Item37
Resolved
That outline planning permission be granted subject to the following conditions: 1. Time limit – outline permission; 2. Submission of reserved matters; 3. Development parameters; 4. Floorspace restriction; 5. Removal of permitted development rights; 6. Restriction on construction hours (BE1); 7. Vehicle manoeuvring alarm details (BE1); 8. Restriction of external storage (E5); 9. Piling Risk Assessment (PR14 and CS23); 10. Dealing with unidentified contamination (PR14 and CS23); 11. No drainage system for infiltration of surface water (PR14 and CS23); 12. Sustainable Urban Drainage System (PR16 and CS23); 13. Verification of Sustainable Urban Drainage System (PR16 and CS23); 14. Implementation of Mitigation Measures set out in the Flood Risk Assessment (PR16 and CS23); 15. Construction Environmental Management Plan (BE1, GE21 and CS20); 16. Bird nesting boxes scheme (GE21 and CS20); 17. Breeding birds protection (GE21 and CS20); 18. Reasonable avoidance measures – badgers and hedgehogs (GE21 and CS20); 19. Reasonable avoidance measures – reptiles and amphibians (GE21 and CS20); 20. Pre commencement inspection of Ditton Brook (GE21 and CS20); 21. Scheme detailing the installation of green walls to provide habitat for invertebrate species and planting scheme of native species of shrub, and grassland and wildflower mixes on the grassed areas, native shrub and grassland spices (GE21 and CS20); 22. Scheme for the management / eradication of Indian Balsam; 23. Lighting scheme (BE1, GE21, PR4, CS20 and CS23); and 24. Waste audit (WM8).
Word for word from the decision Halton published for this meeting.
Source: moderngov.halton.gov.uk