Item8
Resolved
That the application be approved subject to conditions relating to the following: 1. Time limit; 2. Drawing numbers (BE1 and BE2); 3. Site levels (BE1); 4. Surface water drainage details required (BE1 and PR16); 5. Phase 2 Ground Contamination Report required (PR14 and CS23); 6. Breeding birds’ protection (GE21); 7. Hours of construction (BE1); 8. Construction Management Plan (Highways) (BE1); 9. Reasonable avoidance measures – bats (GE21); 10. Site Waste Management Plan (WN8); and 11. Electric vehicle charging points (CS19)
Word for word from the decision Halton published for this meeting.
Source: moderngov.halton.gov.uk