Item35
Resolved
That the application be approved subject to the following conditions and Section 106 for provision of off-site public open space. 1. Time limit; 2. Drawing numbers (BE1, BE2 and GE1); 3. Site levels (BE1); 4. Surface water regulation system (PR16 and CS23); 5. Requirement for outfall to be agreed with United Utilities (PR16 and CS23); 6. Phase 2 ground contamination report required (PR14 and CS23); 7. Visibility splay retention (TP17); 8. Facing materials to be agreed (BE1 and BE2); 9. Breeding birds protection (GE21); 10. Tree protection (BE1); 11. Hours of construction (BE1); 12. Construction Management Plan (Highways) (BE1); 13. CEMP inclusive of details of ecological mitigation (GE21); 14. Landscape scheme and implementation (BE1 and GE21); 15. Swift boxes (GE21); 16. Reasonable avoidance measures โ bats (GE21); 17. Japanese knotweed method statement (GE21); 18. Japanese knotweed validation report (GE21); 19. Site Waste Management Plan (WM8); 20. Bat friendly lighting scheme (GE21); 21. Ground contamination (Phase 2 site investigation, remediation strategy, validation report) (PR14); 22. Bin storage details (BE2); 23. Electric vehicle charging points (CS19); 24. Removal of Class A and E permitted development (GE1); 25. Any new or extended hardstanding (flags, clock paving, tarmac, concrete) within the property boundary shall be constructed in such a way as to prevent surface water runoff from the hardstanding onto the highway (TP17); 26. Definitive drawing of residential curtilage (GE1); 27. Retention of rear boundary hedging throughout the lifetime of the development (GE1 and NPPF); 28. No access created from rear of properties onto surrounding Green Belt land throughout lifetime of the development (GE1 and NPPF); and 29. Provision of pedestrian link including offsite highway works (BE1).
Word for word from the decision Halton published for this meeting.
Source: moderngov.halton.gov.uk