Description: Decision Appeal: Summary:
07/P/00448 Erection of three, two storey houses Withdrawn N/A and associated external works 19.04.07 including landscaping and parking spaces following demolition of existing garages (amended plans received 14.03.07)
09/P/01100 Erection of two x two storey houses Approved with N/A and one part one/part two storey conditions house together with associated 24.06.11 external works including landscaping and parking spaces following demolition of existing garages (amended plans received 11.08.10)
Consultations. County Highway Authority:The County Highway Authority has undertaken an assessment in terms of the likely net additional traffic generation, access arrangements and parking provision and are satisfied that the application would not have a material impact on the safety and operation of the adjoining public highway. The County Highway Authority therefore has no highway requirements.
Thames Water: Recommend conditions
Network Rail: The developer/applicant must ensure that their proposal, both during construction and after completion of works on site, does not: • encroach onto Network Rail land • affect the safety, operation or integrity of the company’s railway and its infrastructure • undermine its support zone • damage the company’s infrastructure • place additional load on cuttings • adversely affect any railway land or structure • over-sail or encroach upon the air-space of any Network Rail land cause to obstruct or interfere with any works or proposed works or Network Rail development both now and in the future
Third party comments: 2 letters of representation have been received raising no objections to the principle of redevelopment of the site but expressing the following concerns:
back of the garages mark a brick wall border along the length of the garden. Would wish the wall to remain and bricks from the garages to be reused and recycled a number of mature fruit trees lie close to the boundary. Concern that the building work would damage the trees which are very productive and valuable to their owners. removal of garages would leave the garden completely open. Concern for safety of our small children and the additional noise. concern over damage to property during the construction process [Officer comment: this would be a civil matter].
Planning policies. The following policies are relevant to the determination of this application.
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.