Item3
Resolved
That the application be approved subject to the following conditions: 1. Time limit โ full permission; 2. Approved plans; 3. Restriction on use; 4. External facing materials (BE1 and BE2); 5. Boundary treatments scheme (BE1); 6. Parking and servicing (BE1); 7. Electric vehicle charging point scheme (CS19); 8. Cycle parking (BE1 and TP6); 9. Pedestrian improvement scheme (BE1 and TP7); 10. Tree protection measures (GE27); 11. Breeding birds protection (GE21 and CS20); 12. Ground contaminations (PR14 and CS23); 13. Drainage strategy (PR16 and CS23); 14. Foul and surface water on a separate system (PR16 and CS23); 15. Waste audit (WM8); and 16. Verification of Drainage Scheme (PR16 and CS23).
Word for word from the decision Halton published for this meeting.
Source: moderngov.halton.gov.uk