RESOLVED to refuse application 19/P/0566 for the following reasons: 1. The proposal, due to the scale, bulk, mass of the building and its proximity to the shared boundaries would result in a cramped, overdevelopment of the plot which would be harmful to the streetscene of Oakham Road South. The proposal is therefore contrary to Policy D1 of the Local Plan: strategy and sites 2019, Policies EH-H7(a)(i) and EH-H8 of the East Horsley Neighbourhood Plan and Chapter 12 of the NPPF. 2. The site lies within the 400m to 5km zone of the Thames Basin Heaths Special Protection Area (TBHSPA). ... view the full minutes text for item PL40
Word for word from the decision Guildford published for this meeting.Source: democracy.guildford.gov.uk
This application has been referred to the Planning Committee because more than 20 letters of objection have been received, contrary to the Officer's recommendation.
Key information The site is inset from the Green Belt.
The proposed development is for a pair of two storey semi detached dwellings with accommodation in the roof space, following the demolition of the existing bungalow and detached garage.
· Each dwelling will comprise four bedrooms · Private outdoor amenity space will be afforded to each dwelling · Two parking spaces will be provided off street per dwelling · The existing vehicular access will be retained in addition to the creation of one new vehicular access point
Proposed dimensions: · Height: 8.6m · Eaves height: 5.1m · Depth 10.2m (at two storey height) · Single storey rear projection of 5.3m (includes roof overhang) · Width: 12.8m
· Parking: 2 spaces per dwelling · Garden depth in excess of 25m
Summary of considerations and constraints
The principle of development is acceptable. The proposal would result in a net increase of one dwelling which adds some favour in weight of the application. The type of development would reflect the surrounding mix of residential units.
The proposed building would reflect the scale of neighbouring building heights and would be of an acceptable design with materials to be conditioned. No unacceptable harm to the character is identified.
No unacceptable harm to residential amenity has been identified.
No adverse impact has been identified regarding highways safety or capacity. Sufficient off street parking is provided for each dwelling.
A S106 agreement is required to secure a SANG contribution and an Access Management contribution in accordance with the updated tariffs set in the Guildford Borough Council Thames Basin Heath Special Protection Area Avoidance Strategy 2017 to avoid any adverse impact. The applicant has agreed to enter into the required S106 agreement.
The application is recommended for approval.
RECOMMENDATION: (i) That a S106 agreement be entered into to secure:
A SANGS contribution and an Access Management and Monitoring Contribution in accordance with the adopted tariff of the SPA Avoidance Strategy to mitigate against the impact on the Thames Basin Heaths Special Protection Area
(ii) That upon completion of (i) above, the application be determined by the Director of Planning and Regeneration. The preliminary view is that the application should be granted subject to conditions.
Approve - subject to the following condition(s) and reason(s) :-
1. The development hereby permitted shall be begun before the expiration of three years from the date of this permission.
Reason: To comply with Section 91 of the Town and Country Planning Act 1990 as amended by Section 51(1) of the Planning and Compulsory Purchase Act 2004.
2. The development hereby permitted shall be carried out in accordance with the following approved plans: 0262/P/02 Ground floor plan, 0262/P/03 1st and 2nd floor plans, 0262/P/04 proposed elevations front and side, 0262/P/05 proposed elevations side and rear, 0262/P/06 Streetscene, 0262/P/07 Survey, 1234-KC-XX-YTREE-TCP01 REV 0 Tree constraints and Tree protection plans, location plan received on 28 March 2019, 0262/P/02A proposed ground floor plan and 0262/P/03A 1st and 2nd floor plan received 9 May 2019, 0262/P/01C Site and location plan, received 11 June 2019.
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.