Item15
Resolved
That the application be approved subject to the following conditions: 1. Time limit; 2. Drawing number (BE1 and BE2); 3. Site levels to be implemented (BE1); 4. Any new or extended hardstanding (flags, block paving, tarmac, concrete) within the property boundary shall be constructed in such a way as to prevent surface water runoff from the hardstanding onto the highway (BE1 and TP17); 5. Details of sightlines to be provided (BE1 and TP17); 6. Tracking details for HGV’s entering and exiting the site to be provided (TP17); 7. Details of boundary treatment (BE22 and TP17); 8. Surface water drainage details required (BE1 and PR16); 9. Phase 2 ground contamination report required (PR14 and CS23); 10. Facing materials to be implemented (BE1 and BE2); 11. Breeding birds protection (GE21); 12. No development shall begin until details of the soft landscape proposals, as recommended in the submitted Ecology Survey (Bea Landscape Design Ltd, Soft Landscape Proposals number 17-060-03, July 2017) has been submitted to and approved in writing – details to be implemented to an agreed timescale (GE21); 13. The mitigation measures as proposed in the Ecology Survey Report (Clarkson and Woods 5707, version 1, July 2017) and incorporated into the soft landscape proposals should be amended to show nesting box locations and implemented during the construction of the development (GE21); 14. The mitigation measures as proposed in the Ecology Survey Report (Clarkson and Woods 5707, version 1, July 2017) to include a wildflower meadow are to the northwestern corner of the site shall be implemented during the construction of the development or within and agreed timescale (GE21); 15. The lighting proposal as outlined in the Ecology Survey Report (Clarkson and Woods 5707, version 1 July 2017) shall be implemented during the construction of the development and retained throughout the lifetime of the development (GE21); 16. The wildlife management (including maintenance and watering) as outlined in the Ecology Survey Report (Clarkson and Woods 5707, version 1, July 2017) shall be incorporated within the submitted soft landscaping proposal, implemented to an agreed timescale and retained throughout the lifetime of the development (GE21); 17. No development shall begin until details of a Waste Management Plan (incorporating a waste audit) has been submitted to and approved by the Local Planning Authority (LPA). Details to be implemented during the course of construction (WM8); 18. No development shall begin until details of a Construction Environment Management Plan (CEMP) has been submitted to and approved in writing. Details to be implemented during the course of construction (WM8); 19. Hours of construction (BE1); 20. Construction management plan (Highways) (BE1); and 21. Electric vehicle charging points (CS19).
Word for word from the decision Halton published for this meeting.
Source: moderngov.halton.gov.uk