Item34
Resolved
That the application be approved subject to the following conditions: 1. Time limit for implementation (BE1); 2. Drawing numbers (BE1); 3. Materials submission (BE2); 4. Submission of ground investigation (PR14); 5. Submission of a detailed surface water drainage strategy and design detailing how additional SW runoff would be attenuated and discharged (BE1); 6. Submission of plans to demonstrate that surface water run-off exceedance flow paths would not affect flood risk of adjacent properties (BE1); 7. Submission of Construction Management Plan (BE1 and TP17); 8. Submission of updated Travel Plan (TP16); 9. Foul and surface water shall be drained on separate systems (BE1); 10. Submission of a surface water drainage scheme โ in accordance with comments received from United Utilities and in accordance with the Non-Statutory Technical Standards for Sustainable Drainage System (March 2015) or any subsequent replacement national standards and unless otherwise agreed in writing by the Local Planning Authority, no surface water shall discharge to the public sewerage system either directly or indirectly (BE1); 11. Disabled and cycle parking; and 12. Nesting birds.
Word for word from the decision Halton published for this meeting.
Source: moderngov.halton.gov.uk